Snmeeneet 5 GOVERNMENT OF THE UNITED STATES VIRGIN ISLANDS PUBLIC SERVICES COMMISSION In Re: The Minimum Filing Requirements for the PSC Docket No. 614 Water and Power Electric and Water Levelized Order No. 39/2015 Energy Adjustment Clause ORDER WHEREAS, the Virgin Islands Public Services Commission’s (hereinafter “PSC” or “Commission”) Order No. 27/2013 dated February 26, 2013, established Docket 614 to create rules and regulations for the minimum filing requirements (hereinafter “MFR”) for future Electric and Water Levelized Energy Adjustment Clause filings; and WHEREAS, on March 24, 2015, the Commission received a Report and Recommendations from its Hearing Examiner, Kye Walker, Esq.; and WHEREAS, on March 24, 2015, Georgetown Consulting Group (“GCG”) filed its Report and Recommendations with the Commission; and WHEREAS, on March 26, 2015, the Commission received a Revised Exhibit A Proposed Minimum Filing Requirements For Electric And Water LEAC from its Hearing Examiner, Kye Walker, Esq.; and WHEREAS, on March 26, 2015, the Commission held a regular meeting in both its offices o …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://psc.vi.gov/wp-content/uploads/2024/06/PSC-Order-No.-39-2015-Docket-614-WAPAs-MFR-HEs-Rpt-ACCEPTED-Copy.pdf
SHA-256 18a58532e22c816d356839ccafff7738015751a6b3b4cf16c2fefa81fbc3d93b
Re-using this document
territorial public record
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-18a58532e22c
Document text
Snmeeneet 5 GOVERNMENT OF THE UNITED STATES VIRGIN ISLANDS PUBLIC SERVICES COMMISSION In Re: The Minimum Filing Requirements for the PSC Docket No. 614 Water and Power Electric and Water Levelized Order No. 39/2015 Energy Adjustment Clause ORDER WHEREAS, the Virgin Islands Public Services Commission’s (hereinafter “PSC” or “Commission”) Order No. 27/2013 dated February 26, 2013, established Docket 614 to create rules and regulations for the minimum filing requirements (hereinafter “MFR”) for future Electric and Water Levelized Energy Adjustment Clause filings; and WHEREAS, on March 24, 2015, the Commission received a Report and Recommendations from its Hearing Examiner, Kye Walker, Esq.; and WHEREAS, on March 24, 2015, Georgetown Consulting Group (“GCG”) filed its Report and Recommendations with the Commission; and WHEREAS, on March 26, 2015, the Commission received a Revised Exhibit A Proposed Minimum Filing Requirements For Electric And Water LEAC from its Hearing Examiner, Kye Walker, Esq.; and WHEREAS, on March 26, 2015, the Commission held a regular meeting in both its offices on St. Thomas and St. Croix, United States Virgin Islands; and WHEREAS, upon review and deliberation the Commission voted to ACCEPT the Report and Recommendations of the Hearing Examiner, Kye Walker, Esq.; and NOW THEREFORE, the Commission ORDERS: 1. That the Report and Recommendations of the Hearing Examiner, Kye Walker, Esq. be ACCEPTED as presented; and that 2. The Revised Exhibit A is hereby ADOPTED. So Ordered. Docket 614 Proposed LEAC Filing Requirements Page |2 1.6 1.7 1.8 1.9 1.10 1.11 1.12 Statement of fuel supply and fuel diversity with a description of any changes in the Authority's hedging program, inclusive of the number of hedges, size of hedges, price of the hedge and expiration date of hedges; Statement regarding the status of alternative energy supply and level of compliance with any legislative mandates; Status of implementation of the management audit, recommendations and action plan; Statement and status of the current results of the Integrated Resource Plan (IRP) of the Authority as it impacts new or replacement electric generation; Statement of the degree to which the Authority's planned generation resource additions and retirements are consistent with or differ from the most recently approved IRP; Statement and status of equipment purchased or leased and plans for modification of the equipment and implementation of the equipment into the systems and the impact of such implementation; and Statement of challenges to provision of efficient and cost effective generation and identification of solutions or needed assistance from the Commission. 2. Content of the Petition —the Petition shall contain, at minimum, the following information: 2.1 The Authority must provide for the system of the Authority, which is the subject of the Petition, information that defines the overall performance of the utility for historical, current and projected periods for the projected rate change and the resulting impact on LEAC rates to include, if applicable to the system: projected and annual fuel cost incurred, available generating capacity, system load factor, unaccounted for energy, station service, equivalent availability for peaking and combined cycle operations, and projected and actual plant and unit efficiency. The historical information for the Electric System consists of actual data from the same six month time period of the proposed rate change from the previous year. The historical information for the Water System consists of actual data for the same twelve month time period for the prior year. The performance information shall be supported by the Authority’s dashboard. The Authority's dashboard is a visual display of the overall monthly performance of the Authority in the context of a 24 month historical period and a 12 month forecasted period and displays the following key performance metrics: available capacity by unit and peak demand, generation by resource type, plant average heat rate, heat rate by resource type, station service, net energy delivered to grid, planned maintenance, availability by resource type and plant average availability, energy not served, average fuel cost, market price and fuel inventory. The information shall be presented in excel and graphical format or other electronic format acceptable to the Commission. The performance projection represented in the 12 month forecasted period shall include Docket 614 Proposed LEAC Filing Requirements Page |3 2.2 available capacity by unit, generation by resource type, heat rates, load and resource balance, fuel costs and planned maintenance. The Authority shall clearly identify any challenges during the historical and current periods and any anticipated challenges for the projected period. The Authority shall describe the challenges in details and discuss any identified root causes of the challenges and measures taken to address the challenges. Exhibits to Electric LEAC Petition The following exhibits are to be submitted to the Commission in an electronic format acceptable to the Commission. 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 Table A-1: LEAC rate computation This table provides a comparison of all the factors that comprise the LEAC rate to include: kWh sales, fuel cost, energy production, fuel purchased and consumed, regulatory costs, and any other applicable LEAC component. It also displays the impact the proposed LEAC rate will have on the typical monthly bill. The data is shown for the historical period, the current as approved period and the proposed period to be covered by the rate change. Table A-2: Differential Analysis This table provides a comparative analysis of the impact of the items causing the requested change in the LEAC rate. The basis uses the current approved rates compared to the proposed rates. Table A-3: Current Fuel Cost Portion of the LEAC rate This table breaks down the current fuel costs portion of the LEAC rate. It details the fuel cost based on energy requirements, sales, heat rates, and fuel consumed. There are two sub-parts that break down the fuel cost by island. Table A-4: Deferred Fuel Amortization and Balances This table presents the deferred fuel balance and the period for which any deferred fuel is amortized. It also shows the change in the balance from the previous period to the current period. The opening balance of the deferred fuel expense for the projected period should be the same as the closing balance in the historic period. Tables A-5 through A-7: Input Related Tables and Data These tables are used to input the projected fuel price, monthly statistical information, and statistical information. The Authority shall provide the following data: Docket 614 Proposed LEAC Filing Requirements Page |4 2.2.5.1 the latest sales forecasts used to support the projections, including work papers and subsidiary schedules showing the assumptions used. Monthly financial reports shall serve as the basis for the actual figures including the use of historic data to estimate the losses and plant use including the twelve (12) month average for losses, with an explanation of how this data supports the estimates 2.2.5.2 the most recent consultant report showing the calculations based upon the fuel pricing index included in the Authority's contracts. Hedging cost data shall include a summary of hedge contracts (financial or physical), expiration dates, hedging pricing levels, percent hedged, exposure to market pricing, net gains or losses and financial support, if any, required 2.2.5.3 heat rates, fuel consumption and costs resulting from the economic dispatch information for St. Thomas and St. Croix shall be included as part of the LEAC rate filing 2.2.5.4 aback cast economic dispatch analysis for the systems approximating the real-time optimized dispatch of energy production resources based on actual operating conditions existing during the back cast period and comparing these results to the actual results that occurred during the preceding LEAC period 2.2.5.5 annual Electric System LEAC audits with explanation and reconciliation of the figures provided in the financial reports 2.2.5.6 — the Authority will provide current maintenance information to the Commission in the same form it is provided to the Authority's management 2.3 Exhibits to Water LEAC Petition 2.3.1 2.3.2 2.3.3 2.3.4 Table B-1: Differential Analysis This table compares the proposed Water LEAC rate components with the current as approved Water LEAC rate components. Table B-2: Comparative Analysis Over 12 Months This table compares the Water LEAC rate components on an annual basis. Table B-3: Monthly Bill Comparison This table compares the effect the change in the rate will have on the typical monthly bill. Table B-4: Water Sales and Production Costs This table reflects an annual comparison of the water sales and purchase and production costs for the projected year in comparison to the prior year. Docket 614 Proposed LEAC Filing Requirements Page |5 2.3.5 2.3.6 2.3.7 2.3.8 2.3.9 Table B-5: Water LEAC True Up This table shows the deferred fuel/surplus balance and the period for which it is amortized. It also shows the change from the previous period to the current period. Tables B-6 and B-7: Inout Pages on Historical Water Sales and Purchase and Production Costs This table identifies and quantifies the costs of purchased water and any contracts for which recovery of costs is sought. Tables B-8 and B-9: Approved Water Sales and Costs This table reflects the water sales and cosis that were approved in the most recent Water LEAC proceeding Tables B-10 and B-11: Projected Water Sales and Cost This table reflects the projected water sales and costs for the proposed period of the rate change. Annual Water System LEAC audits filed in the form of a workbook with explanation and reconciliation of the audit workbook to the figures provided in the financial reports for both departments. 3. Timeline for Consideration of LEAC Petition No later than ten (10) days from filing of the Petition, the Commission staff will confirm whether the filing is complete. If the filing is incomplete, the Commission staff will inform the Authority of the missing information within ten (10) days of filing and the Authority must provide the missing information within five (5) days of being notified that the Petition is incomplete. The Authority and the Commission staff to participate in a pre-discovery conference within twenty (20) days of the filing of the Petition. The discovery conference will trigger a thirty (30) day discovery period to be conducted as follows: 3.4.1.1. Commission staff to submit discovery requests to Authority 3.1 3.2 3.3 3.4 within ten (10) days of the discovery conference. 3.4.1.2 The Authority to respond to discovery requests within ten (10) days of receipt of discovery. 3.4.1.3 The Authority to submit objections to any discovery requests within five (5) days of receipt of discovery request. 3.4.1.4 The parties to meet and confer regarding any objections within five (days) of the receipt of the objections. Docket 614 Proposed LEAC Filing Requirements Page [6 s 3.4.1.5 The parties to meet and confer regarding any incomplete discovery responses within five (5) days of the incomplete discovery response. 3.4.1.6 lf the Authority and the Commission staff cannot resolve the 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 discovery dispute, then the Authority and the Commission staff will make a joint submission of the dispute to the Hearing Examiner for resolution within two days of reaching an impasse. The Commission shall empower the Hearing Examiner to compel or limit, as the case may be, the production of information in accordance with the scope of discovery. The scope of discovery shall include questions seeking clarification of information contained in the Petition, the Cover Letter, the exhibits submitted in support of the Petition and any other information directly related to the short term cost of fuel or energy that is to be charged to customers through the LEAC. The Authority and Commission staff may conduct informal discussions to address any issues or concerns raised in the Petition in an effort to streamline the discovery process and to further the resolution of the Petition. The Commission staff shall submit its report to the Authority within sixty-five (65) days of the filing of the Petition. No further evidence shall be submitted after the Commission staff submits its report, unless allowed by the Commission or the Hearing Examiner for exceptional circumstances. The Authority shall submit a response to the report within ten (10) days of receipt of the report. The Commission to meet and consider the Petition within ninety (90) days of the filing of the Petition, provided that a hearing on the Petition shail not be held sooner than five (5) days from receipt of the Authority's response.