AMENDMENT FOUR 4 IFB034DPPC19 C
September 4, 2019 AMENDMENT FOUR (4) IFB034DPPC19 (C)- The Purchase and Installation of A/C systems in the Main Building located at 3274 Estate Richmond, St. Croix. INSERT: QUESTIONS AND ANSWERS QUESTION # 1: Will there be clarification on Seer rating? Answer: Yes, There Air Conditioners should have a 16-seer rating. QUESTION # 2: Will there be clarification on specific A/C Manufacturer? Answer: All Air condition units shall be Trane or equal. A.C unit must be approved by DPW engineer before installation. QUESTION #3: Will a plan view of the main building be provided with the square footage dimensions as discussed in the pre-bid meeting? Answer: At this moment we do not have a floor plan available, but I must emphasize that the area of the building is 6,336 S.F. QUESTION #4: Do subject contractors get paid 50 percent down or do they do the job up front? Answer: No. Payment is rendered upon project completion.
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpp.vi.gov/wp-content/uploads/2019/07/AMENDMENT-FOUR-4-IFB034DPPC19-C.pdf
SHA-256 3ff4efa68c05ecae7ad24e9a87885e37d27efc1ff5cb29da0475051b50de1a0f
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-3ff4efa68c05
Document text
September 4, 2019 AMENDMENT FOUR (4) IFB034DPPC19 (C)- The Purchase and Installation of A/C systems in the Main Building located at 3274 Estate Richmond, St. Croix. INSERT: QUESTIONS AND ANSWERS QUESTION # 1: Will there be clarification on Seer rating? Answer: Yes, There Air Conditioners should have a 16-seer rating. QUESTION # 2: Will there be clarification on specific A/C Manufacturer? Answer: All Air condition units shall be Trane or equal. A.C unit must be approved by DPW engineer before installation. QUESTION #3: Will a plan view of the main building be provided with the square footage dimensions as discussed in the pre-bid meeting? Answer: At this moment we do not have a floor plan available, but I must emphasize that the area of the building is 6,336 S.F. QUESTION #4: Do subject contractors get paid 50 percent down or do they do the job up front? Answer: No. Payment is rendered upon project completion.