VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

wp content uploads 2025 05 PSC Order No. 39 2013 Dockets 612 613 614 WAPAs Ann. Rev. Increase of.1581d13d

Collection
Executive Agency Records
Sub-shelf
PSC / BER Filings
Kind
Government Report
Date
2025
Pages
2
Text
OCR Text

GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES PUBLIC SERVICES COMMISSION IN RE: THE VIRGIN ISLANDS WATER and POWER Docket No. 612 AUTHORITY’S PETITION FOR AN ANNUAL REVENUE INCREASE OF BASE RATES FOR THE ELECTRIC SYSTEM and THE VIRGIN ISLANDS WATER and POWER Docket No. 613 AUTHORITY’S PETITION FOR AN ANNUAL REVENUE INCREASE OF BASE RATES FOR THE WATER SYSTEM and THE MINIMUM FILING REQUIREMENTS Docket No. 614 FOR THE ELECTRIC AND WATER LEVELIZED ENERGY ADJUSTMENT CLAUSE Order No. 39/2013 Nee? Newer See Nee Nee Nee Nee” Se ee ee ee et ee Se ae ee ey ee a —— ORDER WHEREAS, on November 16, 2012, the Virgin Islands Water and Power Authority C“WAPA” or the “Authority”) filed with the Public Services Commission (“PSC” or “Commission”) Petitions for an Annual Revenue Increases in the Base Rates for both the Electric Department and the Water Department (respectively, Docket 612 and Docket 613); and WHEREAS, at the Commission’s December 12, 2012 meeting, the Commission suspended the requested rate increases for a period not to exceed 8 months, in order to permit the investigation of th …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://psc.vi.gov/wp-content/uploads/2025/05/PSC-Order-No.-39-2013-Dockets-612-613-614-WAPAs-Ann.-Rev.-Increase-of-Base-Rates-for-E-W-Sys-and-MFR.pdf

SHA-256 2dde31e9a12c5c77f52f4ac367dcd27a195c1e3719cee8752b8c82c6b1d2b109

Re-using this document

territorial public record

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-2dde31e9a12c

Document text

GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES PUBLIC SERVICES COMMISSION IN RE: THE VIRGIN ISLANDS WATER and POWER Docket No. 612 AUTHORITY’S PETITION FOR AN ANNUAL REVENUE INCREASE OF BASE RATES FOR THE ELECTRIC SYSTEM and THE VIRGIN ISLANDS WATER and POWER Docket No. 613 AUTHORITY’S PETITION FOR AN ANNUAL REVENUE INCREASE OF BASE RATES FOR THE WATER SYSTEM and THE MINIMUM FILING REQUIREMENTS Docket No. 614 FOR THE ELECTRIC AND WATER LEVELIZED ENERGY ADJUSTMENT CLAUSE Order No. 39/2013 Nee? Newer See Nee Nee Nee Nee” Se ee ee ee et ee Se ae ee ey ee a —— ORDER WHEREAS, on November 16, 2012, the Virgin Islands Water and Power Authority C“WAPA” or the “Authority”) filed with the Public Services Commission (“PSC” or “Commission”) Petitions for an Annual Revenue Increases in the Base Rates for both the Electric Department and the Water Department (respectively, Docket 612 and Docket 613); and WHEREAS, at the Commission’s December 12, 2012 meeting, the Commission suspended the requested rate increases for a period not to exceed 8 months, in order to permit the investigation of the requested rate increases; and