VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

AMWNDMENT ONE1 IFB001DPWC17S

Collection
Contracts & Procurement
Sub-shelf
dpp.vi.gov (Property and Procurement contracts)
Kind
Contract
Date
2024-02-06
Topics
Procurement
Pages
4
Text
OCR Text

Department of Property & Procurement ==. em Government of the United States Virgin Islands 3274 ESTATE RICHMOND, CHRISTIANSTED, U. S. VIRGIN ISLANDS 00820 walt ial + ae 8201 SUB BASE, SUITE 4, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 0) ae ‘= STaTes ST. CROIX MAIN OFFICE: 340.773.1561 I ST. THOMAS MAIN OFFICE: 340.774.0828 ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.777.9587 HTTP://DPRVI.GOV AMENDMENT ONE (1) October 28, 2016 TO: SUBJECT: IFB001DPWC17(S) For the Construction of the Barren Spot Community Center, St. Croix INSERT: New Bid Sheet Dated October 26, 2016 DELETE: Old Bid Sheet Dated September 21, 2016 All other terms and conditions remain the same. A copy of this amendment must be returned with your bid. GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES DAVISON OF ENGINEERING PUBLIC WORKS DEPARTMENT 6002 Estate Anna's Hope Chiistiansied, St. Croix, VL 00870-4428 Tel. (640) 773-1290 Fax. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2016/10/AMWNDMENT-ONE1-IFB001DPWC17S.pdf

SHA-256 47eca3d3a8113a36aaca6f68aafeadb989d80f64de89903dcd67d1b098dff788

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-47eca3d3a811

Document text

Department of Property & Procurement ==. em Government of the United States Virgin Islands 3274 ESTATE RICHMOND, CHRISTIANSTED, U. S. VIRGIN ISLANDS 00820 walt ial + ae 8201 SUB BASE, SUITE 4, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 0) ae ‘= STaTes ST. CROIX MAIN OFFICE: 340.773.1561 I ST. THOMAS MAIN OFFICE: 340.774.0828 ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.777.9587 HTTP://DPRVI.GOV AMENDMENT ONE (1) October 28, 2016 TO: SUBJECT: IFB001DPWC17(S) For the Construction of the Barren Spot Community Center, St. Croix INSERT: New Bid Sheet Dated October 26, 2016 DELETE: Old Bid Sheet Dated September 21, 2016 All other terms and conditions remain the same. A copy of this amendment must be returned with your bid. GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES DAVISON OF ENGINEERING PUBLIC WORKS DEPARTMENT 6002 Estate Anna's Hope Chiistiansied, St. Croix, VL 00870-4428 Tel. (640) 773-1290 Fax. (340)773-6865 |PROJECT: Scope of Work for the Construction of the Barren Spot Community Center (Lr aes ey DATE: October 26, 2016 PREPARD BY: Eran Flemming ITEM DESCRIPTION OF WORK UNITS QUANTITY UNIT COST COST Construction of Cistern(21'Lx17Wx10) to include all 1 excavation, concrete, masonry units, forms manhole each 1 with covers and Theroseal Structural concrete slab (4000 PSI), in place, spread 2 |footing, including excavation of site, form, reinforcing C.Y 24 steel, vapor barrier and finishing 3 Structural concrete(4000psi) column in place, include cy 4 forms, reinforcing steel and finishing ‘ Structural concrete (4000psi) in place for bond beam, to 4 |. : ; orpesper CY 12 include reinforcing steel, form and finishing Concrete block, interior, tooled joints both sides, normal 5 |weight, 2000 psi, 6"x6"x16", include motar and each 1400 horizontal joint reinforcing every other course Concrete block, exterior, tooled joints both sides, 6 {normal weight, 2000 psi, 8"x8"x16", include motar and each 1500 horizontal joint reinforcing every other course 7 Concrete finishing, walls, float finish for entitire building S.F 6000 3 Paints & coatings building walls (concrete), primer and 2 SF 5800 coats, smooth finish - latex Paint 9 Paints & coatings ceilings (wood), primer and 2 coats, SF 2100 smooth finish - oil base paint 10 Hip Roof on wood frame with galvalume roofing panels SF 1650 26 gauge 11 __|Installation of Cove base (1x4) L.F 250 Purchase and installation of solid, birch, 1-3/8x6'- 12 8"x3'wide doors to include all frames, molding, lockset pach 5 and hardware. Door and molding shall be sanded and varnished to match base board 13 [Installation of molding to encase door frames L.F 120 | = f a! 4" i i. ite 14 instal ation of metal door (1-3/4"x3'x6'-8"high) , to each 3 include all frames, locksets and hardware 15 Purchase and installation of double hang window (4x3'). each 6 High impact Glass 16 Parehase and installation of double hang window (3x3') each 2 in kitchen. High impact glass sof 2efre Purchase and install 3x2, 5/8" fix wood louvers window 17 h in bathroom eat 2 18 Installation of floor tiles. Color will be chosen by owner SF 1350 Electrical wiring to include incoming service with meter base, running of all electrical conduit and 19 a ; S : S.F 1350 wiring. Installation of outlets, switches and panelboard per electrical plan for entire building 20 _|installation of Data & Telephone lines each 6 Purchase and installation of wall mounted LED 21 oo. each 4 exterior lights (150 watts) Installation of 180 CFM exhaust fans with light 22 |. . vy: each 6 fixture and duct to the exterior of building Interior pendent , globe with shade, LED Light a3" P & 8 each 10 fixture (150 watts) Purchase and Installation of new LED Emergency 24 Jexit lights, 2 watt, wall and ceiling mounted, each 2 double face 25 Installation of restrooms wall tiles (8"x8"). Color will be SF 600 chosen by owner 6 Purchase and installation of aluminum stock gutters, 6 LE 160 round 27 {down spout, 3" diameter L.F 40 construction kitchen base cabinets, hardwood 24" 28 |deep 35" high with back splash L.F 14 Construction of kitchen top cabinet, 12" wide 29 HSH Le 17 plastic laminated. Purchase & installation of counter top lavatories, 19" round, single bowl, vitreous china lavatory for the vanity 30 {cabinet in restrooms, including all caulking around the each 4 perimeter of the lavatory and fittings. 31 Purchase and installation of self closing polished chrome each 4 faucet in the restrooms. Purchase & installation of new surface mounted liquid 32 ; each 4 $0ap chrome dispenser in restrooms Purchase and installation of 5" stainless steel shelf, 33 mane each 2 48"x24" mirror in restrooms 34 Purchase and installation of stainless steel paper Towel ach 2 dispensers Purchase and installation of stainless steel doule toilet 35 ; each 4 paper dispensers Purchase & Installation of new floor mounted 36 jcommercial water closet. To include flushometer each 4 assembly. Installation of building water supply lines 1/2" and 37 |3/4" lines per plumbing plan including the L.S 1 connection to the cistern 38 Purchase & installation of 20 gallons water tank Ls 4 with water pump , 3g Installation of Septic System (Tank - 6'x10'x7') to Ls Fi include drain field and waste line for bathroom , Partitions and doors for four (4) restroom stalls. 40 |Aluminum finish. Please refer to plans for L.S 1 configuration Purchase & installation of a handicap grab bars 36" (1-1/4" diameter, stainless steel) for ADA 41 . . . each 4 restrooms one piece in each respective restroom. Purchase & installation of handicap grab bars 42" (1- 42 |1/4" diameter, stainless steel) in restrooms. one piece in each 4 Sach respective esto Tota] ========> Total Cost of the Project is Licensed Contractor Note: The undersigned Contractor acknowledges that the quantities included on the Bid Sheet are estimated values. It is the Contractor's responsibility to ascertain that the required material and quanties are included in the Bid Sheet in the event that there is a descrepency between what the Contractor estimates is required to complete said project. Any descrepancies in values or material required must be identified at the time of the Pre-Bid meeting. Once the contract is executed, the Contractor will be required to complete the project based on selected bidder's contractual agreement cost.