Weekly Meeting Report - 10, Tutu Site Investigation, St. Thomas, U.S. Virgin Islands

Collection
Federal Reference
Sub-shelf
EPA SEMS (Superfund, Region 2)
Kind
Government Report
Island
St. Thomas
Date
1992-09-27
Pages
1
Text
Native Text

SOIL TECH JSOI WEEKLY MEETING REPORT - 10 TUTU SITE INVESTIGATION ST. THOMAS, US VIRGIN ISLANDS PERIOD COVERED ATTENDING PREPARED BY DATE PREPARED September 13 to September 27, 1992 Ana Gloria Ramos, Designated Coordinator Clinton Moffatt, G&M Jose" C. Agrelot, Soil Tech Jose C. Agrelot, Soil Tech Project Coordinator October 13, 1992 FIELD WORK COMPLETED FROM SEPTEMBER 13 TO SEPTEMBER 27. 1992 o Drilling of MVV-9S was completed. o Drums containing soil cuttings were all relocated at the Kessler site. o Monitoring well development was completed by September 16, 1992. o Coordination of the initial sampling round continued. PROPOSED SCHEDULE FOR SEPTEMBER 27 TO OCTOBER 11. 1992 o Sampling of monitoring wells will be conducted. JCA/lvl/42614.wpf\921240 TUT OO6 0209 *64574* 64574

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://semspub.epa.gov/src/document/02/64574

SHA-256 08b9dd5bddc866ac364e259d1315c4ccad8736b573015b85a42c298ffa95f493

Re-using this document

CERCLA administrative record

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-08b9dd5bddc8

Document text

SOIL TECH JSOI WEEKLY MEETING REPORT - 10 TUTU SITE INVESTIGATION ST. THOMAS, US VIRGIN ISLANDS PERIOD COVERED ATTENDING PREPARED BY DATE PREPARED September 13 to September 27, 1992 Ana Gloria Ramos, Designated Coordinator Clinton Moffatt, G&M Jose" C. Agrelot, Soil Tech Jose C. Agrelot, Soil Tech Project Coordinator October 13, 1992 FIELD WORK COMPLETED FROM SEPTEMBER 13 TO SEPTEMBER 27. 1992 o Drilling of MVV-9S was completed. o Drums containing soil cuttings were all relocated at the Kessler site. o Monitoring well development was completed by September 16, 1992. o Coordination of the initial sampling round continued. PROPOSED SCHEDULE FOR SEPTEMBER 27 TO OCTOBER 11. 1992 o Sampling of monitoring wells will be conducted. JCA/lvl/42614.wpf\921240 TUT OO6 0209 *64574* 64574