Sequential Use of Reclaimed Wastewater Destined for Aquifer Recharge
ie chilean USE OF RECLAIMED WASTEWATER DESTINED FOR AQUIFER RECHARGE by Henry H. Smith Completion Report OWRT Project No. A-001-VI Agreement No. 14-34-7100 September 1976-September 1978 June 1979 The work upon which this report is based was supported in part by funds provided by the United States Department of the Interior, Office of Water. Research and Technology as authorized under the Water Resources Act. of 1964, P.L. 88-379. Technical Report No. 4 Water Resources Research Center Caribbean Research Institute College of the Virgin Islands St. Thomas, USVI 00801 ABSTRACT Effluent from the advanced wastewater treatment plant in St. Croix, U.S. Virgin Islands, a water- deficient island, was used to recharge aquifers by use of spreading basins. Wells in the recharge area were monitored to determine changes in static levels and in quality. Results indicate an increase ‘in the quantity of water in the aguifer and an upgrading in the quality of the effluent. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://www.uvi.edu/files/documents/Research_and_Public_Service/WRRI/Sequential_Use_of_Reclaimed_Wastewater_Destined_for_Aquifer_Recharge.pdf
SHA-256 382b515a330ab65cc44275fe8c8263305b6c94844247c26a9ed056eb61624f5b
Re-using this document
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-382b515a330a
Document text
ie chilean USE OF RECLAIMED WASTEWATER DESTINED FOR AQUIFER RECHARGE by Henry H. Smith Completion Report OWRT Project No. A-001-VI Agreement No. 14-34-7100 September 1976-September 1978 June 1979 The work upon which this report is based was supported in part by funds provided by the United States Department of the Interior, Office of Water. Research and Technology as authorized under the Water Resources Act. of 1964, P.L. 88-379. Technical Report No. 4 Water Resources Research Center Caribbean Research Institute College of the Virgin Islands St. Thomas, USVI 00801 ABSTRACT Effluent from the advanced wastewater treatment plant in St. Croix, U.S. Virgin Islands, a water- deficient island, was used to recharge aquifers by use of spreading basins. Wells in the recharge area were monitored to determine changes in static levels and in quality. Results indicate an increase ‘in the quantity of water in the aguifer and an upgrading in the quality of the effluent. An econo- mic analysis showed the cost of recharge/recovery operations to be significantly less than the cost of desalination of sea water which supplies the a portion of water to the island. iii CONTENTS Page LISTS OF FIGURES | en , vil LIST OF TABLES . a 2 i vii INTRODUCTION AND OVERVIEW . , te ve . | a 1 THE ADVANCED WASTEWATER ~*~ 3 TREAD Phawe , HYDROGEOLOGICAL BACKGROUND - ' iF .. 3 PROCEDURE ae 4 ardunts AND Srscuséron "oY, , ; . . 5 BIBLIOGRAPHY = ve a (24 if. ‘TTL. Iv. VI. - Vil. VIII. Ix. LIST OF FIGURES Location of St. Croix, U.S. Virgin | Islands Project Location and Facilities Effect of Recharge Operations on Project Well PW-8 Effect of Recharge Operations on Project Well PW-9 Effect of Recharge Operations on Control -Well A-18 Effect of Recharge Operations on Control Well GG-7 Effect of Recharge Operations on Control . Well FP-2 - Monthly rainfall data for Golden Grove and Kingshill in St. Croix from September ' 1975 to February 1978 Comparison of Chloride Levels in ‘Project Wells. and greated Effluent Comparison of Nitrate Levels in Project Wells and Treated Effluent - vi 11 12 14 16 17 LIST OF TABLES Page I. Chloride Levels Observed in Weolamsision Project 15 If Hardness Levels Observed in | Reclamation Project 18 Tit Turbidity Levels Shnexwad in Reclamation Project 19 iv. Conductivity a Observed in Reclamation Project 20 Vv. Nitrate Levels Observed in Reclamation Project ra | VI Estimated Costs for the Production and Recovery of Reclaimed Wastewater by Ground Water Recharge tae] Vil _ INTRODUCTION - AND OVERVIEW The U.S.. Virgin Islands. are located about 1,400 miles’ south- east of New York, 1,100 miles east-southeast of Miami and about 50 miles east of Puerto Rico (Figure I). The Virgin Islands are part of the Lesser Antilles of the West Indies which separate the Caribbean Sea from the Atlantic Ocean. St. Croix, the island on which this study takes place, is the largest (about 84 square miles) and southernmost of the Vir- “gin Islands. Potable water is not an abundant resource in St. Croix or any of the Virgin Islands. Average rainfall is about 44 inches per year, streamflow is mostly ephemeral and high tempera- tures along with constant tradewinds cause about 90 percent of the rainfall to be lost to evapotranspiration. Aquifers are small and limited. . While water consumption on St. Croix has been increasing due to population and life style changes, water production has not kept pace. Desalting of sea water accounts for about 60 percent of the water supply, ground water provides about 20 percent, rainwater stored in cisterns accounts for about 13 percent and the remaining 7 percent is usually attributed to recycled water. The high cost of desalting, about $15 per thousand gallons, and the increasing unreliability of the Gesalination plants have increased the importance of water conservation as well as the eve iopment of alternative sources of water. With development of an alternative source in mind, this pro- ject was undertaken. The objectives of this study as proposed originally were to determine to what degree the use of advanced tertiary treated wastewater for (a) culture of fish for food, (b) trickle-irrigation of vegetables and row crops, {c) spreading for irrigation of grasslands or. (d) other related purposes might affect. both the quality and quantity of wastewater for HeGhERgGE« Due to unforeseen circumstances, several of the proposed areas of study could not be addressed. However, some recharg- ing was done and records were kept of the amount of rainfall and quantity of advanced treated water recharged and the quality of this water. Also monitored were several wells in the vicinity of the recharge area. Records of static water levels and several biological and chemical quality parameters of.these wells were maintained. Interpretation of the data collected should provide some indication as to the effective- ness of aquifer recharge in St. Croix. aA fs) Wao RAS = wl Sis SHB @ < PF ox. gb : > « paNTt LLES* Le Fa 0 oe: 9 A, \ ofan) =f ar ud % or A , a ° ag 7 < Sd aah THE ADVANCED WASTEWATER TREATMENT PLANT The source of water for recharge was the 0.5 million gallon per day (mgd) Advanced Wastewater Treatment Plant (AWWTP) at Estate Bethlehem Middle Works. The AWWTP receives effluent diverted from the primary treatment plant. It enters the ‘aeration tanks at the AWWTP where colloidal and dissolved “organic matter converts into larger microorganisms which can be mechanically removed. Large surface turbines stir and _ aerate the water to permit the microorganisms to metabolize the organic matter. In the clarifier the mixture of naicro= organisms fromthe aeration tanks is separated by gravity. The clear water flows to the solids contact tank where che- micals are added to the water to produce a floc which removes remaining particulate matter by increasing their size so that they settle out or are caught on the multi-media sand anthracite filters, which filter the water after it leaves the solids contact tank. After the sand-anthracite filter, the water enters the chlorine contact chamber and chlorine. is added for disinfection before distribution to the recharge areas. HYDROGEOLOGICAL BACKGROUND The treated effluent was used in recharging two geologically dissimilar areas. Both of these areas, Negro Bay and Golden Grove, contain several wells, are relatively close to the AWWTP, are on government-owned land and are accessible for ready observation. These similarities as well as their differences made them ideal study locations. In the Golden Grove area alluvial materials overlay the Kings- hill Marl and fill an intermittent stream channel. This alluvium has a maximum thickness of 70 feet. It consits predominantly of montmorillonitic clay of low permeability with generally three or four water-bearing lenses of sandy- gravel material, each having a maximum thickness of five feet. Though these aquifers appear to be continuous through- out reaches of the stream valley, they are not interconnected _except by wells which penetrate two or more of the lenses. | The piezometric surface shows the water to. be confined in the aquifers and a free water table does not exist. The ground . surface in the Golden Grove recharge area is about 50 feet above sea level while the aquifers range between 35 feet above sea level. to approximately sea level. The Kingshill Marl in the Negro Bay area consists of coral debris and beds of sandy clay alternating with nearly pure limestone. In the recharge area the thickness of the marl is about 160 feet and the ground water level is about 80 feet below the surface. Solution channels are common and probably afford communication and infiltration throughout most of the thickness of the marl. However, at a depth of . 10 feet below the surface, a dense and apparently impermeable bed occurs at the recharge site. Above this dense layer, the marl is permeable and capable of a high rate of infiltration. These conditions suggest that water will move into the upper 10 feet of the formation for storage and future recovery. Because of the depth to the permanent water table and the nature of the formation, no direct mixing of the wastewater and ground water was envisioned. , A yearly average of 44 inches of rain falls on St. Croix of which an estimated 90 percent is lost to evapotranspiration, about 6 percent becomes runoff and 4 percent recharges the ground water. Since the aquifer at. Negro Bay is exposed at the surface, rainfall was expected to have some effect on direct recharge. The Golden Grove site is within a broad alluvial valley where infiltration from an area of some six square miles upstream from the recharge site contributes to the ground water source. PROCEDURE Spreading basins and spray irrigation were used in the recharge operations. In Golden Grove six basins, each having a bottom. area of 10,000 square feet, were used on a rotating basis in order to maintain a wet-dry. cycle. The basins were excavated earthen ponds planted with Bermuda grass to promote bank stabilization, nutrient removal and percolation. Through- ‘out the project, a water depth of approximately 3.5 feet was maintained to permit natural surface aeration while minimiz-— ing evaporation losses and providing adequate head for rapid infiltration and percolation. Periodically, accumulated silt was scraped from the basin surface to maintain good infiltration rates. In the Negro Bay recharge area, two smaller spreading basins “were used. Each basin had a bottom area of approximately 2,500 square feet. In. addition to spreading basins, water was also recharged at Negro Bay by spray irrigation. The spray irrigation area was approximately 80,000 square feet. Recharging operations began in February 1974. Both quanta by of water recharged and rainfall at the sites were monitored. Monthly records were also kept of the static well. levels and several quality parameters of the effluent as well as the well water. Wells eA ee monitor the effects of the recharge operations were: located in the recharge areas while several wells in the vicinity not expected to be affected by recharging were monitored to serve as controls. The locations of the recharge areas and wells monitored are shown in Figure II. RESULTS AND DISCUSSION The recharge facility was initially in operation from Febru- ary 1974 until October 1974. In June 1974 operations were interrupted due to failure of one of the effluent pumps. In ‘October the Frederiksted service area was connected to the treatment plant. This resulted in’ recharge operations being halted because the town of Frederiksted, with its saltwater flush and fire fighting system, introduced about 0.08 mgd of saltwater causing a significant rise in the total dissolved solids (TDS) in the treated wastewater. Prior to this, the treatment facility serviced only the mid-island area of “St. Croix. By March 1976, the saltwater system in Frederik= sted was converted to potable. water and recharge operations continued. In April 1976, the effluent force main was broken-> but recharge operations resumed in May. In August 1977 the 'Christiansted collection system was completed and connected to. the treatment facility. Again, high chlorides in the effluent necessitated one SuEP Sheen of the project. Artificial yecharging in the —— Bay area was discontinued after August 1974 because the soil is unfavorable for recharge basin structures. During dry periods almost all. of the water applied was lost to evapotranspiration and there was no badLdap in the ground water. Most recently a splitter icom,: Soetieatet to separate the Chris- tiansted waste stream with its high chloride concentration from the other waste streams with an acceptable level of chloride, was installed at the reclamation plant. It is expected that recharging will resume shortly. 1\\\ pn Oo OG 22 qe W as i te s2z co _— =< eo Wg oa Ww Sy na ne Se ey a ce > w tke bg mm @ al sx o2d re co — Wi uy i JQ ao IN ~cc >> OW 27° ie » 1 =20 =F ™ Je OF ae ae “ i A it} 4, an 4 ow ul Ox oc fu =o i o> uw ¢ n 7,\ uz uy WW eS fe —O \ SO sc w! Za» i ae) ola i | Oe) Weg S r W, ( —Z eu IO%5 z<t te li —- fon?) zr 1] aD ok Hy ) oe wz M Oz Vico \ Ns. Mu .oO Os Nay XJ vw 0 All SU) L 20 M2 uwO Zz... oe ii) & AAV) & f 0) 2 ie is eo K/ Cu 2 © t HIS —) Ow fi ae 19 = fay i git allt oo i —-9 == =— 0 & ii of er == vi oO. oO5 Ep] it} a << i) ae > Ay ~ uw Sau \ Ooo Ss) “ aa oo oe ae Lt uw Ye 3 @ Ane eer AS. ov OL no rae) i ww as) wo > o oe Ce <Log Qo fon £) —— o.\.9 QO Ls N & wf a7 S/S AP, “DQ UY Le) An estimate of the amount of recharge water reaching the ground water during the 1l6-month period from March 1976 to July 1977 may be made. Puring this period 53.31 mil- lion gallons of effluent wereapplied to the recharge areas. Since the six spreading basins were used on a rotating basis, we will assume that at any given time half of the basins (30,000 sq. ft.) were covered with water. To deter- mine the depth of water applied over the 16-month period. it is first necessary to convert the total water applied .to cubic feet. 53,310,000 gals. x 0.134 cu. ft./gal.. = 7,143,540 cu. ft. The depth of water over the area then is: 7,143,540 cu. ft. = 30,000 sq. ft. © = 238.12 ft. The rainfall at the area must be considered. For this very ' rough estimate, the Virgin Isiands average rainfall of 44 inches per year will be used. For a 16-month period this amounts to 4.89 ft. Depth of water added to the area then becomes: 238.12 ft. + 4.89 ft. = 243.01 ft. According to Bowden (1968) the annual pan evaporation in the Virgin Islands is 70 inches (5.83 feet) or 7.78 feet in 16- months. This amount lost must be subtracted from the depth of water added. 243.01 ft. - 7.78 ft. 235.23 ft. Over the recharge area of 30,000 square feet this amounts to 7,056,900 cubic feet or 52, 785, 612 gallons. In the 16-month perid during which 53.31 million ‘gallons of water was recharged, assuming normal rainfall and evaporation, approxi- mately 52.79 million gallons of water were added to the ground water in the recharge area. Figures III-VII illustrate the effects of the recharge opera- tions on the static well levels for 1976 and 1977. From the map of the site, Figure II, it. can be seen that well PW-8 ® ETT Figure Effect of Recharge Operations on Project Well PW-8 (suoT{Teb uot{{ tw) adreyoai Static leve a n 4 i. ee | i 1 N N eat ce as 264 244 12 (98F) TeaaatT aeqey 104 1978 1977. 1976 Time IV Figure Effect of Recharge Operations on Project Well PY-9 “(suottTeb UOTTTTH) ) asreyoes AUF pasn Ja,eMeISEM pawTeToer jo ART uenb ATUQuUoW 1976 yt 4 r A J. A [o.@) Ne} —t N Oo io.@] cd mat a) ot rd (39883) [eaeT TaqeM 1978 1977 . Time V Figure Effect of. Recharge Operations on Control Well A-18 (suoTTeb UOT{TTW) adsgzeyoel 10j pasn 1ajenajsen. peupzetoes jo AqzqQuenb ATYuAuOy ‘Static level (1803) ToAeft zaaeM 1978 1977 1976 ’ Time: LO Figure VI (suo[TTeb uotT{tw) asreyoer ~ , OF PSSN Aajemajsem pewpepToer Jo AQF Quenb ATYQuUoOW Effect of Recharge Operations on Control Well GG-7 i ap / es ; “ee ~). V 304. 28+ 4 N (oa) 38+ 364 34h (9283) TeAoT A97eM 1978 1977. 1976 Time 11 VII Figure Effect of Recharge Operations on Control Well FP-2 (suoTTeb uoTTT tw) — agreyoe1r 1OjZ pasn JsazeMaISseM powfeTose1 Jo Aqyzquenb ATyQuoy = -f —? <q «4 Static leve 304 281. 26L 244 (3393) TeAeT 19984 1978 1976 ~1977 Time 12 and PW-9 are located in the. Golden Grove recharge area and are expected to be influenced by the recharging while wells A-18, GG-7 and FP-2 should not be affected. Well A-18 is about 3,500 feet above the recharge area while wells GG-7 and FP-2 are below the recharge area. The curves of the static well levels of the control wells (A-18, GG-7 and FP_ 2) approximate the same shape showing the influence of rainfall during the project period. Rainfall for 1976 and 1977 is plotted in Figure VIII. : . 7 -It is worthwhile to look in detail at two of. the most signi- ficant quality parameters. - Figure IX shows a comparison of chloride levels in the treated effluent and in samples obtained from the project wells PW-1 and PW-4. Table I lists these levels as well as those for the control wells A-16 and FP-8. The mean level of chlorides observed in the treated effluent was 417 mg/l while in PW-1l and PW-4 the mean levels were 285 and 281 mg/l respectively. Unfortunately, data was not col- lected prior to the start of the recharging operations so it is not possible to say definitely if and to what degree recharging of treated effluent raised or lowered chloride levels in the project wells. The control wells, A-16 and FP-~8, showed average chloride of 163 and 582 mg/l respectively. This at least permits the conclusion to be made tha the chloride levels in wells in the recharge area are not higher or lower than the chloride levels a wells not in the recharge area. Another interesting parameter to examine is nitrates. While the effluent had an average’ nitrate level of 17.5 mg/l, the average levels of nitrate in wells PW-1 and PW-8 were signi- ficantly lower at 3.8 and 2.6 mg/l respectively. This occur-- rence, reduction in nitrate levels of recharge water, has - been observed elsewhere (Clark, 1977:765) and has been attri- buted to denitrification mainly by the vegetative cover of the ground surface. Figure X graphs the nitrate levels in the effluent and in the observation wells PW-1 and PWw-4. Table II through Table V show the characteristics of the effluent used for recharging, the water of the three wells in the project area (PW-1, PW-4 and PW-8) as well as the water of control wells A-16, FP-8 and GG-8. In many instances the © water obtianed from the project wells was of better quality _ than the water used for recharging or water form the apaened wells. The costs associated with the production and recovery of reclaimed water by ground water recharge are listed in Table VI. The total cost (production and recovery) of reclaimed 13 VIII Figure iy Hy ry ri - Golden Grove 15 ‘ Kingshiit + + 10 ad fy an run as Le -e Vv ¥ Bs v bf i 1976 1977 1978 Time Monthly rainfall data for Golden Grove and Kingshill in St. Croix from September 1973 8 HeseGaes 1978 14 TABLE i Chloride Levels® Observed in Reclamation Project Effluent PW-1 b a 16" pweaP FP-8° 326 300 300 160 610 Sept eA 16 Oct. 310 390 270 150 560 oad 300 280 160 310 Hin 365 300 Dec. 290 Jan. 1977 366 320 310 Feb. 396 270 270 185 480 March 426 300 600 305 464 234 April 301 701 May . 300 280 June 258 300 665 July 531 290 305 650 320 Aug. 300 175 Sept. 570 270 300 115 428 212 Oct. 293 550 172 Noy. Dec. Jan. 1978° 270 300 180 650 300 Feb. 210 160 670 March April 230 170 545 Scontrol Well 4In mg/l ‘Pproject Well 15 (mg/1) Chloride’ > Oo (=>) 600+ 500 300) .Figure IX Comparison of Chloride Levels in Project Wells and Treated Effluent oe» Effluent -—— —~- Project Well 1 a: 7 —————- Project Well 4 ~ foe) ™ ~ a . a ri Time rq G c © i Kh Lp 16— Figure Xx Comparison of Nitrate Levels in Bo pet Wells and TEBRPEE Effluent gut. ae BEElvent —_— Project Well 1 feat Project Well 4 pH Gr us eal cd ne x “7 17 “TABLE | II Hardness Levels® Observed in Reclamation Project Effluent pw-12 Ss pw-aP A-16° | FB-8° Sept. 1976 | 280 372 268 456 “oct. ae | 456 ~~ . 360 268 384 Nov. da , 416 Sage Pape. 324 Dec. ee dag sg? 98g Jan. 1977... 248 392 356 Feb. 154 398372 284 352 March - 190 . 460 360 . 430 April os 4194 - 384 — 388 . ; : “424 May | | 388 360 , , June . . , 396 385 . 416 July 297. . 452 ~~ ~~ 380 410 Aug. : ne 384372 260 420 Sept. . | 416 384 | 222 388 Oct. or 3ga 380 268 384 Nov. , Dec. Jan. 1978 376 388 248 420 Feb. 308 416 292 ana March’ = | ] . - April , , . 394 276 400 Arney/ as C00, bppojent Well | Ccontrol Well i8 - TABLE III Turbidity Levels Observed in Reclamation Project Effluent pw-15 pw-4b hake? FP-8g¢ Sept. 1976 0.29 0.18 0.16 0.13 ad Oct: 0.48 Nov. 0.46 0.42 0.26 2.6 0.57 Dec. 0.28 0.20 0.15 0.18 Jan. 1977 0.60 0.22 Feb, 0.55 0.23 0.39 0.44 0.41 Hanah, 0.26 0.23 0.32 Dl Apréi 0.19 0.26 0.27 0-24 0.50 May 0.20 June 0.28 0.22 July 0.39 0.23 0.18 0.16 Aug. 0.25 0.19 0.36 0.26 Sept. 0.26 0.22 0.22 Oct. 0.31 0.43 0.42 0.16 Nov. Dec Jan 1978 0.19 0.38 2.4 0.19 Feb 0.32 0.34 1.5 a, 30 March April 0.41 0.91. 0.28 ain Turbidity Units bproject control Well 19 TABLE “IV Conductivity@. Observed in Reclamation Project pw-12- ere A-16° FP-8c BETTueAt 1700 1800 1300 2800 Sept. 1976 1600 1300 2600 Oct. 1500 1700 siov 1200 1550 1700 1300 1750 1207 1550 Dec 1700 Jan 1977 1650 1750 1190 1700 2620 1350 2450 Feb 1314 March 1710 1750 1880 3000 1460 1590 1700 2880 April May 1800 1800 1600 1300 2890 gune July 1750 1900 2990 1794 1675 1360 Aug. 1800 one Sept. 2220 1550 3400 2500 1700 2000 1600 3000 Oct Nov Dec Jan 1978 2700 3100 2350 5000 2300 5500 Feb 2750 3000 1800 1400 2600 March aumhos/om? at 25°C bproject Well Craaeral Well 20 TABLE V Nitrate Levels cbseiven in Reclamation Project Effluent pw-1) pw-4b A-16¢ FP=-8° Sept 19.76 4.9 3.6 17 2.2 a0'8 Oct 16 8.6 Ge 2 2 3.4 2.4 Nov L7 7.8 2.4 ve Cc Jan 19 5.4 2.4 rl Feb 23 10.0 15.4 (“1467 March 25 3B» ds Ze Le? April 23 3.2 2.2 3.1 2.6 May ; 1.9 June 2.6 1.9 ko 7 July 3.4 1.3 1.5 1:5 Aug. 0.3 0.3 0.3 Sept. 0.1 Oct 3.5 2.5 1.8 Nov Dec Jan 1978 2 oo 5 1.8 0.2 Feb 3.7 3.2 4.0 March 3:39 Byett 3.1 aNO3-N mg/1 bproject Well . control Well 21 ‘TABLE VI. lEstimated Costs for the Production and Recovery of Reclaimed Wastewater by Ground Water Recharge > PROCUDTION-ANNUAL costs I. Depreciation (20-YR, straight-line) “ : Initial Cost $800,000 S$. 40,000 Phase 1 Improvements — 30,000 1,500 . Total Depreciation — . $ 41,500 II. MAINTENANCE AND. REPAIR _ a | - 36,000 III. LABOR we 8 22,400° $ 22,400 Project Director —«a Plant Superintendent ' @ 16,800 - 16,800 Chief Operator @ 11,500 11,500 Operator @. ~ 9,775 -19,600 Operator Trainee @ 8,050 | * 16,100 Chemist .@ 13,440 , ~ 13,400 Secretary -@ 8,050 4,000 . Labor. Subtoal , a 103.800. i>, Percent Fringe Benefits «0 - 215,570 Total Labor . - 119,370 TOTAL ANNUAL ‘COST $196,870. PRODUCTION-UNIT COSTS ($/Thousand Gal, ) The annual cost on a unit basis with 15 percent downtime =| . . $ 1.27 Coagulant-aluminum sulfate, 50 mg/1lb> ‘a @ $1.20/1b .084 Chlorine, 20 mg/l @ $0.50/1b -084 Power oi . Joe 330 Total Production Costs a $1.74 Recovery-Unit Costs ($/thousjand gal.) If 85 percent of recharged water is recovered by wells 2.04 Cost of ground water recovery> 0.30 Total Cost-Production and recovery ($/thousand gal.) $2.34 Based on Buros, 1976b, p. 121 Includes operation of the recharge facilities Includes all costs of aérilidng -oparating “the wells WN Fe eo 8 8 22 water at the AWWTP, as it is being operated now with.a pro- duction capacity of 0.5 mgd, .is estimated to be $2.34 per thousand gallons. This compares favorably with the price of desalted water ($15 per thousand gallons and cistern water $20 per thousand gallons). As production « capacity of the treatment plant increases, costs - will decrease. With a plant production capacity of 0.75 mgd, cost of reclaimed water is expected to decrease to $2.10 per thousand gallons and with a production capacity of 1 mgd, ‘cost will be $2.01 per thousand gallons. However, it must be kept in mind that as plant production increases the limiting factor becomes the capacity of the recharge areas. At some point the capacity of the aquifer will be exceeded and will not be able to accept additional treated effluent. The cost of reclaimed water will be lowered if: processing beyond primary treatment becomes required at the waste treatment plant before discharge. Once secondary treatment is required, Buros (1976b) estimates that costs attributable to reuse will drop by about 75 percent. Use of the treated. effluent for intermediate purposes before it becomes ground water (sequential use) promises to reduce the cost of recharge/recovery operations even further. Some © of these intermediate uses have been determined to be irriga- tion, clam culture and pisciculture. Detailed investigation — of these sequential uses were intended to be part of this study. Problems associated with power outages, equipment failure. and insufficient wastewater available for treatment curtailed the extent of the study, yet what was. done indicates that reclamation of wastewater is economically feasible even without Saquevilal use. 23 BIBLIOGRAPHY Bowden, M.J. et al., 1970. "Climate, Water Balance and Climate. Change in the North-West Virgin Islands," St. Thomas:: Carib- bean Research Institute. Buros, O.K., 1976a. "A Water Management Plan for St. Croix, U.S. Virgin Islands," Gainesville, Florida: Black, Crow & Eidsness, Inc. Buros, O.K., 1976b. "Wastewater Reclamation Project, St. Croix, U.S. Virgin Islands," Cincinnati: Environmental Protection Agency. me Buros, O.K., 1976c. "Water Reuse and Conservation in the Virgin Islands," Desalination Vol. 23, pp. 485-494. Clark, John W., Hammer, Mark J., and Viessman, Warren, 1977. Water Supply & Pollution Control, New York: Thomas Y. Crowell Company, Inc. _ * Jordan, D.G., 1975. "A Survey of the Water Resources of St. Croix, Virgin Islands," U.S.G.S. Caribbean District open-file Report, San Juan, Puerto Rico... Metcalf & Eddy, Inc., 1972. Wastewater Engineering, New York: -McGraw-Hill Book Company. 24