DRAWINGS INCLUDED IN THIS PACKAGE
PROJECT DRAWINGS INCLUDED IN THIS PACKAGE DRAWING # DRAWING NAME ONE LINE DIAGRAM (PHASE 3) GENERAL CONSTRUCTION NOTES & ABBREVIATIONS ST-20131-9A3-G-100 ST-20131-9A3-E-100 ELECTRICAL ELECTRICAL DETAILS ST-20131-9A3-E-101 ST-20131-9A3-E-400 ST-20131-9A3-E-200 ELECTRICAL EQUIPMENT SCHEDULES ST-20131-9A3-E-300 FEEDER 9A DUCT BANK PLAN ST-20131-9A3-E-301 PROJECT LOCATION MAP: FEEDER 9A - PHASE 3 FEEDER 9A DUCT BANK PLAN ISSUE FOR CZM APPLICATION ISSUE A: 06.12.2023 GROUNDING DETAILS ST-20131-9A3-E-104 ST-20131-9A3-TC-100 TRAFFIC CONTROL DETAILS ST-20131-9A3-TC-101 TRAFFIC CONTROL SYMBOLS & DETAILS GENERAL CONSTRUCTION DETAILS ST-20131-9A3-G-101 TRAFFIC CONTROL GENERAL DUCT BANK DETAILS ST-20131-9A3-E-103 STANDARD MANHOLE & HANDHOLE DETAILS ST-20131-9A3-E-102 SWITCHGEAR, SECTIONALIZING CABINET AND TRANSFORMER PAD DETAILS ENLARGED PROJECT LOCATION MAP: FEEDER 9A - PHASE 3 ENGINEER: ENLARGED SCOPE OF WORK: FEEDER 9A - PHASE 3 LATITUDE: 18.3329125 LONGITUDE: -64.9622551 PHASE 3 START POINT LATITUDE: 18.342272 LONGITUDE: -64.927613 PHASE 3 END POINT CHARLOTTE AMALIE PROJECT LOCATION: FEEDER …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpnr.vi.gov/wp-content/uploads/2025/01/Feeder-9A-Phase-3-CZM-Application-06-12-23.pdf
SHA-256 3c26eee795dcf9896862d1cae39831aa0266a5fdfd6f9e5aa126f0973b4c6557
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-3c26eee795dc
Document text
PROJECT DRAWINGS INCLUDED IN THIS PACKAGE DRAWING # DRAWING NAME ONE LINE DIAGRAM (PHASE 3) GENERAL CONSTRUCTION NOTES & ABBREVIATIONS ST-20131-9A3-G-100 ST-20131-9A3-E-100 ELECTRICAL ELECTRICAL DETAILS ST-20131-9A3-E-101 ST-20131-9A3-E-400 ST-20131-9A3-E-200 ELECTRICAL EQUIPMENT SCHEDULES ST-20131-9A3-E-300 FEEDER 9A DUCT BANK PLAN ST-20131-9A3-E-301 PROJECT LOCATION MAP: FEEDER 9A - PHASE 3 FEEDER 9A DUCT BANK PLAN ISSUE FOR CZM APPLICATION ISSUE A: 06.12.2023 GROUNDING DETAILS ST-20131-9A3-E-104 ST-20131-9A3-TC-100 TRAFFIC CONTROL DETAILS ST-20131-9A3-TC-101 TRAFFIC CONTROL SYMBOLS & DETAILS GENERAL CONSTRUCTION DETAILS ST-20131-9A3-G-101 TRAFFIC CONTROL GENERAL DUCT BANK DETAILS ST-20131-9A3-E-103 STANDARD MANHOLE & HANDHOLE DETAILS ST-20131-9A3-E-102 SWITCHGEAR, SECTIONALIZING CABINET AND TRANSFORMER PAD DETAILS ENLARGED PROJECT LOCATION MAP: FEEDER 9A - PHASE 3 ENGINEER: ENLARGED SCOPE OF WORK: FEEDER 9A - PHASE 3 LATITUDE: 18.3329125 LONGITUDE: -64.9622551 PHASE 3 START POINT LATITUDE: 18.342272 LONGITUDE: -64.927613 PHASE 3 END POINT CHARLOTTE AMALIE PROJECT LOCATION: FEEDER 9A - PHASE 3 OWNER: ENGINEER: 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Y A P D O N R A R I T O H E W U T I N G R I V W I D S A T R E A L S N METHOD OF PROCEDURE ("M.O.P.") OWNER FURNISHED EQUIPMENT: ELECTRICAL TESTING REQUIREMENTS STT-20131-9A3-G-100 GENERAL CONSTRUCTION NOTES & ABBREVIATIONS 2022 FXB, Inc C T I A : T E R 9 G I R I S ' L A S I N N ' 3 N A : + 2 T U E R A 2 R < Engineers Seal Date: Chk'd By: Drawn By: Scale: Drawing Title: Drawing Number: Issue / Revisions: # Date Description Project Number: PJB PJB 06.12.2023 As Noted Project Name: Client: VIT 20131 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Charlotte Amalie Underground Electrical Construction Project (Feeder 9A Phase 3), St Thomas, USVI A 06/12/23 Issue for CZM Application LOAN & SEED DETAIL EXCAVATION AND ROAD RESTORATION NOTES BOLLARD DETAIL CONCRETE SIDEWALK REPLACEMENT DETAIL CONCRETE SIDEWALK REPLACEMENT DETAIL LONGITUDINAL VIEW CONCRETE CURB REPLACEMENT BITUMINOUS PAVEMENT RESTORATION DETAIL CONCRETE / ASPHALT ROADWAY REPLACEMENT DETAIL SECTION VIEW CONCRETE ROADWAY REPLACEMENT DETAIL LONGITUDINAL VIEW EXPANSION JOINT CONTROL JOINT GENERAL CONSTRUCTION DETAILS STT-20131-9A3-G-101 2022 FXB, Inc C T I A W T E R V G I R I S D L A S I N N D P N A W H O T U E R A O R Y Engineers Seal Date: Chk'd By: Drawn By: Scale: Drawing Title: Drawing Number: Issue / Revisions: # Date Description Project Number: NS/BM/CM/CC/PJB PJB 06.07.2023 As Noted Project Name: Client: VIT 20131 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Charlotte Amalie Underground Electrical Construction Project (Feeder 9A Phase 1 & 2), St Thomas, USVI A 06/24/22 Issue for EHP Review B 12/02/22 Issue for FEMA Review (75%) Engineer: C 04/21/23 Issue for 100% Review D 06/07/23 Issue for CZM Application SUMP DETAIL WATER STOP DETAIL CABLE RACK - COMMUNICATIONS ENLARGED PLAN NON-METALLIC SCALE: NONE 1 2 3 4 4 5 TYPICAL MANHOLE ACCESSORY BILL OF MATERIAL (PER MANHOLE) 1 2 3 4 5 ITEM NUMBER MANUFACTURER CATALOG NUMBER DESCRIPTION QTY. TYPICAL HANDHOLE ACCESSORY BILL OF MATERIAL (PER HANDHOLE) NON-METALLIC CABLE RACK ENLARGED PLAN 1 2 3 4 5 6 STT-20131-9A3-E-100 ELECTRICAL DETAILS 2022 FXB, Inc C T I A W T E R 9 G I R I S D L A S I N N D P N A W H O T U E R A O R Y Engineers Seal Date: Chk'd By: Drawn By: Scale: Drawing Title: Drawing Number: Issue / Revisions: # Date Description Project Number: PJB PJB 06.12.2023 As Noted Project Name: Client: VIT 20131 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Charlotte Amalie Underground Electrical Construction Project (Feeder 9A Phase 3), St Thomas, USVI A 06/12/23 Issue for CZM Application MANHOLE - TOP VIEW MANHOLE - TOP VIEW (COVER REMOVED) MANHOLE GENERAL NOTES SECTION "A-A" INTERFACE DETAIL DUCT BANK TO MANHOLE CROSS SECTION "B-B" MANHOLE DETAIL MANHOLE DETAIL · · · · · · · · · MANHOLE - TOP VIEW (W/CABLES) TOP VIEW NTS COMMUNICATIONS HANDHOLE PLAN VIEW SCALE: 1/2" = 1'-0" TYPICAL COMMUNICATIONS HANDHOLE SECTION C-C SCALE: 1/2" = 1'-0" COMMUNICATIONS HANDHOLE STANDARD MANHOLE & HANDHOLE DETAILS 2022 FXB, Inc C T I A W T E R V G I R I S D L A S I N N D P N A W H O T U E R A O R Y Engineers Seal Date: Chk'd By: Drawn By: Scale: Drawing Title: Drawing Number: Issue / Revisions: # Date Description Project Number: PJB PJB 06.12.2023 As Noted Project Name: Client: VIT 20131 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Charlotte Amalie Underground Electrical Construction Project (Feeder 9A Phase 3), St Thomas, USVI A 06/12/23 Issue for CZM Application STT-20131-9A3-E-101 CONCRETE PAD NOTES SWITCHGEAR, SECTIONALIZING CABINET AND TRANSFORMER PAD DETAILS 2022 FXB, Inc C T , A : T E R 9 * , R , S D / A S , N N D P N A : + O T 8 E R A O R < Engineers Seal Date: Chk'd By: Drawn By: Scale: Drawing Title: Drawing Number: Issue / Revisions: # Date Description Project Number: PJB PJB 06.12.2023 As Noted Project Name: Client: VIT 20131 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Charlotte Amalie Underground Electrical Construction Project (Feeder 9A Phase 3), St Thomas, USVI A 06/12/23 Issue for CZM Application STT-20131-9A3-E-102 INSTALLATION DETAIL POLYMER HANDHOLE COMMUNICATIONS HANDHOLE GENERAL NOTES · · · · · · · · CONCRETE PAD NOTES SECTION D-D TOP VIEW NTS SCALE: 1/2" = 1'-0" ELECTRIC SECONDARY HANDHOLE ELECTRIC HANDHOLE PLAN VIEW SCALE: 1/2" = 1'-0" TYPICAL ELECTRIC SECONDARY HANDHOLE ELECTRIC TOP VIEW NTS ELECTRIC PRIMARY HANDHOLE PLAN VIEW SCALE: 1/2" = 1'-0" TYPICAL ELECTRIC PRIMARY HANDHOLE ELECTRIC DUCT BANK DETAILS 2022 FXB, Inc C T I A W T E R V G I R I S D L A S I N N D P N A W H O T U E R A O R Y Engineers Seal Date: Chk'd By: Drawn By: Scale: Drawing Title: Drawing Number: Issue / Revisions: # Date Description Project Number: PJB PJB 06.12.2023 As Noted Project Name: Client: VIT 20131 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Charlotte Amalie Underground Electrical Construction Project (Feeder 9A Phase 3), St Thomas, USVI A 06/12/23 Issue for CZM Application STT-20131-9A3-E-103 GROUNDING NOTES GROUNDING SYSTEM BILL OF MATERIAL FOR GROUNDING DETAILS 2022 FXB, Inc C T I A : T E R 9 G I R I S D L A S I N N D 3 N A : + O T U E R A O R Y Engineers Seal Date: Chk'd By: Drawn By: Scale: Drawing Title: Drawing Number: Issue / Revisions: # Date Description Project Number: PJB PJB 06.12.2023 As Noted Project Name: Client: VIT 20131 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Charlotte Amalie Underground Electrical Construction Project (Feeder 9A Phase 3), St Thomas, USVI A 06/12/23 Issue for CZM Application STT-20131-9A3-E-104 0+00 1+00 2+00 3+00 4+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+ 2022 FXB, Inc C T I A W T E R V G I R I S D L A S I N N D P N A W H O T U E R A O R Y Engineers Seal Date: Chk'd By: Drawn By: Scale: Drawing Title: Drawing Number: Issue / Revisions: # Date Description Project Number: PJB PJB 06.12.2023 As Noted Project Name: Client: VIT 20131 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Charlotte Amalie Underground Electrical Construction Project (Feeder 9A Phase 3), St Thomas, USVI A 06/12/23 Issue for CZM Application FEEDER 9A DUCT BANK PLAN ST-20131-9A3-E-300 MATCH LINE - DRAWING ST-20131-9A-E-301 SCALE: 1" = 50' - 0" DUCT BANK PLAN +00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 2022 FXB, Inc C T I A W T E R V G I R I S D L A S I N N D P N A W H O T U E R A O R Y Engineers Seal Date: Chk'd By: Drawn By: Scale: Drawing Title: Drawing Number: Issue / Revisions: # Date Description Project Number: PJB PJB 06.12.2023 As Noted Project Name: Client: VIT 20131 5 C h r i s t y D r i v e , S u i t e 3 0 7 C h a d d s F o r d , P A 1 9 3 1 7 6 1 0 . 5 5 8 . 3 4 6 4 o f f i c e w w w . f x b i n c . c o m Engineering Excellence Since 1968 Charlotte Amalie Underground Electrical Construction Project (Feeder 9A Phase 3), St Thomas, USVI A 06/12/23 Issue for CZM Application FEEDER 9A DUCT BANK PLAN ST-20131-9A3-E-301 MATCH LINE - DRAWING ST-20131-9A-E-300 MATCH LINE - DRAWING ST-20131-9A-E-302 SCALE: 1" = 50' - 0" DUCT BANK PLAN