Sub-divider/developer submits to
Sub-divider/developer submits to CCZP Application for Preliminary Subdivision, one electronic copy or two printed copies of Engineering Plans, copy of DEP comments or CZM Permit, SHPO’s and DFW’s comments and other pertinent data. CCZP reviews Plat and Plans, and acts on the submission within 30 days. Sub-divider/developer obtains approval of Preliminary Plat and Engineering Plans from DPNR Commissioner (Approval is effective for a maximum of 12 months, with provision for 6-month extension). Informal Pre-application meeting Sub-divider/developer meets with CCZP to discuss feasibility of project. Submits proposed plat to CCZP. Sub-divider/developer submits proposed Plat to DPNR’s Divisions of SHPO & FW for their comments/clearance letters. Sub-divider/developer submits proposed Plat to DPNR’s Div. of Environmental Protection (DEP) for Tier 2 property, and DPNR’s Div. of Coastal Zone Management (CZM) for Tier 1 land. Sub-divider/developer obtains Tier 1-CZM Permit. Sub-divider/developer obtains written disapproval stating reasons, corrects Plat/Plans and resubmits to CCZP. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpnr.vi.gov/wp-content/uploads/2024/01/flow-chart_subdivision.pdf
SHA-256 07a230f5730699c771210b78fb30eba8264d2c7758321f2e508bbfa0a1d44f13
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-07a230f57306
Document text
Sub-divider/developer submits to CCZP Application for Preliminary Subdivision, one electronic copy or two printed copies of Engineering Plans, copy of DEP comments or CZM Permit, SHPO’s and DFW’s comments and other pertinent data. CCZP reviews Plat and Plans, and acts on the submission within 30 days. Sub-divider/developer obtains approval of Preliminary Plat and Engineering Plans from DPNR Commissioner (Approval is effective for a maximum of 12 months, with provision for 6-month extension). Informal Pre-application meeting Sub-divider/developer meets with CCZP to discuss feasibility of project. Submits proposed plat to CCZP. Sub-divider/developer submits proposed Plat to DPNR’s Divisions of SHPO & FW for their comments/clearance letters. Sub-divider/developer submits proposed Plat to DPNR’s Div. of Environmental Protection (DEP) for Tier 2 property, and DPNR’s Div. of Coastal Zone Management (CZM) for Tier 1 land. Sub-divider/developer obtains Tier 1-CZM Permit. Sub-divider/developer obtains written disapproval stating reasons, corrects Plat/Plans and resubmits to CCZP. Sub-divider/developer obtains DPW’s Engineering Division approval for road design, easements, drainage/culvert design systems. Sub-divider/developer obtains DEP’s Storm-Water Management and/or Earth Change approval(s). Sub-divider/developer consults with Waste Management Authority (when applicable), WAPA and VIYA regarding the installation of required infrastructure. Sub-divider/developer submits application for Final Plat to CCZP. Sub-divider/developer obtains written Approval of Final Plat within 30 days Sub-divider/developer submits approved Final Plat to Lt. Governor’s Cadastral Office for recording. PROCEDURE FOR ALL SUBDIVISION DEVELOPMENT PROPOSALS Sub-divider/developer develops site per the specification of all approvals, and installs all requisite infrastructure, e.g. road, potable water/sewer, telephone, cable, and light. Revised 12/2023