OCR Text

NOTES: CONTRACTOR SHALL REMOVE ALL ROCK, LOOSE METAL, DEBRIS, 8. CONTRACTOR SHALL INSPECT ALL 16. AIR CONDITIONING CONTRACTOR FASTENERS, DERELICT PARTS, EXISTING PATCHES AND SEAMS FOR SHALL CHECK ALL REFRIGERANT PLANTS OR TREES ETC. FROM ANY DEFECTS OR SEPARATIONS LINES FOR LEAKS AND PROPER BOWER WASHING MANUFACTURER’S SPECIFICATIONS. 5 CONTRACTOR SHALL INSPECT ALL 17. A/C CONTRACTOR SHALL DISPOSE , OF ALL UNITS IDENTIFIED FOR n RNY ALCANIIG. AGENT OR ALLOW ROOF DRAIN CONNECTIONS BOTH REMOVAL AS PER VIRGIN ISLANDS ABOVE AND BELOW EXISTING LOCAL CODES. CONTAMINATED WATER TO ENTER SOOFING ASSEMBLY. ASSURING TANKS. DURING TNE POWER THAT ALL EXISTING CONNECTIONS 18. A/C CONTRACTOR SHALL BALANCE WASHING PROCESS. MEANING ALL SEE OTS NPCN DISCOVERY OF ANY ALL NEWLY INSTALLED AIR RAIN LEADERS CONNECTED TO ANY DEFECTS. CONTRACTOR SHALL CONDITIONING UNITS AS REQUIRED ACS SAL eee CONNECTED REPAIR SAID CONNECTIONS, PIPING, 19. ALL REFRIGERANT LINES SHALL BE PRIOR TO CLEANING THE ROOF ROOF DRAIN ETC. AS NECESSARY ELEVATED OFF SINGLE PLY TO PREVENT ANY LEAKS. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2016/12/HHF-BOWSKY-ROOF-MODEL.pdf

SHA-256 2785b3e2782ba8cdb7851bc24a1e3699e1863d99863828ae45c7835244f36aaf

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-2785b3e2782b

Document text

NOTES: CONTRACTOR SHALL REMOVE ALL ROCK, LOOSE METAL, DEBRIS, 8. CONTRACTOR SHALL INSPECT ALL 16. AIR CONDITIONING CONTRACTOR FASTENERS, DERELICT PARTS, EXISTING PATCHES AND SEAMS FOR SHALL CHECK ALL REFRIGERANT PLANTS OR TREES ETC. FROM ANY DEFECTS OR SEPARATIONS LINES FOR LEAKS AND PROPER BOWER WASHING MANUFACTURER’S SPECIFICATIONS. 5 CONTRACTOR SHALL INSPECT ALL 17. A/C CONTRACTOR SHALL DISPOSE , OF ALL UNITS IDENTIFIED FOR n RNY ALCANIIG. AGENT OR ALLOW ROOF DRAIN CONNECTIONS BOTH REMOVAL AS PER VIRGIN ISLANDS ABOVE AND BELOW EXISTING LOCAL CODES. CONTAMINATED WATER TO ENTER SOOFING ASSEMBLY. ASSURING TANKS. DURING TNE POWER THAT ALL EXISTING CONNECTIONS 18. A/C CONTRACTOR SHALL BALANCE WASHING PROCESS. MEANING ALL SEE OTS NPCN DISCOVERY OF ANY ALL NEWLY INSTALLED AIR RAIN LEADERS CONNECTED TO ANY DEFECTS. CONTRACTOR SHALL CONDITIONING UNITS AS REQUIRED ACS SAL eee CONNECTED REPAIR SAID CONNECTIONS, PIPING, 19. ALL REFRIGERANT LINES SHALL BE PRIOR TO CLEANING THE ROOF ROOF DRAIN ETC. AS NECESSARY ELEVATED OFF SINGLE PLY TO PREVENT ANY LEAKS. MEMBRANE ROOFING USING THE — : APPROPRIATE CADDY PYRAMID 78'-3% SUID MEMBRANE THAT WAG 10. CONTRACTOR SHALL REPLACE ALL SYSTEM OR EQUAL. DAMAGED ROOF DRAIN SCREENS, APPLIED ON TOP OF EXISTING STRAINERS OR DOME TO MATCH SINGLE PLY MEMBRANE. AND EXISTING OR APPROVED EQUAL. : REPAIR IDENTIFIED SECTIONS AS — PER ROOFING MANUFACTURER'S 11. CONTRACTOR SHALL INSPECT CONTRACTOR SHALL REMOVE ALL 2°—0" HIGH pINGLE PLY MEMBRANE ALONG THIS WALL Z SPECIFICATIONS. AROUND ALL ROOF PENETRATIONS EXISTING METAL PIPE SUPPORTS AND A/C SUCH AS AIR CONDITION PIPING, REPLACE WITH CADDY PYRAMID , ° Mg to on — AC to | EISTING ACCESS FATEH CONTRACTOR WILL BE HELD PVC ROOF VENTS, EXHAUST VENTS SYSTEM OR APPROVE EQUAL n remain xe, || -ernain RESPONSIBLE FOR DRAINING AND ETC. FOR ANY DEFECTS IN EXISTING field very quantity required for 7 Zo NA fo) . CLEANING ANY CISTERN AFFECTED THE SINGLE PLY MEMBRANE OR proper installation. o oe A/C | | Rd is | A/C . BECAUSE OF NEGLIGENCE AND SEALANT AND REPAIR ANY SUCH it A/C = wo} 17 \ = J RTU| #7 RTU 8 DRINKING WATER AFTER ALL ROOF MANUFACTURER'S. SPECIFICATIONS > ae v a/c & REPAIR HAS BEEN COMPLETED. oO oO ys A oF RTU to @, RU to CONTRACTOR SHALL REPAIR ALL 12. CONTRACTOR SHALL INSPECT AY remain remain © EXISTING SINGLE PLY MEMBRANE ON 3 nN VISIBLE DAMAGED AREAS OF THE ALL RAISED. SURFACES AND EXISTING 12 TON AIR CONDITION a x SINGLE PLY MEMBRANE ROOFING AS AROUND ANY ROOk OPENING FOR ROOF TOP UNIT TO BE REMOVED . x PER MANUFACTURER’S ANY DEFECTS IN THE EXISTING ROOF TOP UNIT WITH CORROSION © 4 FROM THE A/C UNIT CONDENSATION WASH APPROXIMATELY 3,941 DISCOVERY OF ANY DEFECTS, SUCH PROTECTIVE COATING. A/C UNIT < DRAIN LINE BECAUSE THERE WAS NO EXISTING METAL CAP. FLASHING SQUARE FEET OF EXISTING ROOF & AS CUTS, PUNCTURES, SHALL BE OF THE SAME TONNAGE, _ PARAPET SURFACE AREA, THEN DELAMINATION, ETC. THE VOLTAGE, AMPERAGE, WEIGHT ul RAIN AT TIME OF THE SITE VISIT. INSPECT EVERY SQUARE INCH OF CONTRACTOR SHALL REPAIR AS oe EXISTING ROOF DRAINS TO BE THE ROOF & PARAPET FOR ANY COMPATIBLE TO BE INSTALLED ON s PER ROOFING MANUFACTURER’S EXISTING A/C ROOF CURB OPENING a CLEAN, TESTED FOR LEAKS AND DEFECTS IN THE SINGLE PLY SPECIFICATIONS AND LISTED MANUFACTURER OR _ 0 REPAIR AS REQUIRED (typical) MEMBRANE, TO INCLUDE APPROVED EQUAL © ROOF AREA= APPROX, 3,228 SQ. FT. PUNCTURES, CUTS, DELAMINATED 13. CONTRACTOR SHALL REPAIR ANY . O . On 4” SECTIONS, ETC. SECTION OR PART OF ANY ROOFING NOTE CORROSION PROTECTING = MEMBRANE DAMAGED OR MANUPACTURER BE APPLIED BY Lig 3-11" HIGH PARAPET WALL WITH SINGLE PLY MEMBRANE CONTRACTOR SHALL MARK OR WACING. CAUSED BY POWER CONTRACTOR SHALL INSPECT ALL IDENTIFY ALL DAMAGED, PUNCTURED 49-8” TERMINATION BARS AROUND ALL OR DELAMINATED AREAS UPON EQUIPMENT CURBS, WALLS, PARAPET, DISCOVERY OF SAID AREAS. 14. CRORE ALY BISPOCE SA AGED Ne VENTILATION PIPES, AND EXHAUST FANS. AND REPLACE OR REPAIR CONTRACTOR SHALL HIRE QUALIFIED RAD REPLACE WITd NEW IAL INS THOSE AREAS AS REQUIRED TO STOP AND CERTIFIED ROOFING AS IDENTIFIED IN SCOPE OF WORK LEAKS. (typical) CONTRACTORS TO UNDERGO ALL SHEET NECESSARY REPAIRS AS PER ROOFING MEMBRANE 15. CONTRACTOR SHALL REMOVE ALL MANUFACTURE’S SPECIFICATIONS. EXISTING METAL PIPE SUPPORTS CONTRACTOR SHALL INSPECT ENTIRE AND REPLACED WITH NEW CADDY ROOF FOR SOFT SPOTS AND REPAIR PYRAMID SUPPORT BY ERICO AS PER CERTIFIED ROOFING COMPANY OR APPROVED EQUAL SUPPLIER OR MANUFACTURER’S SPECIFICATION (typical) LOCATION OF PROPOSED WORK ROUTE 42 KEY PLAN V10102802 PROJECT |.D OIA Building Number O' SOW Building 217623, 217655 & 217704 YVONNE MILLINER BOWSKY ELEMENTARY SCHOOL Identification No. PHYSICAL DESCRIPTION LIBRARY BUILDING