U&W Inv. to GEC #14546, GEC Contract Completion Schedule — Culture, Youth, Aging and Parks
U&W PO Box 1720 Kingshill, USVI, 00851 Ph: 340-778-0012 Fax: 340-778-2545 email: klustig@gecusvi.com GEC, LLC (Paul E.Joseph Stadium) P.O. Box 1656, Kingshill St. Croix, VI 00851 CUSTOMER #: Customer PO #: Item # 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 0000522 Description B. PAUL E JOSEPH STADIUM 21.b(ii) Field Lighting material purchase PEJ Stadium C. TERRENCE MARTIN FIELD 8 (ii) Field Lighting material purchase TM Station Guaranteed Lighting Performance Guaranteed light levels of 60-40 footcandles on large field; 5030 footcandles on small field System Description (Light-Structure System) (8} Pre-cast concrete bases with integrated lightining rounding (8) Galvanized steel poles to slip-fit onto pre-cast concrete bases (2) Galvanized steel poles with baseplate for custom foundation Factory wired and tested remote electrical component enclosures Pole length, factory assembled wire harnesses (10) Factory wired poletop luminaire assemblies (2) Custom made mounts to connect to roof structure (66) Factory aimed and assembled luminaries, including BallTracker luminaires UL Liste …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
SHA-256 23357196bddd43bde86fdf507010b7310efa87ba092fba800348a05e036cd474
Re-using this document
A proceeding of the Legislature of the Virgin Islands, open to the public under 3 V.I.C. § 881, which reaches any committee of any branch of government and permits the news media to publish what it records.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-23357196bddd
Document text
U&W PO Box 1720 Kingshill, USVI, 00851 Ph: 340-778-0012 Fax: 340-778-2545 email: klustig@gecusvi.com GEC, LLC (Paul E.Joseph Stadium) P.O. Box 1656, Kingshill St. Croix, VI 00851 CUSTOMER #: Customer PO #: Item # 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 0000522 Description B. PAUL E JOSEPH STADIUM 21.b(ii) Field Lighting material purchase PEJ Stadium C. TERRENCE MARTIN FIELD 8 (ii) Field Lighting material purchase TM Station Guaranteed Lighting Performance Guaranteed light levels of 60-40 footcandles on large field; 5030 footcandles on small field System Description (Light-Structure System) (8} Pre-cast concrete bases with integrated lightining rounding (8) Galvanized steel poles to slip-fit onto pre-cast concrete bases (2) Galvanized steel poles with baseplate for custom foundation Factory wired and tested remote electrical component enclosures Pole length, factory assembled wire harnesses (10) Factory wired poletop luminaire assemblies (2) Custom made mounts to connect to roof structure (66) Factory aimed and assembled luminaries, including BallTracker luminaires UL Listed as a complete system Control Systems and Services DATE 11/08/2022 INVOICE NO. 14546 ATTENTION: Ship Vis: None Ordered Price Each 0.00 0.00 0.00 0.00 1.00 741,000.00 0.00 0.00 1.00 203,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 THANK YOU Amount 0.00 0.00 741,000.00 0.00 203,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 U&Ww PO Box 1720 Kingshill, USVI, 00851 Ph: 340-778-0012 Fax: 340-778-2545 email: klustig@gecusvi.com GEC, LLC (Paul E.Joseph Stadium) P.O. Box 1656, Kingshill St. Croix, VI 00851 CUSTOMER #: 0000522 Customer PO # DATE 11/08/2022 INVOICE NO. 14546 ATTENTION: Ship Vis: None Ordered Price Each Item # Description 18 92) Lighting contactor cabinet with contactors and on/off key switches THANK YOU 0.00 0.00 DUE THIS INVOICE Amount 0.00 $944,000.00 Date: October 21%, 2022 Project: Paul E. Joseph Stadium To: U&W Industrial Supply St Croix, USVI PEJ Stadium Light-Structure System with Total Light Control — TLC for LED™ technology __ Guaranteed Lighting Performance Ky Martin } ® Guaranteed light levels of 60-40 footcandles on large field; 50-30 footcandles on small tietd ® fallTracker™ technology — targeted light, optimizing visibility of the ball in play with no glare in the players typical line-of-sight System Description (Light-Structure System] ® {8) Pre-cast concrete bases with integrated lightning grounding By Paul Ferreras {8) Galvanized steel poles to slip-fit onto pre-cast concrete bases {2) Galvanized steel poles with baseplate for custom foundation e e e Factory wired and tested remote electrical component enclosures e Pole length, factory assembled wire harnesses ® {10} Factory wired poletop luminaire assemblies e (2} Custom made mounts to connect to roof structure ® (66) Factory aimed and assembled luminaries, Including BallTracker™ iuminaires « UL Listed as a complete system Control Systems and Services yore for each field | e (2) Lighting contactor cabinet with contactors and on/off key switches Operation and Warranty Services © Reduction of energy and maintenance costs by 50% to 85% over typical 1500W metal halide equipment © Product assurance and warranty program that covers materials and onsite labor, eliminating 100% of your maintenance costs for 10 years ® Support from Musco’'s Lighting Services Team — over 170 Team members dedicated to operating and maintaining your lighting system Responsibilities of Buyer = an = = e Confirm pofe locations, supply voltage ae phase required for lighting ari prior to abaction e Provide electrical design and materiats for electrical distribution system e Provide inland freight to job site e Provide labour and equipment for civil, electrical and mechanical installation e Pay applicable taxes APUSO0 GS 2016, 2018 Mausco Sporis Lighting, LLG a ¢ — Structural integrity of roofs to support Musco roof mounted ie ee Paul Ferreras_| e Create custom foundation for (2) large B poles on main stadium e Provide necessary dimensions of roof structure, enabling Musco to make special-build mounts Mi Musco Scope e Provide design and layout for lighting system Bring containers to St. Croix (CIP) Test and final aim equipment Provide project management to supervise installation of lighting equipment, as needed oe @ Delivery Timing __ 22 weeks for delivery of materials to port from the time of order, submittal approval, and confirmation of order details including voltage, phase, and pole locations. Due to the built-in custom light contro! per tuminaire, pole locations need to be confirmed prior to production. Changes to pole locations after the product is sent to production could result in additional charges. Notes Quote is based on: e Shipment of entire project together to one location in 1 combined shipment. e CIP shipment of 4 containers to St. Croix e Structural code and wind speed = 2018 IBC 164mph Category it exposure C e Please note that 2018 IBC building code was adopted after project was originally quoted « Standard soil conditions — rock, bottomless, wet or unsultable soil may require customized foundations, special installation methods and additional cost. ¢ Musco can provide custom foundation design if provided with adequate geotechnical report consistent with depth of Musco standard foundations e Lighting Design Number 179482G @ Minimum fight levels for bullpens included NiCSCO aE ©2018, 2018 Musco Sporte Lighfing, LLC ots Sr ee 5.Poletop Luminaire Assembly : * Ma Le 1. Precast 4. Wire ! EL Concrete Harness SU & Base ' ee ote i, WARE oak ee 3. Electrical ae Components J Gia 2. Galvanized Enclosure ? Gaiam Steel Pole | GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES Department of Property and Procurement | 8201 Sub Base, 3rd Floor, St. Thomas, U.S. Virgin Islands 00802 3274 Estate Richmond, Christiansted, U.S, Virgin Islands 00820 St.Thomas: | St. Croix: Main Office: (340) 774-0828 Main Office: (340) 773-1561 Fax: (340) 777-9587. | www.dpp.vi.gov Memorandum: To: From: Date: Re: KC. Nathan Simmonds Director, Finance and Administration Virgin Islands Public Finance Authority Lisa M. Alejandro E22 OD Acting Commissioner > a Department of Property & Procurement March 21, 2023 Request for Payment to GEC, LLC Transmitted herewith for partial payment is Periodical Estimate No. Three (3), for Construction Services performed by GEC, LLC, for the Additional Work to the Design/Build for Paul E. Joseph Stadium & Sports Complex, St. Croix, Virgin Islands as outlined in Contract No. COOA3SPRC15(GEC). Estimate Number Date Amount P.E. #3 March 11, 2023 $174,780.00 The Funding Source for this payment is the Infernal Revenue Matching Funds (Pursuant to Act No. 8326). Should you require additional information, please feel free to contact Mr. Trevor Charles at (340) 773-1561 ext. 4457. Department of Sports, Parks & Recreation Department of Public Works Department of Property and Procurement Contract File Department of Property and Procurement 8201 Sub Base, 3rd Floor, St. Thomas, U.S. Virgin Islands 00802 3274 Estate Richmond, Christiansted, U.S. Virgin Islands 00820 St. Thomas: St. Crolx: Main Office: (340) 774-0828 Main Office: (340) 773-1561 Fax: (340) 777-9587 www.dpp.vigov | GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES March 21, 2023 John R. Wessel Managing Member GEC, LLC 13F Estate Bethlehem P.O. Box 1656 Kingshill, VI 00851 RE: APPROVED PERIODICAL ESTIMATE NO. THREE (3) C003ASPRC15(GEC) — Additional Work to the Design/Build for Paul E. Joseph Stadium & Sports Complex, St. Croix, U.S. Virgin Islands Dear Mr. Wessel: Transmitted herewith approved is Periodical Estimate Number Three (3) for services performed by your company during the period of November 22, 2022 through February 10, 2023, relative to the above- referenced contract. Periodical Estimate Number Three (3) is approved in the amount of One Hundred Seventy-Four Thousand, Seven Hundred Eighty Dollars and Zero Cents ($174,780.00). A copy of this approved payment will be forwarded to the Virgin Islands Public Finance Authority for further processing. Respectfully, LisaM. Alejandro Acting Commissioner LMA/dp/te xe: Department of Sports, Parks and Recreation Department of Public Works Virgin Islands Public Finance Authority Department of Property and Procurement Contract File VV March 16, 2023 Mrs. Lisa M. Alejandro Acting Commissioner Department of Property and Procurement 3274 Estate Richmond Christiansted, VI 00820 RE: PERIODICAL ESTIMATE NO. 3 C003ASPRC15(GEC)—Additional Work to the Design/Build for Paul E. Joseph Stadium and Sports Complex Dear Acting Commissioner Alejandro: Transmitted herewith for your review and further approval is Periodical Estimate No. 3 submitted by GEC, LLC, for the above referenced project. The payment is in the amount of One Hundred Seventy-Four Thousand, Seven Hundred Eighty Dollars and Zero Cents ($174,780.00). All items billed in the payment request have been completed according to the scope of work. If you have any questions or concerns, please contact Chief Engineer Tawana Nicholas, at 340.773.1290, extension 2260, or via email at tawana.nicholas@dpw.vi.gov. Sincerely, Va Rueben Jennings Acting Commissioner RJkIp CC: Kizma Ll. Petersen, Chief Procurement Officer, DPW a DEPARTMENT OF PUBLIC WORKS ST. CROIX 340.773.1290 United States Virgin Islands DPW. ST. THOMAS /ST. JOHN 340.776.4844 VV February 13, 2023 Honorable Albert Bryan, Jr. Governor of the Virgin Islands Government House 5027 (21-22) Kongens Gade St. Thomas, Virgin Islands 00802 RE: ABSENCE FROM THE OFFICE REQUEST Dear Governor Bryan: | hereby request your approval of my scheduled upcoming leave. | will be out of the office on the following dates: February 23 through February 27, 2023 and March 16 through March 20, 2023. During my absence, Assistant Commissioner, Rueben Jennings will manage the department's day- to-day operations territory wide. | will also be available via cellular or email. Please see the following contact information for both me and Assistant Commissioner, Rueben Jennings. Derek Gabriel Rueben Jennings (340)642-1300 (340)244-0004 derek. gabriel@dpw.vi.gov ryeben.jennings@dpw. vi.gov Your favorable consideration of this request is appreciated. - erely, rek Gabriel Commissioner { pproved ) Disapproved FOC Se n, Jr. oA Governor DEPARTMENT OF PUBLIC WORKS ST. CROIX 340.773 United States Virgin Is slaneds DPW VILGOV ST. THOMAS/SFE. JOHN 340.776.4844 OQOVERAUENT OF THE VINO LANDS PRRIODICAL ESTIMATE FOR PARTIAL PAYMENT HAME OF PROJECT: upplementel Cortvact Pad E. Joneph Siadkon and Sports Complex LOCATION: St. Grol, Virgin Ietande NAME OF CONTRACTOR ore, Luc Contacte, COOIASPAC IDES) PERIODICAL ESTIMATE HO. 2 FOR PERIOD $1.22.22 40 24009 { LI _t I OABMAL ESTRATI COMPLETED 1 CATE eT TO ATE | vate of Uncemolated % Cem Rents. Doserton of tom Ouurtty | ua viencs | Coal Per Unk vibe band Vohee eer, pimed }_) ) kU] 2) i $ . 1 us $ 555.000.00/$ 555,000.00) 1.0 | % 194,700.00 | 5 380,300.00 BieK% 1 w $ «15,000.00 7 $ 19,000.00] 1.0 1$ 1,500.00 | $ 13,500.00 10.00% 4 “we $ 75,000.00] $ 75,000.00] 10 13 7,500.00 |S 67,500.00 19.00% 1 uw S$ 36,500.00 19 #000] 10 538 3.850.00 15 4,850.00 10.90% . u § 195.000.00]$ 196,000.00] 1.0 }¢ 19,500.00 | $ 175,$00.00 10.20% ' ue |$ 20,000,00]$ 20,00000] 1.0 |$ 2.000,00 | $ 18,000.00 19.00% 18 _| Barking Storage Aves 1 uw $ 20,000.00] $ 20,000,00| 1.0 |$ 2,000,00 | $ 18,000.00 10,00% 1 “a $ 280,000.00]3$ 280,000.00) 10 15 468,000.00 | $ 142,000,00 00% 1 w $ 690,000.00 }$ 690,000.00) 1.0 | $ 630,000.00 | $ $0,000.00 26% 1 u $ §4,000.001$ $4,000.00] 10 ]3$ 5,400.00 | $ 48,600.00 10.00% $ - $ . H) vy 5 92,506,001 $ 92,500.00] 1.0 |$ 9,250,060 | $ 83.250,00 10.00% 1 is $ 115,000.00)$ 115,000.00] 1.0 /3 11,500.00 | S 103,500,00 10.0% 1 us $ 85,000.00/1$ 85.000.00] 10 |$ 35,500,00 | $ 49,500,00 ANTES 1 “w $ 230,000.00) $ 230.000.00] 1.0 |$ 23,000.00 | $ 207,000.00 10.00% x Electric & 1 w $ 95,000.00] $ 95,000.00} 10 13 9.500.00 | $ 85,500.00 10.00% = (Hove) Foks ’ ry S 270,000.001$ 270,000.00] 1.0 |$ 230,000.00 | § 40,000.00 LAL item Ravt Roem Sarvctwe: ’ uw S 175,000.00 ]$ 175,000.00] 10 1$ 17,500.00 | $ 157,800.00 10.90%, RUGHON CHRISTMAS CARNIVAL VILLAGE No Seopa { | 1 ua $ 77,000.00) $ 77,000.00] 1.0 | 7,700.00 | $ 69,300.00 10.00% ’ Bs $ 163,000.00 FS 103,000.00] 1.0 |$ 19,300.00 | $ 173,700.00 10.90% ' us $ 95.000.001$ 95,000.00] 1.0 }$ 9,500.00 | $ 85,500.00 10.00% 1 is S 335,.000.00]$ 336,000.00] 1.0 | ¢ 33,500.00 | $ 301,500.00 10.00% 1 “a $ 95,000,00] $ 95,000.00] 1,0 13 9,500.00 | S 86,500.00 10.00% 1 “a $ 100,000,00/$ 100.000,00/ 10 | 3 10,000.00 | S 90,000.00 10.20% [Totate + _aroosoaos|$ —4100.00000 % 1,560,700 | $ 2,430,90000 cor] had Co enereCT, SOVERMAEUT OF Teed ROBT OAD PRR ICICAL AS TMATIL POR PARTING PATSEENY Loca niom —_by, Gram Vege hbo MAME OF CORTHAL TOR 245, 4s Coe arte, PELOOK AL EETMATE HO, 2 Pom OGRE RAT te aha A B * * % rllete to di tem Neo] Oescription of flan van oven plete] Complete vious | + Campbew Hae) # Completed to moved to PE beamed Previous| tiePE | todate fine O PALL &. JOSEPH STADIA 4 | Fined Sesting 000.00 4 194,700.00 Certract Execution Bonds. Inurance % 55,500.00] 100% orm m0] 3 % © $8,900.00 3 5580.00 Deinded $07 tot faxed toutrg + . Corcrate materials for suspect wots under = . H 3 36.00R00 + + s A . upper unde 3 B,00R.00 % > it ~ 18 : $ . 40) Corceetes matertal teadartsers for bleacher seete + «000.00 $ = os - fa . ’ 2 Concestellnbo trenderis ert for bina cher seats + tapoone fs - |s + |t . $ . JAbmninern Berchea with backs material - 1,740 5 + 19020000 100% 10% | + [8 1320000] 13820000 3 13,820.00 ALenimin: benches with becks inislator + s0n00 + » |t - os . , o + . [Press Bowes. AA’ Bosthe. Chib Aves, 1900.00 + —1,600,08 | $ . 7@| Cortrect Exerution. Bonds. laurencs $ 1,500.00] 100% 19% | 1,800,006 | $ « |s vs0000 $ 17000 Reensivadoc of Work be be upatated in heures PE. 5 13,50Q00 % > |t > is - 5 . i . Concession Avent Foon $ 1,400.00 | 3 . ICortract Execution Bonds. Inesence $ —-Rsenoo] 100% too% | s Tanna | $ ~ | 70990 $ 780.00 eruninctes of Work te be vedated in ®.ture PE $ 6T.80000 $ > |s - 13 - , . $ . Adrain, Mainterance Offices & Stage 38,500.00 ed Ed . Contract Execution Bonta Insurance 3 aesa00F 100% oe 73 3850.00 | + + 7S ss50.00 + | (BOO Rermainaie of Work to be updated in Kaure PE $ © 4680.00 + - is ads . + 5 5 . eal 195.000,00 5 19,50n00 | $ - [Cortiadt Exscuton. Bonds. tnurence reSeR00] 100% a 19,500.00 | 5 + |¢ rea + Subcontractor Kone Ehevalot + 1 s0000 Fj . $ - FY - + . 4 . Tickehng and Gute Contre! 20,000.00 $ 2,000.00] 5 . [Cartract Executen Bonds. besurance $ 2:00000 | 100% wee 1$ 2200.00 | $ - os tooo $ Hie | Remazindar of Work be be updated m Raves PE $ — ve.c0n00 3 - |e [3 . $ . 3 . Budding Stecoge Aree 0.0008 & 2,000.00 | $ - Contsad Exeanon, Gores (nsuwance + 2,000.00] 100% om 1+ 2290n0 | $ > FF 2eoa > a Reemmaiendet of Wart fo be upstaded mn hare PE + 18,000.00 + - [5 + |s . % . s . Fink - Grading, Oraine ge, Finkd Mectangs $ - ‘ain [Move Surcharge Meters to Field. Grading, ma 200,000.00 + 190,000.00) 5 - Contre Executon Bonds, trsurance $ recondo| 100% oR | $ 58,000.00 } 3 . 26,000.00 $2,800.00 howe surcharge Adaterial to ted % 14000000] 00% 20% 100% | 8 Wid P0000 FS DHS OO] a hakoDO.E a 14.00.00 71a(6)] Grading, Cranage, Feld machingt $ 112,000.00 t - |s - . ’ - rf 7 2th _[(taew) Field Lights 6 HUD.00 + 03,000.20 Ts . 21eQ|Coruract Execution Bends. Insurance 4% 69,00000] 100% tom [3 wo.c00.00 | 5 + |s ieee $ OEE 21004] Fld bghting maternal purchase FEJ Stadern 3 740,000.00 | 100% wore | s rar.poane | $ + |S Diem 3 Tae 21D Fink! bgheing ental gon FEY Stren 3 80,000.00 + > |? 5 - + . $ 5 73_|end Pens, Geckutop & Pace $4,002.00 ' 6400.00 | $ . Content Execution Bonds. Inarence + $400.00] 100% 10% 15 8,400.00 | 5 - | Saoosa + ue 23)| Remainder of Wark to ba updabed 1 Kase PE + = 48,800.00 $ - os - |$ : a I rf . [G___JTERRENCE MARTIN FIELD + . Feundetona - Spread Foctng Type 92,500.00 $s — azto0o]s - Certrect Execunon Bonde, inustance 3 250.00} 100% om 3 928000 | 5 + [3% esate 3 aa Reeensirsdet of Work bo ba updated in haure PE $ = 83,28000 3 > [st - 1s + $ - % . Plow) Excevevon Backill & Grading $1$.00000 3 $ : Cortract Execution, Gongs Inaurance + 1150000] +00% tom | s 19,500.00 | 5 + [3 ¥4S0000 + tee |Remnaindes of Work to be updaled in huts PE. + 193,50000 $ - os 7 ot : , ° s . 85.00.00 $ 98,600.00] 5 . Contract Executon, Bonds, Insurmevce $ 0500.00] 100% 10% |S 0500.00 | + + |s 550000 + ee Corervte rastertale fot support walt under : - Is . : . + 9500.00 $ -|s oe . t . 40Kc})| Cormuvtes material trepdarrinars tor blsacher seats $ 13,500.00 + - Is $ . : . Concrete kates venduireers foc bleacher snats + 16.000.00 ‘ +45 + |s ‘ s - Abanirure benches material 900 I of benches 3 27.00K00 190% rors t + |$ — 22,00,00]5 —FT00K00 3 270000 $ © s0.Sen00 $ > ts - |s . $ . $ . 000.00 3 23,008001 $ . Certad Execution Bonds. Insence + 23,000.00] 100% 190% | $ z000.00 | 5 = |S Fkooo0 % 200.00 (B} Rermpinien ol With to be updaled in hare PE + 207,000,900 $ -|s . . Py . s - Mechanical. Electrical & Plumbing 96,000.09 $ 9,600.00 ] 3 * Rernsincet ot Work to be updated n hare PE $ 950000] 100% room |S 9500.00 | + - |S aacaao $ © 000 p] Remainder of Wort be be updated mn tute PE $ 85,s0000 3 -|s «|e . a . 3 . 770,000/00 $ 28000015 . [Contract Exvcuten Bonds. ineurance 3 2700000] Ho won 15 27.000,00 | $ + |S ieOo + 2.10000 Fiadd fepiting rantecal puschese TM Stadven 3 aep.ocene | too won | 20000.00 | $ + ja $ F200 Fiekd Baiting restate ton Th Stade $49,000.00 $ +15 :I3 : Fi ~ Fy 2 17$.p00.00 $ «TY, tone TS . Q]Cactract Execution. Bonds, Inaemnce 3 a7.50Q.00} 100% toon | $ 17,500.00 | $ « [5 Ehaeaeo $ 1.rt0g0 Of] Remaincier of Work to be updated Kure PE $187,500.00 $ - [s - |s : $ . 1 . lo I CRUCIAM CHRISTMAS CARNIVAL VRLAGE 3 ° 3 + . $ . ed . 7.70000 | 100% tom 15 y.r0000 | $ + [3 rRe000 3 P00 9.00.00 fy - ds + |¢ . $ . 7 . 3 = aa. FS - 19,2000 | 100% rox 4 19,900.00 | $ + |% 1is0R00 $ "530,00 +rou9 $ . - |s - $ . . . + eon | s . 2500 | ON oe 13 9500.00 | 5 + 43 50009 % 00 85.500.00 3 . 5 » 1s bd 4 - % . $ 93,800.00 13 . Jason | 100% Te 3.80000 | + > |% zso000 $ 434000 301.60.00 4 - ft + 1s . % . $ . $ = esonee | + * 9500.00] 100% tom | 9500.00 | 5 » ps Bso0p0 $ W000 83.50000 + - [5 - fa , . rf 5 $ 10,000.00] s . yaocano | 100% rooms 10,000.00 | $ - [3 Maooa00 $ 1.00000 0,000.00 + - + . 3 . z — SCHEDULES OF CHANGE ORDERS APPROVED CHANGE OROER ten Hs Decree a bee SomP oe ton = s5 2 2 2) ti] a Rone 2, ANALYSIS OF ADJUSTEO CONTRACT AMOUNT TO DATE A ‘Origina] contact amount 3 4.190,000.00 a Pan Adetons $ : S Lem Deoverions 3 : D. Adpisted contract amount to date 2 4,300,090.00 2. ANALY S18 OF WORK PERFORMED: 1 Value of argnat contract wack pactermed te date eColen B Front} (0+ 94d second page # appicedtel 2 1,660. 200.00 2 Extra vert performed to date a Total valve of wort perlecmed to dale 4 1,640, 200.00 4 ‘Aas Materials sored of clse of ths perked (Aaucted detaled schedule) 2 : s Lease Amount retained 3 166,020.00 s Nol arround carted on contract wort i date Li 1,494, 180.00 La Otier deductions a Loss: Arnaunt of previews payments a 4.319,430.00 & BALANCE DUE THIS PAYMENT A 174,790.00 4, CERTIFICATION OF CONTRACTOR According to the best of my Knowtedge and tebel. bcorify that all ama and amourés shown on fhe tate of his Porosical Evtrnale ore comect, tal ofl work has bean performed andlor erate nal cupped In B accordance wath the Terns and Condtnns (OF THE VIRGIN ISLANDS: ane GEC, tLe end wriers ender Quy auorined deviations. sherabons, antror 7 np ea true ond i and ha A Pee Poredicad Estimate, and that no pact of tha “Balance Dus Ths Payment’ hax been received. A GEC.LE Lia = (Convector) i dabo B., Weundl wuiz073 ccd Tate: Maraging Norber (Detei & oF TATIVE mm Ne, s oe Re perodot = 1122/2022 Ousegh Digs fnchmive: that In the bow of ry a tus ond by noe cst) manecial supeded by th . Dial aD work ondéot matartel nchided fn this Petiogscal Exbnote No. 2 hee fapeerantetive of atshirtt and Mate has been performed aniver supphed in hl T Deawngs. plins snd specifications. endiet duly adevetors bedier sdéitene, of af which Hy OF THE VIRGIN ISLANOS, ‘ ove 3/17/2023 La A Gabel a Aabe Je J WK 03/14/2023 2 Date ‘Calvert Vinke, Commisalonat of Spots, Parks snd Recreation Tawana Albany Nicholas renner ae = Eimooeesase pae 03-14-2023 Tavans Nichole, Coat #2 21/2023 = ow _A/21/2023 U&W PO Box 1720 Kingshill, USVI, 00851 Ph: 340-778-0012 Fax: 340-778-2545 email: klustig@gecusvi.com GEC, LLC (Paul E.Joseph Stadium) P.O. Box 1656, Kingshill St. Croix, V1 00851 CUSTOMER #: 0000522 Customer PO #: Item # Description 01 B. PAUL E. JOSEPH STADIUM for PEJ Stadium 02 4 (iie} Aluminum Benches with Backs material 1740 If 03 C. TERRANCE MARTIN FIELD 04 4 (iie} Aluminum Benches material 900 If of benches DATE 11/07/2022 INVOICE NO. 14545 ATTENTION: Ship Vis: None Ordered Price Each 0.00 0.00 1,740.00 80.00 900.00 30.00 0.00 0.00 DUE THIS INVOICE THANK YOU Amount 0.00 139,200.00 27,000.00 0.00 $166,200.00 Aluminum Stadium Seating provides greater spectator comfort and ; . durability. Sturdistee! offers el-aluminum sealing that installs quickly, easily, and ne eer yea economically ln permanent grandstands or bleachers. Untike wood, aluminum oat Soi | H , Never needs painting and wil! not splinter, crack, or absorb splited liquids. Punt aT dae yee B bee hee pees Easy and fast to clean, water from hosing or rain evaporates quickly. fete f abot abst f carn f ieesald | scoaaelal | F Three different seating modets are avaliable for installation in new et ea ag (a Goy Se, ay Or replacement facilities on steai or concrete. Anodized gaat eS i, planks are avaliable in 3 widths: 2 x 10", 2° x 44°, and 2° x 12°. Footboards } ere mill finished and are avaiable in 8, 10", 11", 12” and 19° widths. Matching riser boards and optional foctboards, backrests, and armrests are also \ available, For even greater seating comfort order contoured backrests. {AH Backrests require a minimum 30" tread dapih) - 7 ek Maintenance departments appreciate Sturdisteot's standard clear anodized " y rs finish matching the Aluminum Association Architecturat Class {I specifications ’ eg (AAG22A31 4 mil. minimum thickness). All plank surfaces are siffated except * i for @ 2° seotion for ease in numbering, = ieee Sturdisiee! aluminum seating Is designed for flexibility and ease of Installation nia VIP etadium chair, since only one universal fastening clip is required for hold-down and splices, Powder coat finish. Common dimensions of mating parte also facilitate the use of different seating fia (33” Tread depth and footboard combinations to meat your Individual needs. required.) Are your existing stadium supports stl in good condition, while wood seating { has splintered and degraded? Sturdisteet fs @ leader in aluminum replacements at INSET: Cheyenne for existing wood seats, footboards, and riser boards, =| Frontier Days Rodeo, Whatever your needs, Sturdistee! aluminum seating stands in a class by Itself ial Cheynne, Wyoming. for quality, durability, appearance, and low-cost maintenance. & + Benoh seat, powder coated dish bck armrest, (llinole State Bench seats with adhesive numbers, Northern ittinots Falrgrounde, Springfield, IL. (20 Irread depth “tear University, DeKalb, IL. DECK OPTIONS 13-314" i ik Full Deck Full Deck With Backs BRACKET GPTYONS This type bench with no armrests at PEJ Stadium - anodized finish. Add $25/If for a powder coat paint on backs = $60,800 ALUMINUM STADIUM Alwminam Stadlum Seating provides greater spectator comfort and durability. Sturdisteel offers al-aluminum seating that installs quickly, easily, and ! ®conomically In permanent grandstands or bleachers. Untike wood, aluminum ee - t h } ' q never needs painting and will not splinter, crack, or absorb spied liquide. f pi fea an psoas fa fi a | : ‘ Easy and fast to clean, water from hosing or rain evaporates quickly fr) — - # Three different seating aré6 avallabia for installation in new $214 lott bas erate: | hcl " Construction or replacement On steel or concrete. Anodized seat Siac, ee el : | Planks are available in 3 widths: P™x 104 2° x 11", and 2°x 12". Footboards fit / re ‘eee ie are mill finished and are avaiable in 8°, 10", 11", 12” and 13" widths. Matching fier boarda and optional footboard, backresta, and amirests are also avaliable, For even greater seating comfort order contoured backreste. {All Dachrests require 8 minimum 30" tread dopth} Maintenance departments appreciate Sturdisteel’s slandard clear anodized finish matching the Aluminum Association Architectural Clase Il specifications {AAC22A91 4 mil. minimum thickness). All plank surfaces are striated except for a 2° section for ease in numbering, Sturdistee! aluminum Sealing is designed for flexiblity and ease of installation since onty one universal fastening clip Is required for hold-down and splices. Common dimensions of mating paris also facilitate the use ot differant seating and footboard combinations to mael your Individual needs. Are your existing stadium supports sill in good condition, white wood seating has splintered and dagratied? Sturdistee! is a leader in aluminum replacements tor existing wood seats, footboards, and riser boards. Whatever your needs, Sturdistee! aluminum seating stands in a class by itself for quality, durability, appearence, and low-cost maintenance. id Bench seat, powder coated dish backs, armrest, tilinols State Falrgrounde, Springfield, IL. (30” Tread depth required.) DECK OPTIONS 2-1 '-0 2-6 | This type bench with no backs or armrests Closed Deck _|jat Terrence Martin or Interlocking _|Field - anodized finish. Full Deck ~ Full Deck With Backs BRACKET OPTIONS