GOVERNMENT OF THE UNITED STATES VIRGIN ISLANDS PUBLIC SERVICES COMMISSION IN RE: PSC Docket No. 289 THE VIRGIN ISLANDS WATER AND Order No. 13/2015 POWER AUTHORITY’S LEVELIZED ENERGY ADJUSTMENT CLAUSE ORDER WHEREAS, on August 15, 2014, the Virgin Islands Water and Power Authority’s (hereinafter “WAPA” or “Authority”) filed a Petition with the Virgin Islands Public Services Commission (hereinafter “PSC” or the “Commission”) for the Electric and Water Levelized Energy Adjustment Clause (hereinafter “LEAC”) factors for the period of October 1, 2014 to December 31, 2014; and WHEREAS, on October 29, 2014, WAPA filed a Petition with the PSC seeking reconsideration of PSC Order No. 9/2015; and WHEREAS, on November 24, 2014, the Commission received a Report and Recommendations from its technical consultant, Georgetown Consulting Group, Inc.; and WHEREAS, on November 24, 2014, the Commission met in special session in the Commission’s offices on both St. Thomas and St. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://psc.vi.gov/wp-content/uploads/2024/06/PSC-Order-No.-13-2015-Docket-289-WAPA-RFM-Copy.pdf

SHA-256 00d0ab8142024cd63f50643782d3f3bdbba148bd245be6eb5f3405dad357c65d

Re-using this document

territorial public record

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-00d0ab814202

Document text

GOVERNMENT OF THE UNITED STATES VIRGIN ISLANDS PUBLIC SERVICES COMMISSION IN RE: PSC Docket No. 289 THE VIRGIN ISLANDS WATER AND Order No. 13/2015 POWER AUTHORITY’S LEVELIZED ENERGY ADJUSTMENT CLAUSE ORDER WHEREAS, on August 15, 2014, the Virgin Islands Water and Power Authority’s (hereinafter “WAPA” or “Authority”) filed a Petition with the Virgin Islands Public Services Commission (hereinafter “PSC” or the “Commission”) for the Electric and Water Levelized Energy Adjustment Clause (hereinafter “LEAC”) factors for the period of October 1, 2014 to December 31, 2014; and WHEREAS, on October 29, 2014, WAPA filed a Petition with the PSC seeking reconsideration of PSC Order No. 9/2015; and WHEREAS, on November 24, 2014, the Commission received a Report and Recommendations from its technical consultant, Georgetown Consulting Group, Inc.; and WHEREAS, on November 24, 2014, the Commission met in special session in the Commission’s offices on both St. Thomas and St. Croix and heard from representatives for the Authority and the Commission’s technical consultants; and WHEREAS, the Commission found that the RFM component of the LEAC rate (i.e., $0.023/kWh) was adopted when the Commission concluded that it was cost effective and would result in annual benefits to consumers in excess of thirty-five million dollars ($35,000,000.00), and therefore found it was reasonable and prudent, to impose an additional component to the LEAC rate: 1. Ifan expenditure of additional funds would result in greater fuel savings from improved efficiency than the cost of the program; and 2. That the emergency generator was a key element of the short-term program to ensure that power was stabilized on St. Thomas and St. John, and that sufficient capacity was available to perform the necessary maintenance on other units; and