VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

Lat18_VIPA-ENGINEERING_LETTER

Collection
Research & Technical Reports
Sub-shelf
dpnr.vi.gov
Kind
Research Report
Island
St. Thomas
Date
2023
Pages
2
Text
Native Text

Virgin Islands Port Authority, Engineering Division | P.O. Box 301707 St. Thomas, VI 00803 | T: (340) 774-1629 Virgin Islands Port Authority Engineering Division www.viport.com May 15, 2023 LTR-23-0014 Jack Rock B-A C, LLC Attention: Attorney George Dudley Dudley Newman Feuerzig LLP Subject: Revised VIPA Performance Criteria for Proposed Latitude 18 Marina Development Dear Attorney Dudley: Following the correspondence and multiple discussions that took place between the Latitude 18 marina development team and the Virgin Islands Port Authority (VIPA), VIPA still has concerns when it comes to simultaneous operations of the Urman Victor Fredericks (UVF) Marine Terminal and the proposed Latitude 18 Marina but believes that these concerns can be mitigated with the revised operating restrictions for the proposed marina. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpnr.vi.gov/wp-content/uploads/2023/08/VIPA-ENG_LTR-23-0014_2023-05-15.pdf

SHA-256 3489c99f15553a75f871d3017f977ac85f1226b565d0f91818fc56d15da7ecbd

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-3489c99f1555

Document text

Virgin Islands Port Authority, Engineering Division | P.O. Box 301707 St. Thomas, VI 00803 | T: (340) 774-1629 Virgin Islands Port Authority Engineering Division www.viport.com May 15, 2023 LTR-23-0014 Jack Rock B-A C, LLC Attention: Attorney George Dudley Dudley Newman Feuerzig LLP Subject: Revised VIPA Performance Criteria for Proposed Latitude 18 Marina Development Dear Attorney Dudley: Following the correspondence and multiple discussions that took place between the Latitude 18 marina development team and the Virgin Islands Port Authority (VIPA), VIPA still has concerns when it comes to simultaneous operations of the Urman Victor Fredericks (UVF) Marine Terminal and the proposed Latitude 18 Marina but believes that these concerns can be mitigated with the revised operating restrictions for the proposed marina. The requested operating restrictions are as follows: - Restriction of vessels queuing for fuel operations to be solely located within the riparian footprint that constitutes the lease space of the marina; - Restriction of vessel length overall (𝐿𝐿𝐿𝐿𝐿𝐿) utilizing the T-dock to be 150-feet to ensure all turning maneuvers of vessels utilizing the T-dock occur outside of the car transport berth pocket; - Development of an operations plan for the storage of the wave attenuation system as part of an adverse weather preparation plan. The wave attenuator storage operations plan will provide criteria for the timing and trigger event that commences the dismantling and storage process to ensure no impact to UVF Marine Terminal operations or the safety of operations in the navigational channel pre-storm event and post-storm event. VIPA will review and approve the wave attenuation system storage plan to satisfy that the removal, installation, and storage of floating wave attenuation elements does not create risk to VIPA facilities and that removal and installation operations do not interfere with port operations in the navigation channel. - Applicant is aware of the implicit risk of adverse impacts to vessels mooring on the T-dock adjacent to the waterway due to the surrounding sea state in and around the existing waterway and agrees to indemnify VIPA, VIPA tenants, and operators utilizing VIPA property against those adverse impacts. VIPA believes that these reasonable measures will mitigate any potential impact to UVF Marine Terminal from operations at the proposed Latitude 18 Marina as long as the preliminary design of the marina facility that have presented to VIPA are maintained. If substantial changes to the proposed layout, usage, or functions of the facility are to change, VIPA is to be made aware of said changes in writing and reserves the right to provide additional comments and operating restrictions to ensure the continued safety of operations for the traveling public. Virgin Islands Port Authority, Engineering Division | P.O. Box 301707 St. Thomas, VI 00803 | T: (340) 774-1629 www.viport.com In order to ensure compliance with these proposed restrictions, VIPA would support the inclusion of these restrictions as special conditions to the necessary Department of Planning and Natural Resources – Coastal Zone Management Commission (DPNR-CZM) permit for the facility. Please do not hesitate to reach out with any questions or concerns that you may have surrounding the performance criteria. Best regards, Preston J. Beyer Director of Engineering, Virgin Islands Port Authority CC: Carlton Dowe, Executive Director (VIPA) Anise Hodge, Deputy Executive Director (VIPA) Julice Holder, Chief of Staff (VIPA) Joseph Cranston Jr., Marine Manager – STT/STJ (VIPA) Dale Gregory, Assistant Director of Engineering (VIPA) Mark Pirrello, (Moffatt & Nichol)