VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

2025-10-15 – Knud Hansen DHS B&E Demolition Set

Collection
Research & Technical Reports
Sub-shelf
dpnr.vi.gov
Kind
Research Report
Date
2025-10-15
Topics
Disaster Recovery
Pages
11
Text
Native Text

ATLANTIC OCEAN CARIBBEAN SEA THE ISLAND OF ST. THOMAS PROJECT LOCATION OWNER ARCHITECT Government of the United States, Virgin Islands HONORABLE ALBERT BRYAN, JR. GOVERNOR HONORABLE TREGENZA A. ROACH, ESQ LIEUTENANT GOVERNOR Government House St. Thomas 5047 (21-22) Kongens Gade, St. Thomas, VI 00802-6487 PHONE: (340) 774-0001 EMAIL: albert.bryan@go.vi.gov Office of Disaster Recovery Adrienne L. Williams-Octalien DIRECTOR V.I Public Finance Authority Office of Disaster Recovery 14A & 14C Strand Street Frederiksted, VI 00840 PHONE: (340) 202-1221 EMAIL: adrienne.williams@vi.gov Springline Architects, LLC Jerry Traino, AIA PRINCIPAL Gilbert Laban, RA PRINCIPAL 9713 Estate Thomas Building 1, Suite 200 St. Thomas, USVI 00802 PHONE: (321) 636-0274 EMAIL: gilbert@springlinearchitects.com jerry.traino@novusarchitects.com MEP/FP ENGINEER STRUCTURAL ENGINEER CIVIL ENGINEER Harris Civil Engineers, LLC Neil Wolfe, PE PROJECT MANAGER 1200 Hillcrest Street, Suite 200 Orlando, FL 32803 PHONE: (407) 629-4777 EMAIL: NeilW@harriscivilengineers.com SURVEYOR TLC Engineering Solutions Jim C. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpnr.vi.gov/wp-content/uploads/2026/06/2025-10-15-Knud-Hansen-DHS-BE-Demolition-Set.pdf

SHA-256 247bd292142e43601e747a9cd03be86e803d09da0749d1964133627159e4d4bc

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-247bd292142e

Document text

ATLANTIC OCEAN CARIBBEAN SEA THE ISLAND OF ST. THOMAS PROJECT LOCATION OWNER ARCHITECT Government of the United States, Virgin Islands HONORABLE ALBERT BRYAN, JR. GOVERNOR HONORABLE TREGENZA A. ROACH, ESQ LIEUTENANT GOVERNOR Government House St. Thomas 5047 (21-22) Kongens Gade, St. Thomas, VI 00802-6487 PHONE: (340) 774-0001 EMAIL: albert.bryan@go.vi.gov Office of Disaster Recovery Adrienne L. Williams-Octalien DIRECTOR V.I Public Finance Authority Office of Disaster Recovery 14A & 14C Strand Street Frederiksted, VI 00840 PHONE: (340) 202-1221 EMAIL: adrienne.williams@vi.gov Springline Architects, LLC Jerry Traino, AIA PRINCIPAL Gilbert Laban, RA PRINCIPAL 9713 Estate Thomas Building 1, Suite 200 St. Thomas, USVI 00802 PHONE: (321) 636-0274 EMAIL: gilbert@springlinearchitects.com jerry.traino@novusarchitects.com MEP/FP ENGINEER STRUCTURAL ENGINEER CIVIL ENGINEER Harris Civil Engineers, LLC Neil Wolfe, PE PROJECT MANAGER 1200 Hillcrest Street, Suite 200 Orlando, FL 32803 PHONE: (407) 629-4777 EMAIL: NeilW@harriscivilengineers.com SURVEYOR TLC Engineering Solutions Jim C. Mullen, PE, LEED AP PRINCIPAL Stephen Cotton, PE 7370 Cabot Court, Suite 103 Melbourne, FL 32940 PHONE: (321) 877-4260 EMAIL: jim.mullen@tlc-eng.com TLC Engineering Solutions Joel Figueroa-Vallines, PE SENIOR ASSOCIATE 7370 Cabot Court, Suite 103 Melbourne, FL 32940 PHONE: (321) 877-4231 EMAIL: joel.figueroa@tlc-eng.com The Green Piece Engineering + Environment Jeffrey Bateman, PE, PLS PRINCIPAL 5001 Chandlers Wharf, Suite 12 Christiansted, St. Croix, VI 00820 PHONE: (340) 778-7474 EMAIL: jeff@thegreenpiece.us Department of Public Works Derek Gabriel COMMISSIONER Jermaine McCleane, RA DISTRICT ENGINEERING 8244 Subbase St. Thomas, VI 00802 PHONE: (340) 776-4844 EMAIL: jermaine.mccleane@dpw.vi.gov Department of Human Services Averil George COMMISSIONER Sean Georges DEPUTY COMMISSIONER 3012 Golden Rock Christiansted, St. Croix, VI 00820 PHONE: (340) 774-0930 EMAIL: sean.georges@dhs.vi.gov Jacobs Christopher Cangello SENIOR PROJECT MANAGER S Warren Street Syracuse, NY PHONE: (315) 209-9713 EMAIL: christopher.cangello@jacobs.com REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs PROJECT TEAM PROJECT MAP AGENCIES ODR TASK ORDER NUMBER SHEET INDEX ODR TASK ORDER #: G000 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E COVER SHEET 60% DEMOLITION DRAWINGS 470-23-49 60% DEMOLITION DRAWINGS 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E 010-9-101918 010-9-101918 10/15/2025 CR # SHEET # SHEET NAME GENERAL G000 COVER SHEET G100 ABBREVIATIONS, LEGENDS, KEYNOTES ARCHITECTURAL D001 DEMOLITION SITE PLAN D005 DEMOLITION REFERENCE PHOTOS D006 DEMOLITION REFERENCE PHOTOS D100 DEMOLITION BASEMENT PLAN D101 DEMOLITION 1ST FLOOR PLAN D102 DEMOLITION 2ND FLOOR PLAN D109 DEMOLITION ROOF PLAN D201 DEMOLITION ELEVATIONS D301 DEMOLITION SECTION SITE No. Description Date X X X REFERENCE SYMBOL LEGEND ROOM NAME AND NUMBER PLAN OR SECTION DETAIL A101 A1 DASHED LINE AROUND AREA DETAILED DRAWING NUMBER SHEET NUMBER WHERE DETAIL IS DRAWN BUILDING, WALL, OR CASEWORK SECTION A101 A1 DRAWING NUMBER SHEET NUMBER WHERE SECTION IS DRAWN INTERIOR ELEVATION DRAWING NUMBER SHEET NUMBER WHERE ELEVATION IS DRAWN LOBBY 100 A1 A101 100 SF ROOM NAME ROOM NUMBER ROOM AREA EXTERIOR ELEVATION A101 A1 DRAWING NUMBER SHEET NUMBER WHERE ELEVATION IS DRAWN DOOR TAG ROOM WHERE DOOR IS LOCATED DOOR ID - REFER TO DOOR SCHEDULE STOREFRONT TAG DRAWING NUMBER SEE A600 SERIES FOR STOREFRONT ELEVATIONS WALL OR PARTITION TAG A1 REFER TO A001 FOR PARTITION DETAILS WINDOW TAG A1 REFER TO A601 FOR WINDOW ELEVATIONS 101A 1 ABBREVIATIONS AB AIR BARRIER AB ANCHOR BOLT ABV ABOVE ACT ACOUSTICAL CEILING TILE ADD ADDITIONAL, ADDENDUM ADJ ADJUSTABLE, ADJACENT AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AHJ AUTHORITY HAVING JURISDICTION AHU AIR HANDLING UNIT ALT ALTERNATE, ALTERNATIVE ALUM ALUMINUM ANOD ANODIZED ARCH ARCHITECTURAL, ARCHITECT ATS AUTOMATIC TRANSFER SWITCH AVG AVERAGE B&S BACKER ROD AND SEALANT BAC BUILDING AUTOMATION AND CONTROLS BATTS BATT INSULATION BC BACK OF CURB BD BOARD BIT BITUMINOUS BLDG BUILDING BLKG BLOCKING BM BEAM BOD BASIS OF DESIGN BOS BOTTOM OF STEEL BOT BOTTOM BRG BEARING BRK BRICK BUR BUILT-UP ROOFING C/C CENTER TO CENTER CAB CABINET CC CONTRACTOR PROVIDED / CONTRACTOR INSTALLED CIP CAST IN PLACE CONCRETE CJ CONTROL JOINT CL CENTERLINE CLG CEILING CLKG CAULKING CLO CLOSET CLR CLEAR CMU CONCRETE MASONRY UNIT CO CLEANOUT, CASED OPENING COL COLUMN CONC CONCRETE CONST CONSTRUCTION CONT CONTINUOUS, CONTROL CTR CENTER CW COLD WATER D DEPTH DBL DOUBLE DEMO DEMOLISH, DEMOLITION DET DETAIL DF DRINKING FOUNTAIN DHW DOMESTIC HOT WATER DIA DIAMETER DIM DIMENSION DIV DIVISION, DIVIDE DN DOWN DOAS DEDICATED OUTDOOR AIR SYSTEM DP DRAIN PIPE, DAMPPROOF DS DOWNSPOUT DWG DRAWING DWR DRAWER EA EACH EF EACH FACE EF EXHAUST FAN EFS EXTERIOR FINISH SYSTEM EIFS EXTERIOR INSULATION AND FINISH SYSTEM EJ EXPANSION JOINT EL EACH LAYER ELEC ELECTRIC SPACE, ELECTRICAL ELEV ELEVATOR, ELEVATION EMER EMERGENCY ENCL ENCLOSURE ENG ENGINEER, ENGINEERED EP ELECTRICAL PANEL EPS EXPANDED POLYSTYRENE INSULATION EQ EQUAL EQUIP EQUIPMENT ES EACH SIDE ETR EXISTING TO REMAIN EW EACH WAY EWC ELECTRIC WATER COOLER EWH ELECTRIC WATER HEATER EXCAV EXCAVATE EXH EXHAUST EXIST EXISTING EXP EXPANSION, EXPOSED EXT EXTERIOR FA FIRE ALARM FAAP FIRE ALARM ANNUCIATOR PANEL FAB FABRICATE FACP FIRE ALARM CONTROL PANEL FC FIBER CEMENT FD FLOOR DRAIN FDC FIRE DEPARTMENT CONNECTION FDTN FOUNDATION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FF FINISHED FLOOR, FACTORY FINISH FF&E FIXTURES, FURNISHINGS, & EQUIPMENT FFE FINISHED FLOOR ELEVATION FIN FINISH, FINISHED FLR FLOOR FM FIRE MARSHAL FO FINISHED OPENING FOC FACE OF CONCRETE FOF FACE OF FINISH FOM FACE OF MASONRY FOS FACE OF STUD FRT FIRE RETARDANT TREATED FS FLOOR SINK FSTN FASTEN, FASTENER FT FEET FTG FOOTING FV FIELD VERIFY (SEE ALSO: VIF) GALV GALVANIZED GB GRAB BAR GC GENERAL CONTRACTOR GEN GENERATOR GFCI GROUND FAULT CIRCUIT INTERRUPTED GFI GROUND FAULT INTERRUPTED GL GLAZING GND GROUND GOVT GOVERNMENT GR GUARD RAIL GRD GRADE GRTG GRATING GT GROUT GVL GRAVEL GWB GYPSUM WALL BOARD GYP GYPSUM H HIGH HAZMAT HAZARDOUS MATERIAL HB HOSE BIB HC HANDICAPPED ACCESSIBLE HCWD HOLLOW CORE WOOD HDR HEADER HM HOLLOW METAL HORIZ HORIZONTAL HR HANDRAIL HSS HOLLOW STRUCTURAL SECTION HT HEIGHT HVAC HEATING VENTILATION AIR CONDITIONING HW HARDWARE HWS HOT WATER SUPPLY ID INTERIOR DIAMETER IGU INSULATED GLASS UNIT INS INSULATION INSUL INSULATION INT INTERIOR, INTERNAL IR IMPACT RESISTANT JBOX JUNCTION BOX JF JOINT FILLER JS JOINT SEALANT JST JOIST JT JOINT KD KNOCK-DOWN, KILN-DRIED L LENGTH, LEFT LAV LAVATORY LH LEFT HAND LNDG LANDING LNTL LINTEL LOD LIMITS OF DISTURBANCE LP LIGHTING PANEL LSL LAMINATED STRAND LUMBER LTG LIGHTING LVL LEVEL, LAMINATED VENEER LUMBER LVR LOUVER MATL MATERIAL MAX MAXIMUM MDF MEDIUM DENSITY FIBERBOARD MECH MECHANICAL MED MEDIUM MEMB MEMBRANE MEZZ MEZZANINE MFR MANUFACTURE, MANUFACTURER MH MANHOLE MIN MINIMUM MIR MIRROR MISC MISCELLANEOUS MO MASONRY OPENING MOV MOVABLE MR MOISTURE RESISTANT MS MOP SINK MTD MOUNTED MTL METAL MUA MAKE UP AIR NIC NOT IN CONTRACT NIS NOT IN SCOPE NO NUMBER NOM NOMINAL NRC NOISE REDUCTION COEFFICIENT NTS NOT TO SCALE OA OVERALL, OUTSIDE AIR OC ON CENTER OD OUTSIDE DIAMETER OF OUTSIDE FACE OH OVERHEAD OP OPERABLE OPNG OPENING OPP OPPOSITE, OPPOSITE HAND ORD OVERFLOW ROOF DRAIN OSB ORIENTED STRAND BOARD PAF POWDER ACTUATED FASTENER PEMB METAL BUILDING MANUFACTURER PL PLASTIC LAMINATE PLBG PLUMBING PLTF PLATFORM PLYWD PLYWOOD PME PLUMBING, MECHANICAL, AND ELECTRICAL PNL PANEL POTW POTABLE WATER PR PAIR PREFAB PREFABRICATED PREFIN PREFINISHED PROP PROPERTY LINE PSL PARALLEL STRAND LUMBER PT PAINT PT PRESSURE TREATED PTD PAINTED PTN PARTITION PVC POLYVINYL CHLORIDE QTR QUARTER QTY QUANTITY R RISER, RIGHT R/I ROUGH-IN RA RETURN AIR RAD RADIUS RCP REFLECTED CEILING PLAN RD ROOF DRAIN RDL ROOF DRAIN LEADER REBAR REINFORCING STEEL BAR RECP RECEPTACLE REF REFERENCE REFURB REFURBISH REINF REINFORCE REINFORCING REINFORCEMENT REM REMOVE, REMOVABLE REQD REQUIRED RET RETAINING, RETURN REV REVERSE, REVISION RFG ROOFING RGH ROUGH RIG RIGID RM ROOM RND ROUND RO ROUGH OPENING ROW RIGHT OF WAY RS ROUGH SAWN RTD RATED SA SELF-ADHERED, SUPPLY AIR SAN SANITARY SB SPLASH BLOCK SBS STYRENE-BUTADIENE-STYRENE INSULATION SCH, SCHED SCHEDULE SCR SCREEN SCUP SCUPPER SCWD SOLID CORE WOOD SECT SECTION SF SQUARE FOOT / SQUARE FEET SFGL SAFETY GLASS SHT SHEET SHTG SHEATHING SHWR SHOWER SIM SIMILAR SIP STRUCTURAL INSULATED PANEL SK SINK SLC SELF-LEVELING COMPOUND SM SHEET METAL SNT SEALANT SOG SLAB ON GRADE SP STAND PIPE, SOUNDPROOF SPEC SPECIFICATION, SPECIFIED SPRNK SPRINKLER SQ SQUARE SS STAINLESS STEEL STANDING SEAM SOLID SURFACE SSK SERVICE SINK STC SOUND TRANSMISSION CLASS STD STANDARD STL STEEL STN STATION STR STAIR STRUCT STRUCTURAL SUSP SUSPEND, SUSPENDED SW STORM WATER, SHEAR WALL SYP SOUTHERN YELLOW PINE T TREAD T&B TOP AND BOTTOM T&G TONGUE AND GROOVE TD TRENCH DRAIN TEMP TEMPERATURE, TEMPORARY TGL TEMPERED GLASS THK THICK TLT TOILET TME TO MATCH EXISTING TOC TOP OF CURB TOS TOP OF SLAB, TOP OF STEEL TOW TOP OF WALL TP TOP OF PAVEMENT TPTN TOILET PARTITION TRANS TRANSFORMER TRTD TREATED TSTAT THERMOSTAT TWF THRU WALL FLASHING TYP TYPICAL UNFIN UNFINISHED UNO UNLESS NOTED OTHERWISE UR URINAL VAV VARIABLE AIR VOLUME VB VAPOR BARRIER VERT VERTICAL VIF VERIFY IN FIELD (SEE ALSO: FV) VP VENT PIPE VR VAPOR RETARDER VRF VARIABLE REFRIGERANT FLOW VTR VENT THROUGH ROOF W WIDE, WIDTH W/ WITH W/O WITHOUT WC WATER CLOSET WD WOOD WG WIRE GLASS WH WATER HEATER, WALL HYDRANT WIN WINDOW WS WEATHER STRIPPING WWM WELDED WIRE MESH (FABRIC) XPS EXTRUDED POLYSTYRENE INSULATION EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER G100 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E ABBREVIATIONS, LEGENDS, KEYNOTES 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 # KEYNOTES - OVERALL DEMOLITION # DESCRIPTION 01 DEMOLISH EXISTING BUILDING TO PROVIDED EXTENTS INCLUDING ROOF STRUCTURE, EXTERIOR AND INTERIOR WALLS, WINDOWS, DOORS, FLOORS AND FLOOR SLABS, ALL BUILDING UTILITIES: PIPING, DUCTWORK, ELECTRICAL, FIXTURES AND DEBRIS DOWN TO SOIL (TYPICAL) 02 DEMOLISH EXISTING SIDEWALKS, STAIRS, RAMPS, AND RAILINGS TO GRADE 03 DEMOLISH EXISTING RETAINING WALL 04 DEMOLISH EXISTING ASPHALT PAVEMENT 05 DEMOLISH EXISTING GENERATOR AND ENCLOSURE TO GRADE 06 DEMOLISH EXISTING CISTERN 07 DEMOLISH EXISTING ELEVATOR SHAFT 08 DEMOLISH EXISTING VEGETATION AND TREES AS SHOWN 09 DEMOLISH EXISTING METAL STAIR STRUCTURE TO GRADE 10 DEMOLISH EXISTING AIR UNIT AND CONCRETE SLAB TO GRADE 11 MAINTAIN AND PROTECT EXISTING TREE 12 MAINTAIN HISTORIC WALL 13 MAINTAIN HISTORIC STRUCTURE 14 MAINTAIN EXISTING STRUCTURE 15 MAINTAIN EXISTING RETAINING WALL 16 DEMOLISH ALL EXISTING PERIMETER FENCING AND GATES COMPLETE. 17 DEMOLISH EXISTING POWER POLE - SEE CIVIL 20 SECURE SITE PRIOR TO ANY DEMOLITION ACTIVITIES WITH 8' TALL CHAIN LINK FENCING WITH INTEGRATED WIND AND VISUAL BARRIER. 21 PROVIDE NEW ENTRY DRIVEWAY CUT 23 RELOCATE EXISTING PLAYGROUND EQUIPMENT - CONTRACTOR TO COORDINATE WITH OWNER No. Description Date DN X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES NORTH D201 A1 3-STORY DOH OLD MENTAL HEALTH BUILDING PREVIOUSLY DEMOLISHED, SHOWN HERE FOR CONTEXT ONLY DOH WIC BUILDING TO REMAIN 3-STORY DHS KNUD HANSEN BUILDING TO BE DEMOLISHED AC AC AC AC AC AC AC AC AC AC HOSPITAL GROUND ROAD OLD HOSPITAL ROAD HOSPITAL GROUND ROAD AC AC 4-STORY DOH KNUD HANSEN TOWER BUILDING UNDER SEPARATE CONTRACT DOH JOHN S. MOOREHEAD COMPLEX TO REMAIN D201 E2 D201 B1 D201 C1 D201 E1 11 04 12 13 21 23 14 15 01 01 05 05 02 02 03 03 11 11 11 11 11 12 13 20 20 20 02 02 B1 D301 08 1-STORY HISTORIC BUILDING TO REMAIN 1-STORY HISTORIC BUILDING TO REMAIN BOUNDARY FOR ASPHALT DEMOLITION 09 10 10 10 CISTERN OUTFALL 04 04 04 08 08 08 11 11 11 REMOVE GATE & WALL WEST OF GATE PROTECT STONE WALL 16 16 16 SOME FENCING TO BE DEMOLISHED IN THIS AREA IS ATTACHED TO THE TREES REMOVE CONCRETE MONUMENT 17 17 17 10 02 10 17 20 20 PHASE 1 PHASE 2 KEYPLAN EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D001 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION SITE PLAN 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 3/64" = 1'-0" D001 SITE PLAN - DEMOLITION A1 # KEYNOTES - DEMOLITION # DESCRIPTION 01 DEMOLISH EXISTING BUILDING TO PROVIDED EXTENTS INCLUDING ROOF STRUCTURE, EXTERIOR AND INTERIOR WALLS, WINDOWS, DOORS, FLOORS AND FLOOR SLABS, ALL BUILDING UTILITIES: PIPING, DUCTWORK, ELECTRICAL, FIXTURES AND DEBRIS DOWN TO SOIL (TYPICAL) 02 DEMOLISH EXISTING SIDEWALKS, STAIRS, RAMPS, AND RAILINGS TO GRADE 03 DEMOLISH EXISTING RETAINING WALL 04 DEMOLISH EXISTING ASPHALT PAVEMENT 05 DEMOLISH EXISTING GENERATOR AND ENCLOSURE TO GRADE 08 DEMOLISH EXISTING VEGETATION AND TREES AS SHOWN 09 DEMOLISH EXISTING METAL STAIR STRUCTURE TO GRADE 10 DEMOLISH EXISTING AIR UNIT AND CONCRETE SLAB TO GRADE 11 MAINTAIN AND PROTECT EXISTING TREE 12 MAINTAIN HISTORIC WALL 13 MAINTAIN HISTORIC STRUCTURE 14 MAINTAIN EXISTING STRUCTURE 15 MAINTAIN EXISTING RETAINING WALL 16 DEMOLISH ALL EXISTING PERIMETER FENCING AND GATES COMPLETE. 17 DEMOLISH EXISTING POWER POLE - SEE CIVIL 20 SECURE SITE PRIOR TO ANY DEMOLITION ACTIVITIES WITH 8' TALL CHAIN LINK FENCING WITH INTEGRATED WIND AND VISUAL BARRIER. 21 PROVIDE NEW ENTRY DRIVEWAY CUT 23 RELOCATE EXISTING PLAYGROUND EQUIPMENT - CONTRACTOR TO COORDINATE WITH OWNER No. Description Date X X X KEYPLAN 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D005 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION REFERENCE PHOTOS 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 01 01 13 DHS KNUD HANSEN BUILDING - NORTH FACADE (B) DHS KNUD HANSEN BUILDING - NORTH FACADE (A) DHS KNUD HANSEN BUILDING - EAST FACADE (C) DHS KNUD HANSEN BUILDING - EAST FACADE (D) 01 13 DHS KNUD HANSEN BUILDING - EAST FACADE AERIAL DHS KNUD HANSEN BUILDING - SOUTH FACADE (I) DHS KNUD HANSEN BUILDING - SOUTH FACADE (H) DHS KNUD HANSEN BUILDING - SOUTH FACADE (G) DHS KNUD HANSEN BUILDING - EAST FACADE (E) DHS KNUD HANSEN BUILDING - WEST FACADE AERIAL DHS KNUD HANSEN BUILDING - WEST FACADE (J) 01 01 01 01 13 01 01 01 01 02 02 02 02 B A C D E G H I J K DHS KNUD HANSEN BUILDING - HEADSTART PLAYGROUND (D) 13 01 # KEYNOTES - DEMOLITION # DESCRIPTION 01 DEMOLISH EXISTING BUILDING TO PROVIDED EXTENTS INCLUDING ROOF STRUCTURE, EXTERIOR AND INTERIOR WALLS, WINDOWS, DOORS, FLOORS AND FLOOR SLABS, ALL BUILDING UTILITIES: PIPING, DUCTWORK, ELECTRICAL, FIXTURES AND DEBRIS DOWN TO SOIL (TYPICAL) 02 DEMOLISH EXISTING SIDEWALKS, STAIRS, RAMPS, AND RAILINGS TO GRADE 13 MAINTAIN HISTORIC STRUCTURE No. Description Date X X X KEYPLAN 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D006 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION REFERENCE PHOTOS 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR DHS KNUD HANSEN BUILDING - INTERIOR # KEYNOTES - DEMOLITION # DESCRIPTION No. Description Date DN DN DN UP UP X X X NORTH KEYPLAN D201 A1 D201 B1 D201 C1 DHS KNUD HANSEN BASEMENT TO BE DEMOLISHED 23,547 SQFT CISTERN ACCESS BLDG ENTRY BLDG ENTRY BLDG ENTRY BLDG ENTRY BLDG ENTRY LIFT LIFT W.C. W.C. W.C. W.C. W.C. W.C. 23 05 02 11 11 11 02 02 06 01 30' - 3" 94' - 8" 106' - 11" 26' - 0" 257' - 10" 45' - 10" 77' - 1" 37' - 6" 30' - 6 1/2" 23' - 9" 44' - 11 1/2" 54' - 6" 65' - 9" 103' - 4 1/2" 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D100 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION BASEMENT PLAN 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 1/16" = 1'-0" D100 BASEMENT FLOOR PLAN - DEMOLITION A1 # KEYNOTES - DEMOLITION # DESCRIPTION 01 DEMOLISH EXISTING BUILDING TO PROVIDED EXTENTS INCLUDING ROOF STRUCTURE, EXTERIOR AND INTERIOR WALLS, WINDOWS, DOORS, FLOORS AND FLOOR SLABS, ALL BUILDING UTILITIES: PIPING, DUCTWORK, ELECTRICAL, FIXTURES AND DEBRIS DOWN TO SOIL (TYPICAL) 02 DEMOLISH EXISTING SIDEWALKS, STAIRS, RAMPS, AND RAILINGS TO GRADE 05 DEMOLISH EXISTING GENERATOR AND ENCLOSURE TO GRADE 06 DEMOLISH EXISTING CISTERN 11 MAINTAIN AND PROTECT EXISTING TREE 23 RELOCATE EXISTING PLAYGROUND EQUIPMENT - CONTRACTOR TO COORDINATE WITH OWNER No. Description Date UP DN UP UP X X X NORTH LIFT DHS KNUD HANSEN 1ST FLOOR TO BE DEMOLISHED 33,606 SQFT D201 A1 GENERATOR/STORAGE BUILDING TO BE DEMOLISHED 792 SQFT HOSPITAL GROUND ROAD LIFT ROOF BLDG ENTRY BLDG ENTRY BLDG ENTRY BLDG ENTRY W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. 30' - 3" 94' - 8" 160' - 8" 77' - 1" D201 E2 D201 B1 D201 E1 04 21 23 05 02 03 03 11 11 12 11 07 07 01 01 08 2-STORY DOH OLD MENTAL HEALTH BUILDING TO BE DEMOLISHED UNDER A SEPARATE CONTRACT 4-STORY DOH KNUD HANSEN TOWER BUILDING TO BE DEMOLISHED UNDER A SEPARATE CONTRACT 37' - 6" 54' - 5" 44' - 9 1/2" 54' - 6" 65' - 9" 101' - 8" 36' - 0" 44' - 6" 80' - 0" KEYPLAN 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D101 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION 1ST FLOOR PLAN 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 1/16" = 1'-0" D101 1ST FLOOR PLAN - DEMOLITION A1 # KEYNOTES - DEMOLITION # DESCRIPTION 01 DEMOLISH EXISTING BUILDING TO PROVIDED EXTENTS INCLUDING ROOF STRUCTURE, EXTERIOR AND INTERIOR WALLS, WINDOWS, DOORS, FLOORS AND FLOOR SLABS, ALL BUILDING UTILITIES: PIPING, DUCTWORK, ELECTRICAL, FIXTURES AND DEBRIS DOWN TO SOIL (TYPICAL) 02 DEMOLISH EXISTING SIDEWALKS, STAIRS, RAMPS, AND RAILINGS TO GRADE 03 DEMOLISH EXISTING RETAINING WALL 04 DEMOLISH EXISTING ASPHALT PAVEMENT 05 DEMOLISH EXISTING GENERATOR AND ENCLOSURE TO GRADE 07 DEMOLISH EXISTING ELEVATOR SHAFT 08 DEMOLISH EXISTING VEGETATION AND TREES AS SHOWN 11 MAINTAIN AND PROTECT EXISTING TREE 12 MAINTAIN HISTORIC WALL 21 PROVIDE NEW ENTRY DRIVEWAY CUT 23 RELOCATE EXISTING PLAYGROUND EQUIPMENT - CONTRACTOR TO COORDINATE WITH OWNER No. Description Date DN DN DN X X X NORTH 60' - 0" 44' - 8" DHS KNUD HANSEN 2ND FLOOR TO BE DEMOLISHED 29,708 sqft 49' - 9 1/2" 49' - 8 1/2" 52' - 3" 65' - 9" ROOF ROOF ROOF ROOF ROOF ROOF LIFT LIFT W.C. OPEN TO BELOW W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. W.C. OPEN TO BELOW 26' - 0" 77' - 1" 219' - 9" 31' - 9" 75' - 2" 20' - 6" 75' - 8" 15' - 4 1/2" 65' - 10" 107' - 9 1/2" UTILITY UTILITY UTILITY EL. UTILITY ELECT. D201 E2 D201 B1 D201 C1 D201 E1 07 07 01 2-STORY DOH OLD MENTAL HEALTH BUILDING TO BE DEMOLISHED UNDER A SEPARATE CONTRACT 4-STORY DOH KNUD HANSEN TOWER BUILDING TO BE DEMOLISHED UNDER A SEPARATE CONTRACT 41' - 6" KEYPLAN 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D102 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION 2ND FLOOR PLAN 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 1/16" = 1'-0" D102 2ND FLOOR PLAN - DEMOLITION A1 # KEYNOTES - DEMOLITION # DESCRIPTION 01 DEMOLISH EXISTING BUILDING TO PROVIDED EXTENTS INCLUDING ROOF STRUCTURE, EXTERIOR AND INTERIOR WALLS, WINDOWS, DOORS, FLOORS AND FLOOR SLABS, ALL BUILDING UTILITIES: PIPING, DUCTWORK, ELECTRICAL, FIXTURES AND DEBRIS DOWN TO SOIL (TYPICAL) 07 DEMOLISH EXISTING ELEVATOR SHAFT No. Description Date DN DN X X X NORTH KEYPLAN D201 A1 D201 E2 D201 B1 D201 C1 2-STORY DOH OLD MENTAL HEALTH BUILDING TO BE DEMOLISHED UNDER A SEPARATE CONTRACT 4-STORY DOH KNUD HANSEN TOWER BUILDING TO BE DEMOLISHED UNDER A SEPARATE CONTRACT 3-STORY DHS KNUD HANSEN BUILDING TO BE DEMOLISHED AC AC AC AC AC AC AC AC AC AC AC AC 01 07 07 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D109 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION ROOF PLAN 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 1/16" = 1'-0" D109 ROOF PLAN - DEMOLITION A1 # KEYNOTES - DEMOLITION # DESCRIPTION 01 DEMOLISH EXISTING BUILDING TO PROVIDED EXTENTS INCLUDING ROOF STRUCTURE, EXTERIOR AND INTERIOR WALLS, WINDOWS, DOORS, FLOORS AND FLOOR SLABS, ALL BUILDING UTILITIES: PIPING, DUCTWORK, ELECTRICAL, FIXTURES AND DEBRIS DOWN TO SOIL (TYPICAL) 07 DEMOLISH EXISTING ELEVATOR SHAFT No. Description Date X X X DHS B&E 1ST FLOOR 60' - 0" DHS B&E 2ND FLOOR 70' - 0" DHS B&E B.O. ROOF 80' - 0" EXISTING HISTORIC JSM BUILDINGS AND WALL TO REMAIN DHS B&E BASEMENT 50' - 0" 3-STORY DHS KNUD HANSEN BUILDING TO BE DEMOLISHED DHS B&E 1ST FLOOR 60' - 0" DHS B&E 2ND FLOOR 70' - 0" DHS B&E B.O. ROOF 80' - 0" DHS B&E BASEMENT 50' - 0" 3-STORY DHS KNUD HANSEN BUILDING TO BE DEMOLISHED DOH TOWER BUILDING UNDER SEPERATE CONTRACT DHS B&E 1ST FLOOR 60' - 0" DHS B&E 2ND FLOOR 70' - 0" DHS B&E B.O. ROOF 80' - 0" DHS B&E BASEMENT 50' - 0" DOH TOWER BUILDING UNDER SEPERATE CONTRACT DOH WIC BUILDING TO REMAIN 02 3-STORY DHS KNUD HANSEN BUILDING TO BE DEMOLISHED DHS B&E 1ST FLOOR 60' - 0" DHS B&E 2ND FLOOR 70' - 0" DHS B&E B.O. ROOF 80' - 0" DHS B&E BASEMENT 50' - 0" 3-STORY DHS KNUD HANSEN BUILDING TO BE DEMOLISHED DHS B&E 2ND FLOOR 70' - 0" DHS B&E B.O. ROOF 80' - 0" WALL TO BE DEMOLISHED DOH TOWER BUILDING UNDER SEPERATE CONTRACT 3-STORY DHS KNUD HANSEN BUILDING TO BE DEMOLISHED KEYPLAN 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D201 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION ELEVATIONS 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 1 1/16" = 1'-0" D201 DEMOLTION ELEVATION - SOUTH B1 1/16" = 1'-0" D201 DEMOLITION ELEVATION - EAST C1 1/16" = 1'-0" D201 DEMOLITION ELEVATION - WEST A1 1/16" = 1'-0" D201 DEMOLITION ELEVATION - NORTH B E2 1/16" = 1'-0" D201 DEMOLITION ELEVATION - NORTH A E1 2 3 4 5 # KEYNOTES - DEMOLITION # DESCRIPTION 02 DEMOLISH EXISTING SIDEWALKS, STAIRS, RAMPS, AND RAILINGS TO GRADE No. Description Date X X X KEYPLAN DHS B&E 1ST FLOOR 60' - 0" DHS B&E 2ND FLOOR 70' - 0" DHS B&E B.O. ROOF 80' - 0" DHS B&E BASEMENT 50' - 0" DOH TOWER BUILDING UNDER SEPERATE CONTRACT 06 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. IT IS INTENDED FOR REFERENCE ONLY. THIS PLAN IS NOT INTENDED TO BE A DETAILED DESCRIPTION OF ALL REQUIRED WORK. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD VERIFY ALL SITE AND BUILDING LAYOUT DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCY IMMEDIATELY. DIMENSIONS HAVE NOT BEEN FULLY VERIFIED AND ARE SHOWN FOR GENERAL DEFINITION OF SCALE AND EXTENTS OF SCOPE WHERE SHOWN. ALL TREES ARE TO REMAIN AND WHERE ADJACENT TO BUILDING DEMOLITION, SHOULD BE PROTECTED FROM ALL DAMAGE, TYPICAL, UNLESS OTHERWISE NOTED - REFER TO CIVIL. REMOVAL OF BUILDINGS SHALL INCLUDE ENTIRE SITE BEING CLEARED DOWN TO SOIL, TYPICAL. DEMOLITION INCLUDES HAULING AND PROPER DISPOSAL - REFER TO SPECIFICATIONS. DEMOLITION INCLUDES REMOVAL OF ALL TRASH AND ABANDONED VEHICLES ON SITE COORDINATE REQUIREMENTS AND LOCATION OF THE DEMARCATION WITH THE LOCAL TELEPHONE COMPANY AND IT DEPARTMENT. ALL AREAS NOT NOTED FOR DEMOLITION ARE TO BE PROTECTED. MAINTAIN TEMPORARY POWER TO SITE - COORDINATE WITH OWNER AND UTILITY. REFER TO CIVIL UTILITY LOCATIONS AND SITE DEMOLITION SCOPE. CONTRACTOR TO FIELD LOCATE EXISTING BUILDING POTABLE WATER AND SANITARY SEWER UTILITIES AND CAP SERVICES. CONTRACTOR TO COORDINATE UTILITY DEMOLITION WITH THE ST. THOMAS WATER AND POWER AUTHORITY (WAPA) AND WASTE MANAGEMENT AUTHORITY (WMA) PRIOR TO CONSTRUCTION. CONTRACTOR TO USE CAUTION WHEN DEMOLISHING SEWER PIPE KNOWN TO RUN BELOW BUILDING FOUNDATION. USE ALTERNATE MEANS SUCH AS BY-PASS PUMPING IF NECESSARY TO ENSURE CONTINUATION OF FLOWS DURING CONSTRUCTION. REPAIR PIPE IMMEDIATELY IF IMPACTED DURING FIELD WORK. CONTRACTOR TO REFER TO ELECTRICAL ENGINEER FOR REMOVAL AND REPLACEMENT OF EXISTING ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING PRIOR TO DEMOLITION. REFER TO SHEET D005 FOR PICTURES OF EXISITING CONDITIONS. GENERAL DEMOLITION NOTES EXISTING WALL TO REMAIN DEMOLITION SYMBOL LEGEND EXISTING WALL TO BE DEMOLISHED EXISTING DOOR TO BE DEMOLISHED NOT IN SCOPE / TO REMAIN DOH KNUD HANSEN TOWER SCOPE DHS KNUD HANSEN BUILDING SCOPE TEMPORARY CONSTRUCTION FENCING REVISIONS: DRAWN BY: CHECKED BY: DATE: NOVUS JOB NUMBER SHEET NUMBER A B C D E ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY. 1 2 3 4 5 1 2 3 4 5 NOT FOR CONSTRUCTION INPROGRESS DOCUMENTS FOR INTERIM REVIEW ONLY. NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION. SUBMISSIONS: Ref Description Date A Programming B 60% CDs C 90% CDs D 100% CDs E 30% CDs ODR TASK ORDER NUMBER D301 10/15/2025 KB HK 1303 Hospital Ground, Knud Hansen Complex St. Thomas, US. Virgin Islands 00802 KNUD HANSEN DHS B&E DEMOLITION SECTION 60% DEMOLITION DRAWINGS 470-23-49 010-9-101918 10/15/2025 1 2 3 4 5 1/16" = 1'-0" D301 DEMOLITION SECTION - FACING WEST B1 # KEYNOTES - DEMOLITION # DESCRIPTION 06 DEMOLISH EXISTING CISTERN No. Description Date