GOVERNOR JUAN F. LUIS HOSPITAL AND MEDICAL CENTER (GJFL) ST. CROIX, UNITED STATES VIRGIN ISLANDS PHASE 1 (T.O.R. – TEMPORARY OPERATING ROOMS) AND PHASE 2 (DIALYSIS) IFB025JFLHC18(C) CLARIFICATIONS TO BIDDERS MARCH 28, 2018 Prospective Bidders are hereby advised of the following changes to the Contract Documents for the above-mentioned project. I. THE FOLLOWING DRAWINGS ARE HEREIN ATTACHED: 1. New Drawings: Drawing No. Revision Date Title C2-10 A 03/28/18 Site Plan Phase 1 (T.O.R.) C2-20 C7-12 P.1 P.2 E0-01 E0-02 A A A A A A 03/28/18 03/28/18 03/28/18 03/28/18 03/28/18 03/28/18 Coordinates Tables Typical Sections and Details Piping Layout Drawings Piping Layout Drawings Partial Electrical Site Plan Phase 1 (T.O.R.) Partial Electrical Site Plan Phase 2 (Dialysis) 2. Revised Drawings: Drawing No. Revision T-01 B C1-10 B C2-13 B C4-80 B C4-90 B C6-10 B C7-10 C7-11 B B IFB025JFLHC18(C) II. THE FOLLOWING DOCUMENTS ARE HEREIN ATTACHED: 1. Revised Exhibit No. 1 – Bid Summary: a. Bid Summary (Issued for Bid – Rev. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2018/04/IFB025JFLHC18C-Clarifications-to-Bidders.pdf

SHA-256 0267ab1156cbd263f8001fe81d421bb35527d76808f5fc73040621097312d5d4

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-0267ab1156cb

Document text

GOVERNOR JUAN F. LUIS HOSPITAL AND MEDICAL CENTER (GJFL) ST. CROIX, UNITED STATES VIRGIN ISLANDS PHASE 1 (T.O.R. – TEMPORARY OPERATING ROOMS) AND PHASE 2 (DIALYSIS) IFB025JFLHC18(C) CLARIFICATIONS TO BIDDERS MARCH 28, 2018 Prospective Bidders are hereby advised of the following changes to the Contract Documents for the above-mentioned project. I. THE FOLLOWING DRAWINGS ARE HEREIN ATTACHED: 1. New Drawings: Drawing No. Revision Date Title C2-10 A 03/28/18 Site Plan Phase 1 (T.O.R.) C2-20 C7-12 P.1 P.2 E0-01 E0-02 A A A A A A 03/28/18 03/28/18 03/28/18 03/28/18 03/28/18 03/28/18 Coordinates Tables Typical Sections and Details Piping Layout Drawings Piping Layout Drawings Partial Electrical Site Plan Phase 1 (T.O.R.) Partial Electrical Site Plan Phase 2 (Dialysis) 2. Revised Drawings: Drawing No. Revision T-01 B C1-10 B C2-13 B C4-80 B C4-90 B C6-10 B C7-10 C7-11 B B IFB025JFLHC18(C) II. THE FOLLOWING DOCUMENTS ARE HEREIN ATTACHED: 1. Revised Exhibit No. 1 – Bid Summary: a. Bid Summary (Issued for Bid – Rev. A – March 23, 2018): Delete this document in its entirety and insert revised Bid Summary (Addendum No. 1 – Rev. B – March 28, 2018). 2. Document 00 01 10 – Table of Contents (Issued for Bid – Rev. A – March 21, 2018): Delete this document in its entirety and insert a revised Document 00 01 10 – Table of Contents (Addendum No. 1 – Rev. B – March 28, 2018). 3. Revised Technical Specification: a. Section 22 11 13 – Facility Water Distribution Piping (Issued for Bid – Rev. A – March 21, 2018): Delete this section in its entirety and insert revised Section 22 11 13 – Facility Water Distribution Piping (Addendum No. 1 – Rev. B – March 28, 2018). III. CLARIFICATIONS TO BIDDERS (ATTACHED): 1. Sketch No. E-4 is attached clarifying Detail 1 in Drawing No. E8-01. 2. Door Hardware Schedule. IV. QUESTIONS AND ANSWERS: 1. Question: Does the Bond need to be jury? Response: For bonding requirements refer to the Construction Contract (paragraph 4 – Compliance with Bonding Requirements), Invitation for Bids (paragraph – General Requirements; Bonding Requirements) and Instructions to Bidders (Paragraph 4). 2. Question: At TOR: Does Phase 1A includes the medical gases piping? Response: Yes. TOR, Phase 1A scope of work includes cold water, vacuum, oxygen air and medical air piping, including testing. Prospective Bidders are hereby advised of the following changes to the Contract Documents for the above-mentioned project. IFB025JFLHC18(C) PHASE 1 (T.O.R. – TEMPORARY OPERATING ROOMS) AND PHASE 2 (DIALYSIS) IFB025JFLHC18(C) CLARIFICATIONS TO BIDDERS I. CLARIFICATIONS TO BIDDERS - DRAWINGS 1. In Drawing No. C1-10 – Demolition Plan - Phase 1 (T.O.R.), existing lighting poles removal shall be as per Figure No. 1, attached. 2. In Drawing No. C2-10 – Site Plan - Phase 1 (T.O.R.), existing lighting poles removal shall be as per Figure No. 2, attached. Figure No. 1 By Others By Contractor (included in Scope of Work) IFB025JFLHC18(C) Figure No. 2 Note: This Addendum forms part of the Contract Documents and must be included by Prospective Bidders in their proposals. END OF CLARIFICATIONS TO BIDDERS Note: These documents forms are part of the Contract Documents and must be included by Prospective Bidders in their proposals. By Contractor (included in Scope of Work)