VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

ATERNATE LONG TERM HEALTH CARE ELDRA SHULTERBRANDT R1 91316 l

Collection
Contracts & Procurement
Sub-shelf
dpp.vi.gov (Property and Procurement contracts)
Kind
Contract
Island
St. Thomas
Date
2024-02-06
Pages
1
Text
Native Text

ITEM NO. DESCRIPTION EST. QUANITY UNIT UNIT PRICE TOTAL 1 ALTERNATIVE ENERGY PROPOSAL 1 LS 2 REPALCE ALL SUPPLY LINES COPPER PIPING AT ALL BATHROOM AND KITCHEN LOCATIONS WITH CPVC - 3/4" , 1/2" AND INSTALL TO FIXTURES COMPLETE 1 LS REPALCE ALL LIGHT FIXTURES TO LED FIXTURES TO MATCH EXISTING LOCATIONS 1 LS REPLACE ALL BATHRROM COUNTERTOPS AND INSTALL LAMINATE COUNTERTOPS 1 LS 3 BULK STORAGE l LS 4 PATIENT MONITORING SYTEM 1 LS 5 SECURITY UPGRADE FOR ACCESS CONTROL 1 LS 6 REPAIR PROPERTY BOUNDARY FENCING 1 LS DEMO REAR STEPS AND REPLACE WITH CONCRETE STEPS TO MATCH EXISTING 1 LS 7 SITE STAIRS CONNNECTING WALKWAYS l LS $ $ The total amount of this BID ALTERNATE proposal is based on the Contractor's Estimate of quantities and is as follows: $ Bidder's Signature Date 6A ANNA'S RETREAT ST.THOMAS SECTION 2: BID ALTERNATES SCHEDULE FOR CONSTRUCTION TELEPHONE: ALL BIDDERS ARE REQUIRE TO A MANDATORY PRE BID MEETING AND INSPECTION OF PROPERTY PRIOR TO SUBMITTING BIDS. FIELD VERIFY ALL QUANTITIES AND MEASUREMENTS. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2016/09/ATERNATE-LONG-TERM-HEALTH-CARE-ELDRA-SHULTERBRANDT-R1-91316-l.pdf

SHA-256 4932bdf01a1c270a05b852e765be15c22d4af8d2558ff892d8d4e31fcf2ffccb

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-4932bdf01a1c

Document text

ITEM NO. DESCRIPTION EST. QUANITY UNIT UNIT PRICE TOTAL 1 ALTERNATIVE ENERGY PROPOSAL 1 LS 2 REPALCE ALL SUPPLY LINES COPPER PIPING AT ALL BATHROOM AND KITCHEN LOCATIONS WITH CPVC - 3/4" , 1/2" AND INSTALL TO FIXTURES COMPLETE 1 LS REPALCE ALL LIGHT FIXTURES TO LED FIXTURES TO MATCH EXISTING LOCATIONS 1 LS REPLACE ALL BATHRROM COUNTERTOPS AND INSTALL LAMINATE COUNTERTOPS 1 LS 3 BULK STORAGE l LS 4 PATIENT MONITORING SYTEM 1 LS 5 SECURITY UPGRADE FOR ACCESS CONTROL 1 LS 6 REPAIR PROPERTY BOUNDARY FENCING 1 LS DEMO REAR STEPS AND REPLACE WITH CONCRETE STEPS TO MATCH EXISTING 1 LS 7 SITE STAIRS CONNNECTING WALKWAYS l LS $ $ The total amount of this BID ALTERNATE proposal is based on the Contractor's Estimate of quantities and is as follows: $ Bidder's Signature Date 6A ANNA'S RETREAT ST.THOMAS SECTION 2: BID ALTERNATES SCHEDULE FOR CONSTRUCTION TELEPHONE: ALL BIDDERS ARE REQUIRE TO A MANDATORY PRE BID MEETING AND INSPECTION OF PROPERTY PRIOR TO SUBMITTING BIDS. FIELD VERIFY ALL QUANTITIES AND MEASUREMENTS. ALTERNATE BID CONSTRUCTION TOTAL DEPARTMENT OF HEALTH: ELDRA SHULTERBRANDT LONG TERM CARE FACILITY CONTRACTOR'SNAME: Grant No . D12AP00349 (Vl-CIP-2012-3) GOVERNMENT OF THE UNITED STATES VIRGIN ISLANDS September 9 , 2016 ADDRESS: