S16HDPWT18 — Emergency Roadside Clearance (Department of Public Works) [New]
Government of the Virgin Islands EMERGENCY TASK ORDER AGREEMENT Roadside Clearance in the District of St. Thomas, St. John & Water Island - Hurricanes Irma and Maria 2017 THIS AGREEMENT, made this _/ = day of ber 2017, in the Territory of the Virgin Islands of the United States, by and between the Government of the Virgin Islands, (hereinafter referred to as "Government") and AT Construction Solutions, LLC, whose address is, #53_King Street, Christiansted, St. Croix, Virgin Islands 00820 (hereinafter referred to as "Contractor"). WITNESSETH: WHEREAS, the District of St. Thomas, St. John and Water Island in the Territory of the United States Virgin Islands sustained damage including but not limited to down trees, broken utility poles, downed utility lines, blocked roadways, power outages, flooding and mudslides from the passage of Category 5 Hurricane Irma (“Hurricane Irma”) on September 6, 2017 and category 5 Hurricane Maria (“Hurricane Maria”) on September 20, 2017; and WHEREAS, the Government is in need of a contractor to provide Roadside Clearance in the District of St. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpp.vi.gov/wp-content/uploads/2018/04/S16HDPWT18.pdf
SHA-256 2b3b5e5dc0f1a54602e779506e6bdd81702061772a39569f5172851daa37cfc8
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-2b3b5e5dc0f1
Document text
Government of the Virgin Islands EMERGENCY TASK ORDER AGREEMENT Roadside Clearance in the District of St. Thomas, St. John & Water Island - Hurricanes Irma and Maria 2017 THIS AGREEMENT, made this _/ = day of ber 2017, in the Territory of the Virgin Islands of the United States, by and between the Government of the Virgin Islands, (hereinafter referred to as "Government") and AT Construction Solutions, LLC, whose address is, #53_King Street, Christiansted, St. Croix, Virgin Islands 00820 (hereinafter referred to as "Contractor"). WITNESSETH: WHEREAS, the District of St. Thomas, St. John and Water Island in the Territory of the United States Virgin Islands sustained damage including but not limited to down trees, broken utility poles, downed utility lines, blocked roadways, power outages, flooding and mudslides from the passage of Category 5 Hurricane Irma (“Hurricane Irma”) on September 6, 2017 and category 5 Hurricane Maria (“Hurricane Maria”) on September 20, 2017; and WHEREAS, the Government is in need of a contractor to provide Roadside Clearance in the District of St. Thomas, St. John and Water Island to resume the provision of services to the Public; and WHEREAS, the Contractor was selected in accordance with the authority in 31 V.I.C § 239 (a)(1); and WHEREAS, the Contractor represents that it is willing and capable of providing the services in an expeditious manner and in accordance with the specifications cited in Addendum I and IJ; NOW THEREFORE, it is mutually agreed between the Parties as follows: Section 1. That for and in consideration of the prices and other terms and conditions of this Agreement, the Contractor agrees to provide the Government with all necessary supplies to provide the services outlined in Addendum I, (Scope of Work) attached hereto and made a part of this Contract. Section II. | The Government, in consideration of the satisfactory performance of the services described in Addendum I, (Scope of Services) agrees to pay the Contractor in accordance with invoices submitted and approved by the Department of Property and Procurement, as set forth in Addendum II, (Compensation) attached hereto and made a part of this Agreement. Supply Contract NO. SibHbPWT/$ CATCS) 1 Contractor’s Initials: G2 3. This Amendment is conditioned upon the approval of the Governor, and the execution of this Amendment by the Governor hereby ratifies the Contract entered into by the Parties. WITNESSES: GOVERNMENT OF THE VIRGIN ISLANDS farol, 12] IE loyd T. ough,/Jr./ Commissioner v, Wh Department’of Property and Procurement Date: CONTRACTOR Cop Masig 10 José AT Construction Solution, LLC fing Date: Kev, 17, 221 Approved for Legal Sufficiency by ty Department of Justice: APPROVED: 1 [one Honorable Kenneth E. Mapp Governor of the Virgin Islands Supply Contract No. SO244HDPWT18 (ATCS) Contractor’s Initial: (e)