Tutu Well Site, St. Thomas, U.S. Virgin Islands, Monthly Progress Report #36, January 1995
\7 de maximis TUTU WELL SITE. ST. THOMAS. U.S.VIRGIN ISLANDS MONTHL Y PROGRESS REPORT #36 JANUARY 1995 WORK COMPLETED DURING PREVIOUS MONTH • Addressed USEPA December 28, 1994 comments on the draft Rl Report and Development and Screening of Remedial Alternatives report. In accordance with the schedule, submitted to USEPA and COM on January 31, 1995 the draft Final Rl Report. At USEPA's request, distribution of the draft was limited to only USEPA and COM. Made preparations for the coordination meeting with TEIC, EPA, DPNR, WAPA, and DPW concerning Feasibility Study (FS) alternates. • Continued preparation of the Draft FS document. WORK TO BE COMPLETED DURING NEXT MONTH Upon direction from the USEPA RPM, full distribution of the Final Rl Report in accordance with the Order will be made. Assist EPA in meetings with DPNR, WAPA, and DPW on February 6 and 7 to discuss project issues, coordination needs and Feasibility Study alternatives. • Attend meeting with USEPA in Region II New York office on February 1, 1995. TUT OO6 O467 FILE: 308».0*Pfl-36 MI-BX *64601* 64601
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://semspub.epa.gov/src/document/02/64601
SHA-256 01cb8c08756a4a422b55d28437fb8bce8aa0f62d762f1eaba54f4c6f2d9a60a3
Re-using this document
CERCLA administrative record
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-01cb8c08756a
Document text
\7 de maximis TUTU WELL SITE. ST. THOMAS. U.S.VIRGIN ISLANDS MONTHL Y PROGRESS REPORT #36 JANUARY 1995 WORK COMPLETED DURING PREVIOUS MONTH • Addressed USEPA December 28, 1994 comments on the draft Rl Report and Development and Screening of Remedial Alternatives report. In accordance with the schedule, submitted to USEPA and COM on January 31, 1995 the draft Final Rl Report. At USEPA's request, distribution of the draft was limited to only USEPA and COM. Made preparations for the coordination meeting with TEIC, EPA, DPNR, WAPA, and DPW concerning Feasibility Study (FS) alternates. • Continued preparation of the Draft FS document. WORK TO BE COMPLETED DURING NEXT MONTH Upon direction from the USEPA RPM, full distribution of the Final Rl Report in accordance with the Order will be made. Assist EPA in meetings with DPNR, WAPA, and DPW on February 6 and 7 to discuss project issues, coordination needs and Feasibility Study alternatives. • Attend meeting with USEPA in Region II New York office on February 1, 1995. TUT OO6 O467 FILE: 308».0*Pfl-36 MI-BX *64601* 64601