Paul E. Joseph Stadium Hearing
## Slide 1 Paul E. Joseph Stadium Hearing Prepared by Senator Bolques – CYASP Committee | July 18, 2025 ## Slide 2 Paul E. Joseph Stadium Project Timeline Note: Between 2015 and 2024, over 10 Change Orders added 1,662 days (4.5 years) to the project. Liquidated damages were not enforced, and over $750,000 was paid beyond physical progress. Multiple contracts were issued before prior scopes were completed, revealing critical failures in oversight and accountability. ## Slide 3 Payment Disbursement by Year ## Slide 4 Summary Combined expenditure: $345,700 Both areas remain non-functional and materially incomplete Reported progress significantly overstates actual site readiness Findings suggest potential oversight or misreporting of construction status ## Slide 5 Summary Total reported expenditure: $855,100 No operational electrical infrastructure observed Basic installation steps incomplete across all inspected areas Reported 78% completion is not supported by on-site conditions ## Slide 6 Summary Reported value: $195,000 No elevator equipment or components present on site No structura …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
SHA-256 1136905f77173e65432789f89c113cf5570bd37d6556c90d03ee5d323d83e01c
Re-using this document
A proceeding of the Legislature of the Virgin Islands, open to the public under 3 V.I.C. § 881, which reaches any committee of any branch of government and permits the news media to publish what it records.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-1136905f7717
Document text
## Slide 1 Paul E. Joseph Stadium Hearing Prepared by Senator Bolques – CYASP Committee | July 18, 2025 ## Slide 2 Paul E. Joseph Stadium Project Timeline Note: Between 2015 and 2024, over 10 Change Orders added 1,662 days (4.5 years) to the project. Liquidated damages were not enforced, and over $750,000 was paid beyond physical progress. Multiple contracts were issued before prior scopes were completed, revealing critical failures in oversight and accountability. ## Slide 3 Payment Disbursement by Year ## Slide 4 Summary Combined expenditure: $345,700 Both areas remain non-functional and materially incomplete Reported progress significantly overstates actual site readiness Findings suggest potential oversight or misreporting of construction status ## Slide 5 Summary Total reported expenditure: $855,100 No operational electrical infrastructure observed Basic installation steps incomplete across all inspected areas Reported 78% completion is not supported by on-site conditions ## Slide 6 Summary Reported value: $195,000 No elevator equipment or components present on site No structural, mechanical, or electrical systems installed Elevator shaft appears incomplete and sealed Reported 92.3% completion not supported by observed conditions ## Slide 8 What $32.3 Million Bought Us in 11 Years Total Allocated: $32.3M2020 Re-appropriation: $8.2M2024 Supplemental: $4.1MReported Completion: 60.2%Elevator Completion Claim: 92.3% Photo taken July 2, 2025 ## Slide 9 What $32 Million Should Look Like Installed elevator with operational cab (as claimed to be 92% complete) Fully constructed and roofed bleacher sections with seating Restrooms with plumbing, fixtures, and lighting Turf-ready field with drainage and base preparation Operational Carnival Village venue with solar power, lighting, and finishes ## Slide 10 Public Funds Deserve Public Accountability It’s time for answers, documentation, and a renewed commitment to the people of the Virgin Islands. Eleven years ago, the people of St. Croix were promised more than a stadium. We were promised a symbol of hope. A place to uplift our youth, honor our elders, and ignite pride across our island. What we have instead is a half-finished shell. A monument to broken promises, mismanagement, and political neglect. $32.3 million later, and despite over 20 change orders, this project is still not complete. These change orders added more than 1,662 days, that’s 4.5 years of delay, and over $8 million in additional costs, including a $5.1 million supplemental contract in 2024. And while the people waited, no liquidated damages were enforced, and over $750,000 was paid beyond the physical progress. Today, 78% of the funds have been spent, yet key components like elevators, restrooms, and site prep remain unfinished.