PROPOSED PLAN PUBLIC MEETING PRESENTATION FOR 07/14/2021 FOR OU2 FOR THE TUTU WELLFIELD SITE
Tutu Wellfield Superfund Site Proposed Cleanup Plan for Groundwater Remediation at the Curriculum Center Pre-Recorded Presentation July 14, 2021 *629926* 629926 Donette Samuel, Community Involvement Coordinator Meeting Presenters EPA PROPOSED PLAN FOR TUTU WELLFIELD | 2 Caroline Kwan, Remedial Project Manager Conclusions of the Focused Source Remedial Investigation, Risk Assessment and Feasibility Study Revisions to the 2018 Proposed Plan with updated cost- benefit analysis Proposed Plan for the cleanup of the contaminant source areas of the Tutu Wellfield site Public is encouraged to provide comments until August 13th, 2021 Presentation Objectives EPA PROPOSED PLAN FOR TUTU WELLFIELD | 3 Meeting Agenda Superfund Overview Site Background Remedial Investigation Risk Assessment Feasibility Study Preferred Remedy Questions/Comments? …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://semspub.epa.gov/src/document/02/629926
SHA-256 1d19c6071b7c96376dda4e0976d92fdb86a3a553e8d963548b525d26d96076fc
Re-using this document
CERCLA administrative record
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-1d19c6071b7c
Document text
Tutu Wellfield Superfund Site Proposed Cleanup Plan for Groundwater Remediation at the Curriculum Center Pre-Recorded Presentation July 14, 2021 *629926* 629926 Donette Samuel, Community Involvement Coordinator Meeting Presenters EPA PROPOSED PLAN FOR TUTU WELLFIELD | 2 Caroline Kwan, Remedial Project Manager Conclusions of the Focused Source Remedial Investigation, Risk Assessment and Feasibility Study Revisions to the 2018 Proposed Plan with updated cost- benefit analysis Proposed Plan for the cleanup of the contaminant source areas of the Tutu Wellfield site Public is encouraged to provide comments until August 13th, 2021 Presentation Objectives EPA PROPOSED PLAN FOR TUTU WELLFIELD | 3 Meeting Agenda Superfund Overview Site Background Remedial Investigation Risk Assessment Feasibility Study Preferred Remedy Questions/Comments? EPA PROPOSED PLAN FOR TUTU WELLFIELD | 4 Toxic waste disposal disasters prompted law passage by Congress in 1980 Provides Federal funds for cleanup of hazardous waste sites Allows EPA to respond to emergencies involving hazardous substances Empowers EPA to compel Potentially Responsible Parties to pay for or conduct site clean up Superfund Law EPA PROPOSED PLAN FOR TUTU WELLFIELD | 5 Superfund Cleanup Process WE ARE HERE EPA PROPOSED PLAN FOR TUTU WELLFIELD | 6 Meeting Agenda Superfund Overview Site Background Remedial Investigation Risk Assessment Feasibility Study Preferred Remedy Questions/Comments? EPA PROPOSED PLAN FOR TUTU WELLFIELD | 7 Location of Tutu Wellfield Superfund Site EPA PROPOSED PLAN FOR TUTU WELLFIELD | 8 1969: Curriculum Center property owned by LAGA Industries Ltd. (LAGA), a textile manufacturing facility 1970 – 1978: Purchased by Duplan Corporation. Begun dry cleaning operations using Tetra-chloroethene (PCE) Site History 1979 – 1981: Purchased by Panex, sold to Virgin Islands Department of Education (VIDE) 1982 – 2017: Multi-use building by VIDE EPA PROPOSED PLAN FOR TUTU WELLFIELD | 9 1982 – 1989: Multiple investigations by EPA and Potentially Responsible Parties (PRPs) 1994 – 1995: Remedial Investigation (RI) identified co- mingled plumes with chlorinated volatile organic compounds (CVOCs) and petroleum/gasoline components Site History 1995: Site listed on the National Priorities List (NPL). Studies concluded that the CVOC plume with dichloro- ethene (DCE), tetrachloroethene (PCE), trichloroethene (TCE), and vinyl chloride (VC) originated at or near the Curriculum Center EPA PROPOSED PLAN FOR TUTU WELLFIELD | 10 1996: Record of Decision (ROD) for sitewide remediation selected groundwater extraction and treatment to restore groundwater 2004-2013: Construction of the remedy completed and included two groundwater treatment systems to treat the CVOC plume. Groundwater treatment facilities operated by EPA; transferred to USVI in 2013 Site History April 2015: EPA’s Operable Unit 2 (OU2) investigates potential additional contaminant source areas EPA PROPOSED PLAN FOR TUTU WELLFIELD | 11 Status of Sitewide Remediation Current Remedy: Groundwater extraction, ex-situ treatment, discharge to Turpentine Run, and institutional controls Groundwater treatment systems installed at the Curriculum Center property and near O’Henry Dry Cleaners SVE system installed at the Curriculum Center and operated from 2004 to 2006; vapor contamination was reduced significantly Insufficient reduction of groundwater contamination at the Curriculum Center area EPA PROPOSED PLAN FOR TUTU WELLFIELD | 12 Meeting Agenda Superfund Overview Site Background Source Area Remedial Investigation Risk Assessment Remedial Alternatives Preferred Remedy Questions/Comments? EPA PROPOSED PLAN FOR TUTU WELLFIELD | 13 Source Area - Curriculum Center Property EPA PROPOSED PLAN FOR TUTU WELLFIELD | 14 Source Area Remedial Investigation Activities conducted at the Curriculum Center property April 2016 to June 2017 Surface geophysical survey Rock matrix diffusion sampling and analysis Monitoring well installation Borehole geophysical investigation Packer testing and sampling Groundwater sampling Groundwater level monitoring Dense non-aqueous phase liquid (DNAPL) monitoring EPA PROPOSED PLAN FOR TUTU WELLFIELD | 15 Source Area Groundwater Sampling Results Characterized bedrock aquifer; defined two possible zones for contaminant migration DNAPL is present and will act as an ongoing source Dissolved phase CVOC contamination is present Contaminants present in the rock matrix will continue to leach out into groundwater The degree of natural degradation varies throughout the Curriculum Center area The capture zone of the existing extraction system does not extend far enough in a downgradient direction EPA PROPOSED PLAN FOR TUTU WELLFIELD | 16 Monitoring Well Exceedances Summary EPA PROPOSED PLAN FOR TUTU WELLFIELD | 17 Conceptual Site Model EPA PROPOSED PLAN FOR TUTU WELLFIELD | 18 Hurricane Irma and Maria Impacts The two sitewide groundwater (GW) treatment systems were damaged during hurricanes Irma and Maria and remained shut down due to electrical problems Repairs were completed in 2020 and the system were placed in operation in June 2021 Contamination continue to migrate downgradient To assess the impact of the treatment systems shutdown, supplemental GW sampling was performed in June and October 2019 and the findings are: Analytical results confirmed the extent of chlorinated compounds in GW. Concentrations in samples from Curriculum Center wells were generally lower than those established in the 2017 Remedial Investigation (RI). Concentrations detected in residential wells were generally below MCLs. One sample exceeded an MCL for TCE and that well is used for irrigation purposes only. Comparison of the 2017 & 2019 GW Sampling Data, is presented on the next figure: EPA PROPOSED PLAN FOR TUTU WELLFIELD | 19 EPA PROPOSED PLAN FOR TUTU WELLFIELD | 20 Meeting Agenda Superfund Process Overview Site Background Remedial Investigation Risk Assessment Remedial Alternatives Preferred Remedy Questions/Comments EPA PROPOSED PLAN FOR TUTU WELLFIELD | 21 Source Area Risk Assessment Process Step 1 • Hazard Identification Step 2 • Exposure Assessment Step 3 • Toxicity Assessment Step 4 • Risk Characterization Drinking Water Use Pathway Source: Thinkstock Photos EPA PROPOSED PLAN FOR TUTU WELLFIELD | 22 Source Area Risk Assessment Summary Contaminated groundwater presents an unacceptable exposure risk VC, TCE, PCE and cis-1,2-DCE pose a lifetime cancer risk exceeding 1x10-4 Vapor intrusion from PCE and TCE are also of potential concern to workers Future use of the building is currently unknown EPA PROPOSED PLAN FOR TUTU WELLFIELD | 23 Meeting Agenda Superfund Process Overview Site Background Remedial Investigation Feasibility Study Preferred Remedy Questions/Comments? EPA PROPOSED PLAN FOR TUTU WELLFIELD | 24 Remedial Alternatives – Cleanup Options Alternative 1 – No Action Alternative 2 – Expand Existing Pump and Treatment System Alternative 3 – In Situ Thermal Treatment and Pump and Treat Alternative 4 – In Situ Steam Injection and Pump and Treat EPA PROPOSED PLAN FOR TUTU WELLFIELD | 25 Alternative 1 – No Action • No Action to remediate the contaminated groundwater • No Institutional Controls Pros – Basis for comparison with other process options Cons – Contaminants in groundwater will continue to spread. Human health and environmental risks remain Costs- • Capital Cost: $0 • Operations and maintenance (O&M) Costs: $0 • Present-Worth Cost: $0 EPA PROPOSED PLAN FOR TUTU WELLFIELD | 26 August 2018 Alternative 2 – Expand Existing Pump and Treat System • Alternative 2A – Reinjection • Alternative 2B – Air Sparging/Soil Vapor Extraction (AS/SVE) • Alternative 2C – In Situ Chemical Oxidation (ISCO) • Alternative 2D – Surfactant Flushing Alternative 2 – Expand Existing Pump and Treat System • Expand existing system, add two new extraction wells downgradient • Upgrade current system capacity • Replace existing equipment • Alternate pumping from source area wells • Dual-phase extraction (DPE) / enhanced fluid recovery (EFR) from source area wells Pros - containment of plume; removal of DNAPL Cons - remedial timeframes are long Timeframe- • Estimated to be in excess of 30 years; • Pump and treat (P&T) and long term monitoring (LTM) costs estimated for 30 years. Costs- • Capital Cost: $4,802,538 • Operations and maintenance (O&M) Costs: $8,481,677 • Present-Worth Cost: $13,340,565 EPA PROPOSED PLAN FOR TUTU WELLFIELD | 28 Alternative 2A – Reinjection Enhancement of Alternative 2 with reinjection of treated water downgradient through two new injection wells Pros- better hydraulic control and maintaining water balance Cons - additional hydrogeological analysis needed; reinjection wells will need maintenance; long remedial timeframes Timeframe - • Estimated to be in excess of 30 years; • P&T and LTM costs estimated for 30 years. Costs- • Capital Cost: $437,053 • O&M Costs: $51,364 plus Alt 2 • Present-Worth Cost: $488,417 EPA PROPOSED PLAN FOR TUTU WELLFIELD | 29 Alternative 2B – AS/SVE Enhancement of Alternative 2 with air sparging and soil vapor extraction (AS/SVE) in source areas; add 25 SVE and 30 AS wells Pros- mobilize residual DNAPL within the zone influenced by air sparging; may increase the mass removal rate reducing the timeframe of the P&T system Cons- air flow may not be uniform, depends on how well the injected air permeates from injection point, connectivity of fractures and groundwater mounding Timeframe- • The AS/SVE system at source area for 5 years; • Based on calculations, downgradient area will reach drinking water standards in 25 years; • LTM costs estimated for 30 years Costs - • Capital Cost: $1,739,745 • O&M Costs: $205,461 plus Alt 2 • Present-Worth Cost: $1,945,206 EPA PROPOSED PLAN FOR TUTU WELLFIELD | 30 Alternative 2C – ISCO Enhancement of Alternative 2 with in situ chemical oxidation (ISCO) cylinders in select source area wells; 64 cylinders in 12 monitoring wells; replaced yearly Pros- passive treatment for source area concentrations; less expensive Cons - will affect the bioactivity in the aquifer Timeframe - • ISCO at source area for 5 years; • Based on calculations, downgradient from treated source area will reach drinking water standards in 25 years; • LTM estimated for 30 years Costs- • Capital Cost: $99,364 • O&M Costs: $117,110 plus Alt 2 • Present-Worth Cost: $216,474 EPA PROPOSED PLAN FOR TUTU WELLFIELD | 31 Alternative 2D – Surfactant Flushing Enhancement of Alternative 2 with surfactant flushing in source areas; two deep injection wells, five shallow injection wells Pros - removal of source area concentrations and DNAPL Cons- effective only if there is contact; ability of the formation to accept a sufficient volume of surfactant solution is unknown Timeframe - • Surfactant flushing at source area for 1 year; • Based on calculations, downgradient from treated source area will reach drinking water standards in 25 years; • LTM estimated for 26 years. Costs - • Capital Cost: $1,265,756 • O&M Costs: Same as Alt 2 • Present-Worth Cost: $1,265,756 EPA PROPOSED PLAN FOR TUTU WELLFIELD | 32 Alternative 3 – In Situ Thermal Treatment and Pump and Treat System • In situ thermal treatment to target DNAPL in source areas and pump and treat for hydraulic control; 260 to 270 heater wells, co-located with 260 to 270 vacuum extraction points • Add two downgradient extraction wells and upgrade the current treatment system capacity and equipment Pros - ability to penetrate fractured rock matrix and to treat DNAPL and CVOCs Cons - high capital costs Timeframe - • Thermal at source area for 2 years; • Based on calculations, downgradient from treated source area will reach perimeter P&T wells in 10 years; • LTM estimated for 12 years. Costs- • Capital Cost: $89,628,605 • O&M Costs: $4,569,283 • Present-Worth Cost: $94,309,778 Alternative 4 – In Situ Steam Injection and Pump and Treat • In situ steam injection in source areas to release DNAPL with pump and treat for hydraulic control, 60 steam injection wells and 30 multi-phase extraction wells • Add two downgradient extraction wells and upgrade the current treatment system capacity and equipment Pros - mobilize DNAPL which will be captured by the extraction wells Cons - effectiveness of steam injection relies on its ability to contact, heat, and physically displace contaminants; high capital costs Timeframe- • Steam treatment at source area for 2 years; • Based on calculations, downgradient from treated source area will reach drinking water standards in 25 years; • LTM estimated for 27 years Costs- • Capital Cost: $25,568,569 • O&M Costs: $8,539,451 • Present-Worth Cost: $34,171,200 Remedial Alternatives – Common Elements for Alternatives 2, 3 and 4 Pre-Design Investigation (PDI) Institutional Controls Upgrade the current system Long-term monitoring until clean up levels are achieved Site Management Plan Five Year Reviews EPA PROPOSED PLAN FOR TUTU WELLFIELD | 35 EPA’s Nine Criteria for Selecting Cleanup Plans EPA uses nine criteria to evaluate remedial alternatives presented in the Feasibility Study and choose which to implement. The nine criteria are organized into 3 groups: 1. Threshold Criteria 2. Balancing Criteria 3. Modifying Criteria EPA PROPOSED PLAN FOR TUTU WELLFIELD | 36 Threshold Criteria 1. Overall Protection of Human Health and the Environment: Will the plan protect people and the plant and animal life on and near the site? EPA cannot and will not choose a plan that does not meet this basic criterion. 2. Compliance with Applicable or Relevant and Appropriate Requirements: Does the alternative meet all federal and state environmental statutes, regulations and requirements? The chosen cleanup plan must meet this criterion. EPA PROPOSED PLAN FOR TUTU WELLFIELD | 37 Balancing Criteria 3. Long-Term Effectiveness and Permanence: Will the effects of the cleanup last or could it be ineffective and cause future risks? 4. Reduction in Toxicity, Mobility or Volume through Treatment: Does the alternative reduce the harmful effects, spread of, and amount of the contaminated material? 5. Short Term Effectiveness: How soon will site risks be reduced? Could the cleanup cause short-term hazards to workers, residents or the environment? 6. Implementability: Is the alternative technically feasible? Are the right goods and services (i.e. treatment machinery, space at an approved disposal facility) available to complete the plan? 7. Cost: What is the total cost of an alternative over time? EPA must choose a plan that gives necessary protection at reasonable cost. EPA PROPOSED PLAN FOR TUTU WELLFIELD | 38 Modifying Criteria 8. State/Territory Acceptance: Do state/territory environmental agencies agree with EPA’s proposal? 9. Community Acceptance: Acceptance of preferred alternative by the impacted community will be assessed following the public comment period. Provide your comments. EPA PROPOSED PLAN FOR TUTU WELLFIELD | 39 Meeting Agenda Superfund Overview Site Background Remedial Investigation Remedial Alternatives Preferred Remedy Questions/Comments EPA PROPOSED PLAN FOR TUTU WELLFIELD | 40 Preferred Remedy - Alternative 2 , Expand Existing Groundwater Extraction and Ex-Situ Treatment (Pump and Treat) with Alternative 2A, Reinjection Expand existing pump and treat system to include downgradient extraction wells; Upgrade pump and treat system to higher flow rate; Upgrade all treatment equipment to accommodate additional flow and improve efficiency; Reinject treated water; Alternate pumping from existing monitoring wells with high contaminant concentrations; Dual phase extraction from source area wells; and, Long-term groundwater monitoring. EPA PROPOSED PLAN FOR TUTU WELLFIELD | 41 Contingency Remedy - Alternative 2 , Expand Existing Groundwater Extraction and Ex-Situ Treatment (Pump and Treat) with Alternative 2B, AS/SVE Expand existing pump and treat system to include downgradient extraction wells; Upgrade pump and treat system to higher flow rate; Upgrade all treatment equipment to accommodate additional flow and improve efficiency; Air Sparging/SVE at source areas; and, Long-term groundwater monitoring. EPA PROPOSED PLAN FOR TUTU WELLFIELD | 42 Questions and Comments? To request a copy of the Proposed Plan or subscribe to the Tutu Wellfield Superfund site’s email list for the latest updates, contact: Donette Samuel Community Involvement Coordinator E-mail: samuel.donette@epa.gov EPA PROPOSED PLAN FOR TUTU WELLFIELD | 43 Questions and Comments? Please address written comments no later than August 13, 2021, to: Caroline Kwan Remedial Project Manager U.S. Environmental Protection Agency 290 Broadway, 18th Floor New York, NY 10007-1866 E-mail: kwan.caroline@epa.gov EPA PROPOSED PLAN FOR TUTU WELLFIELD | 44 Thank You! Thank you for watching the Tutu Wellfield Superfund site Pre-Recorded Presentation. For more information about the site, visit: https://www.epa.gov/superfund/tutu-wellfield EPA PROPOSED PLAN FOR TUTU WELLFIELD | 45