Memorandun regarding attached Tutu Wells Site - CERCLA Technical Systems Audit

Collection
Federal Reference
Sub-shelf
EPA SEMS (Superfund, Region 2)
Kind
Government Report
Island
St. Thomas
Date
1989-07
Topics
Audits Oversight
Pages
5
Text
Native Text

: • ' * . , UNITED STATES ENVIRONMENTAL PROTECTION AGENCY '*'/ REGION II DATE: DtG09l992 r^"***Q JECT* TuTu Wells Site - CERCLA Technical Systems Audit FROM: Laura Scalise, Project Quality Assurance Officer £rt-^-^-^-^^v Monitoring Management Branch TO: Caroline Kwan, Project Manager New York/Caribbean Superfund Branch II Attached please find the TuTu Wells Site audit report for the CERCLA limited technical systems audit performed on September 28 & 29, 1992. Please respond to this audit report within 30 days of your receipt for the action items noted. If you have any questions, please call me at (908) 906-6171. Attachment REGION II FORM 132O-1 (9/86) TUT OO& 1689 *64855* 64855 CERCLA Limited Technical Systems Audit TuTu Wells Site Remedial Investigation TuTu, St. Thomas, U.S. Virgin Islands September 28 & 29, 1992 Performed by: Laura Scalise, Environmental Scientist Monitoring Management Branch Suzanne Tramontana, Environmental Engineer Monitoring Management Branch Affiliation: U. S. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://semspub.epa.gov/src/document/02/64855

SHA-256 0675be1798cff2d22cce5bd023817ae2da118aba180c7e397780037f9eab605f

Re-using this document

CERCLA administrative record

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-0675be1798cf

Document text

: • ' * . , UNITED STATES ENVIRONMENTAL PROTECTION AGENCY '*'/ REGION II DATE: DtG09l992 r^"***Q JECT* TuTu Wells Site - CERCLA Technical Systems Audit FROM: Laura Scalise, Project Quality Assurance Officer £rt-^-^-^-^^v Monitoring Management Branch TO: Caroline Kwan, Project Manager New York/Caribbean Superfund Branch II Attached please find the TuTu Wells Site audit report for the CERCLA limited technical systems audit performed on September 28 & 29, 1992. Please respond to this audit report within 30 days of your receipt for the action items noted. If you have any questions, please call me at (908) 906-6171. Attachment REGION II FORM 132O-1 (9/86) TUT OO& 1689 *64855* 64855 CERCLA Limited Technical Systems Audit TuTu Wells Site Remedial Investigation TuTu, St. Thomas, U.S. Virgin Islands September 28 & 29, 1992 Performed by: Laura Scalise, Environmental Scientist Monitoring Management Branch Suzanne Tramontana, Environmental Engineer Monitoring Management Branch Affiliation: U. S. Environmental Protection Agency Environmental Services Division Monitoring Management Branch Edison, New Jersey 08837 TUT OO6 169O -1- Pronect Audited; TuTu Wells Site, Remedial Investigation Soil & Groundwater Investigation TuTu, St. Thomas, U.S. Virgin Islands Date of Audit: September 28 & 29, 9112 Entity Audited: Geraghty & Miller, Inc. Rochelle Park, NJ Soil Tech Corp. Rio Piedras, Puerto Rico (G&M's subcontractor) CDM-FPC New York, NY (EPA oversight contractor) Personnel On-Site; Clinton Moffatt Ruben Ponciano Alberto Barrera Guillermo Gonzales (Papo) Steve Alicea Angel Ferrer Fernando Zavala (Pichy) Susan Collagan G&M NJ Office G&M PR Office Soil Tech Soil Tech Soil Tech Soil Tech Soil Tech CDM-FPC Field Operations Leader/ sampler Purge Team Leader Sampling Team Leader Purger/Electrician Purger Purger Sampler/sample custodian EPA oversight Also present: Ana Gloria Ramos Jose Agrelot TEIC - Esso, PR (TuTu Environmental Investigations Committee) Soil Tech President Personnel Qualifications: Personnel on-site appeared to be qualified to perform their assigned tasks. Purpose of Audit: The purpose of this limited technical systems audit is to observe field sampling activities and to evaluate the adequacy of quality control procedures carried out as compared to the approved field operations plan and Region II quality assurance policy. TUT OO6 1691 Findings: Monday, September 28, 1992: This day was supposed to be the first day of the audit. A meeting was held with all 12 people mentioned in this report being present. A plan of operation was confirmed regarding the order of which wells would be sampled first. Also discussed was the procedure for examination of each well for floating product prior to purging; the proper decontamination procedure for the submersible pump and centrifugal pump tubing; and the procedure for purging 3-5 well volumes and sampling until measurements agree within 10%. No sampling occurred on this day. Tuesday, September 29, 1992: The two field teams were organized as outlined above in the "personnel" section. Both teams performed their respective tasks competently and according to the approved project plan. COM did a good job with oversight, observing both teams and collecting split samples. There were very few deficiencies found by the auditors. The following assorted required paperwork was missing and needs to be submitted to the RPM, and then to the auditors: 1. Geraghty & Miller - needs to submit to the RPM the analytical data for their I-Chem and Eagle Pitcher sample bottles. Mr. Moffatt claimed these bottles to be I-Chem Series 300 bottles and Eagle Pitcher Level I bottles, which are consistent with the OSWER guidance, "Specifications and Guidance for Obtaining Contaminant-Free Sample Containers", dated July 1989. 2. Geraghty & Miller - Mr. Moffatt also claims that the deionized water obtained from their laboratory, Enseco East, had been analyzed prior to their use. This data demonstrating the deionized water to be analyte-free must also be submitted to the RPM. There were two minor infractions that had occurred in the field during sampling: 3. Geraghty & Miller - The Region II CERCLA Quality Assurance Manual states that wells must be sampled within 3 hours from the time of purging. One well was sampled very closely to the 3-hour limit. In many cases this wouldn't be a problem, except in a hot climate area it is more likely for the standing water to change in chemical composition during that time frame. Geraghty & Miller was advised by the auditors to sample as closely to the completion of purging as possible. In the case of the well stated above, it was a slow recovery well; however, it was not checked for recovery and might have been sampled sooner. TUT O06 1692 4. CDM-FPC - The CLP Users Guide and the Region II CERCLA Quality Assurance Manual state that not only the filled cooler, but also each sample bottle be sealed with a custody seal. COM did not have enough custody seals for each of their sample bottles; however, the coolers did have custody seals attached properly. The only response requested from the RPM is the submission of the missing data on Geraghty & Miller's bottles and deionized water used in the field. TUT OO6 1693