Sandy Point National Wildlife Refuge in St. Croix, Virgin Islands (RRP-SOP 10(1)) [2014]

Collection
Federal Reference
Sub-shelf
National Archives (NARA)
Kind
Reference Document
Island
St. Croix
Date
2009-06-23
Pages
35
Text
Native Text

FINAL CONSTRUCTION REPORT PROJECT RRP-SOP 10(1) - ARRA Sandy Point National Wildlife INDEX PAGE I. PROJECT DESCRIPTION……………………….………..…… 1 II. PROJECT DATA……………………………………....……..… 2-3 III. CONSTRUCTION..………………………….………....….….... 4-6 IV. CONSTRUCTION ENGINEERING..……………….....…….... 6 V. APPENDIX: Title Sheet/Location Map…………………………………..….... 7-8 Typical Sections…………………………….…………………… 9-10 Tabulation of Bids……………………………………….……… 11-18 Final Voucher Assembly Final Voucher and Claims Release……………..…..…… 19-20 Letter of Acceptance from Client……………….….…… 21 Letter of Acceptance from FHWA……………….…...… 22 Materials Certification………….…….……...………….. 23 Final Estimate…………….……..….…….……………… 24-28 Project Photos………………………………….…….…….……. 29-33 FINAL CONSTRUCTION REPORT PROJECT RRP-SOP 10(1) - ARRA SANDY POINT NATIONAL WILDLIFE REFUGE I. PROJECT DESCRIPTION A. Project Number - Project RRP-SOP 10(1) - ARRA was located in the Sandy Point National Wildlife Refuge in St. Croix, Virgin Islands. B. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://catalog.archives.gov/id/291704300

SHA-256 1d212256b735627fdf99bb28a3c894b472aaae540439bc6c87165f2cf4dbd87b

Re-using this document

Records of the United States Government - 17 USC 105, and this is the one source where that citation genuinely applies (it does NOT reach territorial material). NARA also states rights per record in useRestriction/accessRestriction and those are carried into the catalogue per document. 'Restricted - Possibly' and 'Undetermined' are NARA CATALOGUING PLACEHOLDERS meaning unadjudicated, not prohibitions - NARA serves those files publicly, and refusing them cost the Truman Library's ten-part Hastie interview on the first run.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-1d212256b735

Document text

FINAL CONSTRUCTION REPORT PROJECT RRP-SOP 10(1) - ARRA Sandy Point National Wildlife INDEX PAGE I. PROJECT DESCRIPTION……………………….………..…… 1 II. PROJECT DATA……………………………………....……..… 2-3 III. CONSTRUCTION..………………………….………....….….... 4-6 IV. CONSTRUCTION ENGINEERING..……………….....…….... 6 V. APPENDIX: Title Sheet/Location Map…………………………………..….... 7-8 Typical Sections…………………………….…………………… 9-10 Tabulation of Bids……………………………………….……… 11-18 Final Voucher Assembly Final Voucher and Claims Release……………..…..…… 19-20 Letter of Acceptance from Client……………….….…… 21 Letter of Acceptance from FHWA……………….…...… 22 Materials Certification………….…….……...………….. 23 Final Estimate…………….……..….…….……………… 24-28 Project Photos………………………………….…….…….……. 29-33 FINAL CONSTRUCTION REPORT PROJECT RRP-SOP 10(1) - ARRA SANDY POINT NATIONAL WILDLIFE REFUGE I. PROJECT DESCRIPTION A. Project Number - Project RRP-SOP 10(1) - ARRA was located in the Sandy Point National Wildlife Refuge in St. Croix, Virgin Islands. B. Description of Work – This project consisted of rehabilitation of Tranberg Road (Routes 10 and 100) and 5 parking areas including aggregate resurfacing, drainage, signage improvements, and other miscellaneous work. This project was partially funded through the American Recovery and Reinvestment Act of 2009 (ARRA). C. Permits – National Environmental Policy Act (NEPA) Compliance: In accordance with Compliance 23 CFR Chapter 1 771.117(d) (1&3), an Environmental Assessment (EA) was done and a Finding of No Significant Impact (FONSI) was prepared and signed by the Federal Highway Administration (FHWA) on October 5, 2009. State Historic Preservation Office (SHPO) – 106 Concurrence: By letter dated June 23, 2009, the Virgin Islands SHPO determined that there were no known cultural resources within the proposed project area protected in accordance to Section 106 of the National Historic Preservation Act. Fish and Wildlife Service (FWS) – Section 7 Concurrence: By letter dated August 27, 2008, the U.S. Fish and Wildlife Service concurred that there were no known adverse effects anticipated on resources protected by the Endangered Species Act of 1973. National Pollutant Discharge Elimination System (NPDES) Permit – By letter dated September 24, 2007, the United States Virgin Islands Department of Planning and Natural Resources (VIDPNR) issued Permit VIDSA0000, in accordance with the provisions of the Clean Water Act, 33 USC § 1251 et. seq. Building Permit – By permit dated February 5, 2010, the United States Virgin Islands Department of Planning and Natural Resources (VIDPNR) issued the Permit No. STX 138-10, in accordance with IBC 2009 & V.I. Code Compliance. Coastal Zone Management (CZM) Permit – By letter dated August 17, 2009, the United States Virgin Islands Department of Planning and Natural Resources (VIDPNR) issued the CZM Land Permit No. CZX-32-09FC, in accordance to V.I.R & Regulations Tit 12, Chapter 21, Subchapter 904 and 902. 1 II. PROJECT DATA A. Specifications – Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 (US Customary units). B. Termini – Tranberg Road: Station 0+8.79 to 115+47.50 C. Length – Tranberg Road: 11,538.71 Feet (2.19 Miles) D. Width – Tranberg Road: Two 6-foot lanes E. Pavement Structure – Tranberg Road: 8-inch aggregate surface course grade C or D F. Structures – None G. Contract Number and Date – DTFH71-10-C-00026 – June 28, 2010 H. Contracting Officers – Melisa L. Ridenour Division Engineer Laurin R. Lineman Director, Project Delivery Wanda A. Peffer Contracting Officer Thomas J. Scott, Jr. Construction Engineer Jameel A. Siddiqi Construction Operation Engineer I. Contract Bid Amount – $1,966,200.00 J. Engineers Estimate – $1,500,000.00 K. Final Contract Amount – $1,921,057.70 2 L. Contract Time – Award Date: June 28, 2010 Notice to Proceed: August 13, 2010 Original Completion date: March 17, 2011 Extension Granted: 203 Days Revised Completion Date: October 06, 2011 Date Substantially Complete: October 06, 2011 Date All Work Complete: October 06, 2011 Liquidated Damages: None M. Contractor – Island Road Corporation Small Business Concern (SBC) 6501 Red Hook Plaza, Suite 201 Disadvantaged Business Enterprise (DBE) St. Thomas, VI 00801 N. Subcontractors – Perry Romney SBC, DBE P.O. Box 3296 St. Croix, VI 00851 Clearing & Grubbing $15,200.00 Survey Services Company, LLC SBC 27-28 King Cross Street Christiansted, VI 00820 Surveying $11,000.00 O. Construction Engineering Costs – EFLHD PE Costs: $400,969.59 EFLHD CE Costs: $195,444.83 Total Costs: $596,414.42 Percent of the Final Contract Amount: 31.05% P. Maintaining Agency - U.S. Fish & Wildlife Service 3 III. CONSTRUCTION A. Materials – Item No. 30110-0000: Aggregate Base, Surface Course Supplier: Aggregate, Inc. 9010 Cottage Christiansted St. Croix, VI 00820-5662 Material: Crushed Aggregate – St. Croix Quarry, USVI Approved Job Mix Design: Allowable Target Value Deviation Specification Sieves (Percent Passing) (Percent) (Percent Passing) 1-inch 100 - 100 3/4-inch 99 ±1 99-100 1/2-inch 86 ±6 80-86 3/8-inch 76 ±4 72-80 No. 4 56 ±4 52-60 No. 40 22 ±4 18-26 No. 200 12.1 ±2.0 10.1-14.1 Maximum Dry Density: 143.4 pounds per cubic foot (pcf) Optimum Moisture Content: 6.3 percent Liquid Limit: ND Plasticity Index: Non-plastic California Bearing Ratio: 24.4 percent B. Experimental or New Features – None C. Changes and Problems – 1. Changes Contract Modification (CM) No. 0001: was issued to obligate additional American Recovery and Reinvestment Act (ARRA) into the contract. Details of the additional work were to be finalized upon definitization of CM No. 0001. Net contract increase = $93,443.63 No change in contract time. CM No. 0002: was issued to reduce the non-ARRA funds. Net contract decrease = $93,443.63 No change in contract time. 4 CM No. 0003: was issued for additional work at the request of the U.S. Fish and Wildlife Service for installation of additional guardrails for enhanced safety and installation of additional riprap to protect the embankment slope against the sea surge during the hurricane season. The CM also increased the quantity of existing pay items due to poor conditions found at the Route 904 parking area, requiring additional excavation and removal of the unsuitable subgrade material. Additional, the CM extended the contract time by 75 calendar days due to additional work and delays due to inclement weather. This CM resulted in an increase of non-ARRA funding. Net contract increase = $47,535.00 New completion date: May 31, 2011 CM No. 0004: was issued to adjust the existing pay items that varied from the Original Engineer’s Estimate due to unforeseen and existing field conditions. This CM also extended the contract time by 128 calendar days due to weather related delays. This CM resulted in a decrease of non-ARRA funds. Net contract decrease = $92,677.30 New completion date: October 6, 2011 Significant Overruns and Underruns 25101-2000 Placed Rip Rap, Class 2 - The original quantity was 393 cubic yards, and the quantity required to complete the contract was 477.89 cubic yards, an overrun of 84.89 cubic yards or 21.60 percent. It was necessary to place additional rip rap on the Refuge’s main parking lot to comply with the punch list items requested by the Refuge Manager. 30110-0000 Aggregate Surface Course - The original quantity was 9,000 tons, and the quantity required to complete the contract was 9295.82 tons, an overrun of 295.82 tons or 3.29 percent. The original quantity was underestimated. 61702-0400 Terminal Section G4-CRT - The original quantity was 4 each, and the quantity required to complete the contract was 8 each, an overrun of 4 each or 100.00 percent. Contract Modification (CM) No. 003 added additional guardrails as per the Refuge’s request. In order to finish the installation and guarantee the safety of the drivers, 4 additional terminal sections will be installed. 15705-0100 Soil Erosion Control, Silt Fence - The original quantity was 4,100 linear feet, and the quantity required to complete the contract was 850 linear feet, an underrun of 3,250 linear feet or 79.27 percent. Because of the existing conditions on the Refuge, we needed less material than originally estimated. 15706-1600 Soil Erosion Control, Stabilized Construction Entrance - The original quantity of 1 each was not needed, and therefor underran by 100.00 percent. The existing Refuge entrance was used for the entrance erosion control measures, making it unnecessary to build a new one. 5 20420-0000 Subexcavation - The original quantity was 863.00 cubic yards, and the quantity required to complete the contract was 460.18 cubic yards. This item was originally overestimated and underran by 402.82 cubic yards or 46.68 percent. 30502-0700 Aggregate, Top Soil Course, 4-Inch Depth - The original quantity of 1,200 square yards was not needed, therefor underran by 100.00 percent. During the project execution, the Refuge Manager requested the elimination of all planting items, making the use of top soil unnecessary on the project. 62501-0000 Turf Establishment - The original quantity of 3.3 acres was not needed, therefor underran by 100.00 percent. The Refuge Manager requested the elimination of this item to avoid disturbing the indigenous plants and trees. 62630-0400 Plantings - The original quantity of 100 each was not needed, therefor underrun of 100.00 percent. The Refuge Manager requested the elimination of this item to avoid disturbing the indigenous plants and trees. 2. Problems None D. Recommendations – None E. Claims – None IV. CONSTRUCTION ENGINEERING A. Project Personnel – Miguel Rodriguez, Project Engineer/ COTR B. Contract Inspection – None C. Other Contacts – Ricardo Antonetti, Facilities Operations Specialist, USFWS Michael Evans, Sandy Point Refuge Manager, USFWS D. Partnering – Informal partnering was successfully implemented on this project and a good relationship was maintained between all stakeholders. 6 7 8 9 10 T A B U L A T I O N O F B I D S Project No.: Project Name: RRP-SOP 10(1) SANDY POINT NATIONAL WILDLIFE REFUGE Contractor Responsive Bid Amount State: County: Opened at: By: Date: VI U.S. FISH AND WILDLIFE SERVICE Sterling, VA James Wright 05/19/2010 Signed: James Wright Title: Program Assistant Date: 5/19/2010 Contract Awarded to: Island Roads Corporation Date: 6/28/2010 I certify that this Bid Tabulation accurately reflects the bids received and publicly opened for this solicitation. Bid Schedule A Island Roads Corporation 6501 Red Hook Plaza Suite 201 St. Thomas, VI 00802 1,966,200.00 GEC, LLC 13 F Estate Bethlem - P.O. Box Kingshill, VI 00851 2,435,785.00 Tip Top Construction 5064 Mt. Welcome Christiansted, VI 00820 2,837,154.00 Engineer's Estimate 1,500,000.00 11 T A B U L A T I O N O F B I D S Project No.: Project Name: RRP-SOP 10(1) SANDY POINT NATIONAL WILDLIFE REFUGE Date: 05/19/10 Item Item Item No. Unit Description Quantity Unit Price Amount Bid Schedule A 15101-0000 LPSM MOBILIZATION Island Roads Corporation ALL 190,000.00 190,000.00 GEC, LLC 120,000.00 120,000.00 Tip Top Construction 189,764.00 189,764.00 ENGINEER'S ESTIMATE 140,180.00 140,180.00 15201-0000 LPSM CONSTRUCTION SURVEY AND STAKING Island Roads Corporation ALL 10,000.00 10,000.00 GEC, LLC 25,000.00 25,000.00 Tip Top Construction 22,000.00 22,000.00 ENGINEER'S ESTIMATE 40,000.00 40,000.00 15401-0000 LPSM CONTRACTOR TESTING Island Roads Corporation ALL 20,000.00 20,000.00 GEC, LLC 15,000.00 15,000.00 Tip Top Construction 15,000.00 15,000.00 ENGINEER'S ESTIMATE 40,000.00 40,000.00 15705-0100 LNFT SOIL EROSION CONTROL, SILT FENCE Island Roads Corporation 14,100 6.00 84,600.00 GEC, LLC 18.00 253,800.00 Tip Top Construction 4.00 56,400.00 ENGINEER'S ESTIMATE 8.00 112,800.00 15706-1600 EACH SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE Island Roads Corporation 1 3,000.00 3,000.00 GEC, LLC 7,500.00 7,500.00 Tip Top Construction 2,500.00 2,500.00 ENGINEER'S ESTIMATE 4,500.00 4,500.00 20101-0000 ACRE CLEARING AND GRUBBING Island Roads Corporation 4.5 5,000.00 22,500.00 GEC, LLC 2,750.00 12,375.00 Tip Top Construction 6,000.00 27,000.00 ENGINEER'S ESTIMATE 4,900.00 22,050.00 20402-0000 CUYD SUBEXCAVATION Island Roads Corporation 280 25.00 7,000.00 GEC, LLC 57.00 15,960.00 Tip Top Construction 45.00 12,600.00 ENGINEER'S ESTIMATE 30.00 8,400.00 12 T A B U L A T I O N O F B I D S Project No.: Project Name: RRP-SOP 10(1) SANDY POINT NATIONAL WILDLIFE REFUGE Date: 05/19/10 Item Item Item No. Unit Description Quantity Unit Price Amount Bid Schedule A 20420-0000 CUYD EMBANKMENT CONSTRUCTION Island Roads Corporation 4,200 35.00 147,000.00 GEC, LLC 60.00 252,000.00 Tip Top Construction 75.00 315,000.00 ENGINEER'S ESTIMATE 33.00 138,600.00 20701-1000 SQYD EARTHWORK GEOTEXTILE, TYPE III-A Island Roads Corporation 6,400 15.00 96,000.00 GEC, LLC 13.00 83,200.00 Tip Top Construction 6.00 38,400.00 ENGINEER'S ESTIMATE 3.00 19,200.00 21101-1000 SQYD ROADWAY OBLITERATION, METHOD 1 Island Roads Corporation 100 50.00 5,000.00 GEC, LLC 50.00 5,000.00 Tip Top Construction 100.00 10,000.00 ENGINEER'S ESTIMATE 16.00 1,600.00 25101-2000 CUYD PLACED RIPRAP, CLASS 2 Island Roads Corporation 210 200.00 42,000.00 GEC, LLC 175.00 36,750.00 Tip Top Construction 125.00 26,250.00 ENGINEER'S ESTIMATE 130.00 27,300.00 30110-0000 TON AGGREGATE SURFACE COURSE Island Roads Corporation 9,000 90.00 810,000.00 GEC, LLC 65.00 585,000.00 Tip Top Construction 175.00 1,575,000.00 ENGINEER'S ESTIMATE 55.00 495,000.00 30302-6000 LNFT ROADWAY RECONDITIONING Island Roads Corporation 9,500 10.00 95,000.00 GEC, LLC 50.00 475,000.00 Tip Top Construction 22.50 213,750.00 ENGINEER'S ESTIMATE 12.00 114,000.00 30502-0700 SQYD AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH Island Roads Corporation 1,200 25.00 30,000.00 GEC, LLC 40.00 48,000.00 Tip Top Construction 25.00 30,000.00 ENGINEER'S ESTIMATE 13.00 15,600.00 13 T A B U L A T I O N O F B I D S Project No.: Project Name: RRP-SOP 10(1) SANDY POINT NATIONAL WILDLIFE REFUGE Date: 05/19/10 Item Item Item No. Unit Description Quantity Unit Price Amount Bid Schedule A 60103-0660 EACH CONCRETE, HEADWALL FOR DOUBLE 36-INCH PIPE CULVERT Island Roads Corporation 2 10,000.00 20,000.00 GEC, LLC 2,750.00 5,500.00 Tip Top Construction 7,500.00 15,000.00 ENGINEER'S ESTIMATE 2,400.00 4,800.00 60201-1000 LNFT 36-INCH PIPE CULVERT Island Roads Corporation 50 400.00 20,000.00 GEC, LLC 275.00 13,750.00 Tip Top Construction 450.00 22,500.00 ENGINEER'S ESTIMATE 150.00 7,500.00 60413-0000 LNFT TRENCH DRAIN Island Roads Corporation 260 200.00 52,000.00 GEC, LLC 675.00 175,500.00 Tip Top Construction 175.00 45,500.00 ENGINEER'S ESTIMATE 530.00 137,800.00 60915-3000 EACH WHEELSTOP, RECYCLED PLASTIC Island Roads Corporation 109 150.00 16,350.00 GEC, LLC 200.00 21,800.00 Tip Top Construction 200.00 21,800.00 ENGINEER'S ESTIMATE 100.00 10,900.00 61502-1000 SQYD DRIVE PAD, CONCRETE Island Roads Corporation 90 150.00 13,500.00 GEC, LLC 110.00 9,900.00 Tip Top Construction 166.00 14,940.00 ENGINEER'S ESTIMATE 160.00 14,400.00 61701-1350 LNFT GUARDRAIL SYSTEM G4, TYPE 2, CLASS B STEEL POSTS Island Roads Corporation 200 150.00 30,000.00 GEC, LLC 90.00 18,000.00 Tip Top Construction 150.00 30,000.00 ENGINEER'S ESTIMATE 70.00 14,000.00 61702-0400 EACH TERMINAL SECTION, TYPE G4-CRT Island Roads Corporation 4 3,000.00 12,000.00 GEC, LLC 3,500.00 14,000.00 Tip Top Construction 750.00 3,000.00 ENGINEER'S ESTIMATE 2,000.00 8,000.00 14 T A B U L A T I O N O F B I D S Project No.: Project Name: RRP-SOP 10(1) SANDY POINT NATIONAL WILDLIFE REFUGE Date: 05/19/10 Item Item Item No. Unit Description Quantity Unit Price Amount Bid Schedule A 61920-2000 EACH REMOVE AND RESET GATE Island Roads Corporation 1 2,000.00 2,000.00 GEC, LLC 4,500.00 4,500.00 Tip Top Construction 1,500.00 1,500.00 ENGINEER'S ESTIMATE 2,800.00 2,800.00 62501-0000 ACRE TURF ESTABLISHMENT Island Roads Corporation 3.3 20,000.00 66,000.00 GEC, LLC 40,000.00 132,000.00 Tip Top Construction 15,000.00 49,500.00 ENGINEER'S ESTIMATE 8,000.00 26,400.00 62630-0400 EACH PLANTINGS, WETLAND PLANT, CONTAINER GROWN (RHIZOPHORA MANGLE - RED MANGROVE) Island Roads Corporation 100 200.00 20,000.00 GEC, LLC 20.00 2,000.00 Tip Top Construction 150.00 15,000.00 ENGINEER'S ESTIMATE 50.00 5,000.00 63304-0900 SQFT SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING Island Roads Corporation 130 100.00 13,000.00 GEC, LLC 60.00 7,800.00 Tip Top Construction 250.00 32,500.00 ENGINEER'S ESTIMATE 86.00 11,180.00 63401-0300 LNFT PAVEMENT MARKINGS, TYPE B, SOLID Island Roads Corporation 150 15.00 2,250.00 GEC, LLC 3.00 450.00 Tip Top Construction 15.00 2,250.00 ENGINEER'S ESTIMATE 2.60 390.00 63501-0000 LPSM TEMPORARY TRAFFIC CONTROL Island Roads Corporation ALL 5,000.00 5,000.00 GEC, LLC 25,000.00 25,000.00 Tip Top Construction 10,000.00 10,000.00 ENGINEER'S ESTIMATE 10,000.00 10,000.00 63602-2000 EACH SYSTEM INSTALLATION, LIGHTING Island Roads Corporation 4 12,000.00 48,000.00 GEC, LLC 7,500.00 30,000.00 Tip Top Construction 2,500.00 10,000.00 ENGINEER'S ESTIMATE 5,400.00 21,600.00 15 T A B U L A T I O N O F B I D S Project No.: Project Name: RRP-SOP 10(1) SANDY POINT NATIONAL WILDLIFE REFUGE Date: 05/19/10 Item Item Item No. Unit Description Quantity Unit Price Amount Bid Schedule A 63701-0000 EACH FIELD OFFICE Island Roads Corporation 1 40,000.00 40,000.00 GEC, LLC 25,000.00 25,000.00 Tip Top Construction 5,000.00 5,000.00 ENGINEER'S ESTIMATE 20,000.00 20,000.00 64605-3100 LPSM FIXTURE, FLOATING DOCK (NESTING PLATFORM) Island Roads Corporation ALL 44,000.00 44,000.00 GEC, LLC 16,000.00 16,000.00 Tip Top Construction 25,000.00 25,000.00 ENGINEER'S ESTIMATE 26,000.00 26,000.00 16 T A B U L A T I O N O F B I D S Project No.: Project Name: RRP-SOP 10(1) SANDY POINT NATIONAL WILDLIFE REFUGE Date: 05/19/10 B I D I T E M C H E C K P A S S Item No. Computed Bidder's Extension Extension Bidder Bid Schedule A No extension errors in this Schedule. 17 T A B U L A T I O N O F B I D S Project No.: Project Name: RRP-SOP 10(1) SANDY POINT NATIONAL WILDLIFE REFUGE Date: 05/19/10 B I D T O T A L C H E C K P A S S Computed Bid Amount Bid Amount Error Bidder's Bidder Bid Schedule A Island Roads Corporation 1,966,200.00 1,966,200.00 GEC, LLC 2,435,785.00 2,435,785.00 Tip Top Construction 2,837,154.00 2,837,154.00 The apparent low bidder is 31 % above the engineer's estimate. 18 19 20 21 22 23 24 25 26 27 28 REFUGE ENTRANCE AND MAIN PARKING LOT BEFORE REHABILITATION REFUGE ENTRANCE AND MAIN PARKING LOT AFTER REHABILITATION 29 STATION 36+00 OF TRANBERG ROAD BEFORE REHABILITATION STATION 36+00 OF TRANBERG ROAD AFTER REHABILITATION 30 NEW PARKING AREA ON ROUTE 904, STATION 111+00 NEW PARKING AREA ON ROUTE 901, STATION 68+00 31 STATION 20+00 OF TRANBERG ROAD BEFORE REHABILITATION STATION 20+00 OF TRANBERG ROAD AFTER REHABILITATION 32 STATION 95+00 OF TRANBERG ROAD AFTER REHABILITATION AERIAL VIEW OF THE TRANBERG ROAD AFTER REHABILITATION 33