VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

AMENDMENT SIX 6 IFB020DPPC19 C

Collection
Contracts & Procurement
Sub-shelf
dpp.vi.gov (Property and Procurement contracts)
Kind
Contract
Date
2024-02-06
Topics
Procurement
Pages
8
Text
OCR Text

SS NMEA Department of Pro &Procurement z\ Govemment of the United States Virgin Islands 3274 ESTATE RICHMOND, CHRISTIANSTED, U.S. VIRGIN ISLANDS 00820 a 8201 SuB BASE, 3RD FLOOR, ST. THOMAS, U.S. VIRGIN ISLANDS 00802 OY & ————— ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 Re Pas ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.774.9587 HTTP://DPP.VI.GOV AMENDMENT SIX (6) May 6, 2019 TO: SUBJECT: IFB020DPPC19 (C) Repairs to Department of Property and Procurement’s Main Bldg. and Central Stores located at 3274 Estate Richmond, St. Croix, U.S. Virgin Islands INSERT: New Bid Schedule and Plans DELETE: Old Bid Schedule All other terms and conditions remain the same. A copy of this amendment must be returned with your bid. Government of the U.S. Virgin Islands DEPARTMENT OF PUBLIC WORKS BID SHEET MARED ‘Farquhar ear sen rates Item No. Description of Work Qty. Units Unit Price Total Cost EXTERIOR GATE 1 Repair 20LF X 8FT High Wrought Iron Rolling Gates by Central 1 Ls Stores. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2019/03/AMENDMENT-SIX-6-IFB020DPPC19-C.pdf

SHA-256 2544254cc27d8b6d6c15310a38b008085617391271959fd023269d33baa6b694

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-2544254cc27d

Document text

SS NMEA Department of Pro &Procurement z\ Govemment of the United States Virgin Islands 3274 ESTATE RICHMOND, CHRISTIANSTED, U.S. VIRGIN ISLANDS 00820 a 8201 SuB BASE, 3RD FLOOR, ST. THOMAS, U.S. VIRGIN ISLANDS 00802 OY & ————— ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 Re Pas ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.774.9587 HTTP://DPP.VI.GOV AMENDMENT SIX (6) May 6, 2019 TO: SUBJECT: IFB020DPPC19 (C) Repairs to Department of Property and Procurement’s Main Bldg. and Central Stores located at 3274 Estate Richmond, St. Croix, U.S. Virgin Islands INSERT: New Bid Schedule and Plans DELETE: Old Bid Schedule All other terms and conditions remain the same. A copy of this amendment must be returned with your bid. Government of the U.S. Virgin Islands DEPARTMENT OF PUBLIC WORKS BID SHEET MARED ‘Farquhar ear sen rates Item No. Description of Work Qty. Units Unit Price Total Cost EXTERIOR GATE 1 Repair 20LF X 8FT High Wrought Iron Rolling Gates by Central 1 Ls Stores. EXTERIOR ROOF Remove/replace thermal and moisture protection, flashing, 2 sheet 2 Hinkel 160 SF 3 Remove gutters, metal or wood, edge hung. Replace with steel 200 LF utters, half round or box, stock, 6" wide, 26 gauge. —_ Remove existing elastomeric membrane, plywood on roof, fascia 4 and install new 3/4" tongue and groove plywood w/NSF approved 2542 SF rubberized membrane, install purlins 14" O.C.., install 24 gauge galvanized roofing, install new 2"x12" fascia as per plan. Saw cut concrete overhang. Dowel min. 6" and epoxy #4 rebar 6" > both ways, re-cast with 3ksi concrete and paint to match existing (1" 400 SF cover throughout) Seal 8" wide galvanize gutter with silicone to prevent penetration of 6 ae 51 LF water into building. Removal of plywood (9'-6"x2') from the east side of the building next 7 ok g 19 SF to Commissioner's Office. Replace area (9'-6"x2') where the plywood was removed with 8 p . 3 19 SF elastomeric membrane (match existing treated plywood). Selective demolition, thermal and moisture protection, downspouts, 9 : : 40 LF. including hangers. Steel downspouts, galvanized, square, corrugated, 4" x 2" diameter, 10 40 LF. 26 gauge. EXTERIOR WALL Use 100% silicone sealant alongside on the south facing wall where 11 ; : . 83 Lit the concrete swale is located. Fill 1/4" gap. 42 Pressure wash all external walls based on 2500 Ib of operating 8800 SF pressure. Surface preparation (fill all cracks with epoxy compound) and paint 13 a : : 8800 SF building, 2 coats (prime/paint). Remove/replace existing 28'-9" x 6'-0" glass frame in Conference 14 Room with CMU. Final glass frame at top to remain (includes 255 S.F. electrical outlet installation). Place 4" x 9'-4" x 1'9" concrete cap on planters at 4 locations 15 (Comm. Room, Conference Room, Deputy Comm. Room) Includes 4 CY placing crushed gravel up to 4" and cap with concrete. Use #3 wire mesh for reinforcement. Subtotal Item No, Description of Work Qty. Units Unit Price Total Cost 16 Remove/replace 6'-8" x 3' exterior metal doors (include casings, panic bar, deadbolt) on northern side (include painting). 17 Remove/replace 6'-8" x 3' exterior metal doors (include casings, deadbolt) on northern side (include painting). EXTERIOR PUMPHOUSE 18 Rebuild cover in cast concrete 5'x5'. Place 5' L-flashing across top and side adjacent to wall. Apply silicone along base (in/out), replace door with solid core wood door and make water tight. Place strip at bottom. INTERIOR GENERAL 19 Painting walls, complete, on drywall or plaster, primer and 2 finish coats, with roller, includes surface prep. 2000 20 Paint interior doors: Paints & coatings, interior latex, doors, panel, both sides, roll & brush, primer + 1 coat, incl. frame & trim. 23 21 Smoke detectors, EMT wired. 22 Old video cameras (remove) COMMISSIONER'S SUITE 23 Removal of mold infested stud walls from the Commissioner's Office. 325 24 Re-installation of Partition stud walls , 9'-7" high 5/8" thick purple gypsum board (mold and moisture resistant). Tape and finish two sides. Installed on and including 16 gauge (3-5/8" metal studs) spaced 24" On-Center. and (3-1/2" tracks). Perimeter Stud wall shall be erected to the ceiling. Include 2 coats of paint both sides of wall. 325 25 Replace ceiling tiles in Comm. Office w/fire rated purple gypsum board water & mold resistant, taped and finished, skim coat (level 5 and to include re-routing existing cables/wires). Include insulation & access point. 234 S.F. 26 Replace ceiling tiles in Asst. Comm. Office w/fire rated purple gypsum board water & mold resistant, taped and finished, skim coat (level 5 and to include re-routing existing cables/wires). Include insulation & access point. 120 S.F. 27 Replace ceiling tiles in Conference Room w/fire rated purple gypsum board water & mold resistant, taped and finished, skim coat (level 5) and to include re-routing of existing cables/wires. Include insulation & access point. 285 S.F. 28 Remove/replace existing partition between Comm. Office and Conference Room w/sound barrier wall. Include insulation. 214 SF: 29 Remove/Replace gypsum board walls in Comm. Secretary's Office w/ purple mold resistant board (include 2 coats of paint). 375 S.F, 30 Remove/replace gypsum board wall in Asst. Comm. Office w/ purple mold resistant board (include 2 coats of paint). Include insulation 466 SiF. 31 Remove/Replace gypsum board ceiling in Comm. Bathroom. S.F. 32 Replace electrical lighting in Comm. Bathroom. PROPERTY DIVISION 36 Demolition ceiling, suspended acoustical tile. 1682 SF 37 Suspended acoustic ceiling tiles, mineral fiber tile, lay-in, rough texture, 2' x 2' or 2' x 4', 5/8" thick. 1682 SF 38 Remove/Replace gypsum board ceiling in Div. of Property break room to include 2 coats of paint. 114 SF 39 Remove/Replace gypsum board wall in Div. of Property break room w/ purple mold and moisture resistant gypsum board to include 2 coats of paint. 340 SF Subtotal Item No. Description of Work Qty. Units Unit Price Total Cost 40 Remove/Replace gypsum board wall in small bathroom to include 2 155 SF coats of paint. Remove gypsum board ceiling in small bathroom with moisture/mold 41 resistant purple board to include 2 coats of paint. 25 SF 42 Remove/replace lights in kitchen 2 EA Remove gypsum board wall and ceiling in A/C room w/moisture & 43 mold resistant purple gypsum board to include 2 coats of paint. 150 SF TRANSPORTATION DIVISION 44 Remove/replace gypsum board wall in Auxiliary Closets 1 & 2 225 SF (include 2 coats of paint). 45 Remove/replace sheet rock wall in hallway across from 422 SF Transportation Office (Rm #17) and include 2 coats of paint. 46 Remove/replace gypsum board ceiling in hallway across from 77 SF Transportation Office (Rm #17) and include 2 coats of paint. 47 Remove/Replace gypsum board ceiling in Transportation Office #17. 225 SF. PROCUREMENT DIVISION 48 Removal of existing suspended ceiling tiles and installation of new 3800 SF ceiling cross "t" resulting in 2'x2' grid Suspended acoustic ceiling tiles, mineral fiber tile, lay-in, rough bis texture, 2' x 2’ , 5/8" thick. cial ai Subtotal MAIN HEADQUARTER TOTAL Item No. Description of Work Qty. Units Unit Price Total Cost 50 Removal of steel siding, corrugated, on steel frame, 26 gauge 500 SF (include insulation). 51 Installation of steel siding, corrugated, on steel frame, 26 gauge. 500 SF Sheet metal flashing, aluminum, flexible, mill finish, .032" thick, 52 : . 30 SF including up to 4 bends. 53 Demolition, ceiling tiles, including suspension system to include 3200 SF removal to existing lighting. Complete Suspended ceilings, fiber ceiling board, plain faced 2 x 2 x 54 3/4, includes standard system, excluding carrier channels. Add 3200 SF carrier channels, 1-1/2", for 4' OC, (reinstallation of existing lighting) Suspended acoustic ceiling tiles, mineral fiber tile, lay-in, rough ” texture, 2' x 2' or 2' x 4', 5/8" thick. ieee sid Walls and partitions demolition, metal or wood studs, finish two 56 ; 1440 SF sides, plasterboard (gypsum wallboard). 57 Partitions, non-load bearing metal stud, 25 ga, 24" OC, 3-5/8" wide. 1440 SF 58 Gypsum wallboard, on walls, standard, taped & finished (level 4 1440 SF finish), 5/8" thick. Painting walls, complete, on drywall or plaster, primer and 2 finish 59 : p 1440 SF coats, with roller, includes surface prep. 60 Selective demolition, thermal and moisture protection, insulation, 330 CF Batts or blankets. Blanket insulation, for walls or ceilings, Kraft faced fiberglass, 3 1/2" 61 thick, R13, 15" wide. na al Junction boxes, 4" square & octagon, electrical demolition, remove, 62 ; ‘ a 2 EA including removal of supports and terminations Combination devices, residential, S.P. switch/receptacle, EMT & 63 . ‘ ; 2 EA wire, 20' 15 amp, incl box & cover plate. 64 Galvanized steel gutters, half round or box, stock, 6" wide, 26 gauge. 60 LF. 65 Ceiling demolition, gypsum board, per s.f., nailed or screwed. 64 SF (Kitchen area) Purple mold/moisture resistant gypsum board, on ceiling, standard, 66 taped & finished (level 4 finish), 5/8" thick. (Kitchen area) 64 SF Painting ceilings, complete, on drywall or plaster, primer and 2 finish 67 : ; 64 SF coats, with roller, includes surface prep. 68 Steel downspouts, galvanized, round, corrugated, 6" diameter, 26 40 LF gauge. _ 69 Reinstallation of 110 outlet. 1 EA Fans, residential, electrical demolition, remove, including removal of 70 supports and terminations and replace with residential fan, bath 1 EA exhaust, grille, back draft damper, 110 CFM 7 Caulk and seal interior and exterior of the glass windows on the east 640 LF side of the building to stop the intrusion of water. a 72 Steel roofing panels, on steel frame, corrugated or ribbed, colored, 4000 SF 24 gauge. Door demolition, special doors, overhead, commercial, 12' x 16' high, 73 i 1 EA remove, includes frames WAREHOUSE TOTAL WAREHOUSE AND MAIN HEADQUARTERS TOTAL| 74 Mobilization (10% of total) 1 LS 75 Contingency (10% of total) 4 LS GRAND TOTAL GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES SHEET INDEX SHEET NUMBER DESCRIPTION TA TITLE SHEET COVER & LOCATION MAP Ss EXISTING SITE PLAN & PROJECT PICTURES AND SUMMARY $-2 ROOFING DETAIL DEPARTMENT OF PUBLIC WORKS ISLAND OF ST. CROIX THE DEPARTM ROOF REPAIRS AT Hlchte Paget yla/1 ENT OF PROPERTY & PROCUREMENT DIVISION OF ENGINEERING ———— 6002 ESTATE ANNAS HOPE sai: enim: T —————— Awe CHRISTIANSTED V.1!. 00820 HALDOR FARQUHAR OATE NELSON M PETTY JR PE DATE DEPARTMENT OF PUBLIC WORKS DEPARTMENT OF PUBLIC WORKS PROJECT SUMMARY This project seeks to alleviate the consistent water infiltration of the Department of Property & Procurement's main headquarters every time there is a rain event. Both eye witness and an inspection has yielded the common conclusion that current the roofing is insufficient and is the main cause of infiltration. The inspection performed by Mr. Flemming and Mr. Farquhar from the Dept. of Public Works found that sections of the elastomeric coating over the lobby extending to the Property Division has failed. The recommendation is to take advantage of the existing roofs slope and replace the hypalon membrane with a metal roof over a rubberized coated tongue and groove plywood for redundancy. \eontit™ mre ie DIVISION OF ENGINEERING , ee 6002 ESTATE ANNAS HOPE es — S 1 or oi CHRISTIANSTED V.1, 00820 HALDOR FARQUHAR DATE NELSON M PETTY. JR. PE DATE - be Se PROJECT ENGINEER COMMISSIONER i OEPARTMENT OF PUBLIC WORKS DEPARTMENT OF PUBLIC WORKS + SS St Bg) ROOFING DETAIL FOR PROPERTY - eS 88 & PROCUREMENT ROOF REPAIRS — - — = —_—_———- = —" - —- a Tee - = Seas. = rete St poo — wie. = mt Ne ree cn nen = smrnnen = os eS M 4 EE | u ssn en en eee a Se end Soc ea ee tne nes dex: fom aR | rt ' i ' +h | . ca 4 + 4 ' ' rach +48 fo 4 " { — a00tttnee sme Arittrtitiscitestsisss + +74 re chet tet ne sskaandaiei Ss = ott et ot iia —— + $ t ceres: my + + $< + + + = praned geecenspeseneaee, pipes te Strses == 9 nnn. mn + te Sana gaasqaagan: 3 es feceresermemtbreereearat ei ‘ieee 3 eos os auuamenan + + = oF See o = S23: fir : = ———— entero: ~ — t t 3 =~ + + + + + + + + + “+ + + + + + x —= Tt + + z es = }~ -——S = a Bs ? + eS a4 + - Rib ne a - St — $F te. 3 + — Se t + t re t + t — + c= am bs + ¥ Re oe TEL SNE: eam aT i M L L if a Z ; H ' — t i ‘a . ot nen iain t T ———— s SS ee pee eee =e + = ee ee * ates < NOT TO SCALE Tall FASCIA * GUTTER Tad PURLIN 14 OC 4 PLYWOOD CONCRETE PARAIET WALL TYE A TOF my, CORROSION RESISTANT FASTENERS ni a aeet PER MANUFACTURERS SPECIFICATIONS #14 x 2-1/2" LONG STAINLESS STEEL SELF CORRUGATED METAL ROOF DRILLING SCREW & MIN. 1/2” DIA. GASKETED 24" PURLINS PANEL ASTM A792 GRADE B WASHER (14" 0.C.) ALUMINUM ZINC ALLOY, 24 GA. ew fo LJ MIN., 7/8" DEEP RIBS @ 2-2/3" 0.C. ccs | wetness ean her aT age Pea oe LIC CO Oh yz LL aod j j I J — : #14x1" LONG STAINLESS C UCT OTE ——— ee a ee eee ie STEEL SELF-DRILLING iq Fi 5 er 1: eae ROOFING SCREW ' “ + rf W/GASKETED WASHER 1. ORIGINAL ROOF MEMBRANE AND PLYWOOD SHALL BE REMOVED LIQUID RUBB REMOVE EXISTING @ 6" 0.C. @ SIDELAPS 2. NEW 3/4 PLYWOOD SHALL BE INSTALLED (APPLIED MEMBRANE) PLYWOOD WITH NEW Se ae TONGUE & GROOVE 3. NEW 2°x4" PURLINS SHALL BE INSTALLED 14" 0.C. (EXISTING) PLYWOOD 4. NEW 24 GAUGE GALVALUME SHALL BE INSTALLED <b es 5, USE DPNR's CONSTRUCTION INFORMATION FOR A STRONGER HOME SPAN 4TH EDITION APRIL 2018 AS REFERENCE (TYPICAL) OPEN WEB JOIST (EXISTING) CROSS SECTION B moneee - DIVISION OF ENGINEERING ety 6002 ESTATE ANNAS HOPE APPROVED pePRoveD S 2 — DA) - Awe CHRISTIANSTED V.I. 00820 ADORFARGUAR aa TET EE = , DEPARTMENT OF PUBLIC WORKS CORTON Or PUBLIC WORKS