REVISED BID SCHEDULE
` Item No. Description Quantity Units Unit Price Total 1 Mobilization 1 LS 2 Demolition 14000 SF 3 C-Panel Metal Roofing System: Purlins,Flashing 14000 SF 3/4" plywood sheathing, Ice and water shield membrane 1.5" rigid foam insulation, Faseners, closures rake trim, single ply membrane ,blocking,nailers ,etc 4 Aluminum Box Guttering 753 LF TOTAL BID SCHEDULE St. Thomas USVI PROJECT NAME: Department of Public Works Metal Roofing System Replacement
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpp.vi.gov/wp-content/uploads/2018/05/REVISED_BID-SCHEDULE.pdf
SHA-256 4c517045ea72158a03af77f478bec9560a53a94300c44c1adc74e8fdab4c41b7
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-4c517045ea72
Document text
` Item No. Description Quantity Units Unit Price Total 1 Mobilization 1 LS 2 Demolition 14000 SF 3 C-Panel Metal Roofing System: Purlins,Flashing 14000 SF 3/4" plywood sheathing, Ice and water shield membrane 1.5" rigid foam insulation, Faseners, closures rake trim, single ply membrane ,blocking,nailers ,etc 4 Aluminum Box Guttering 753 LF TOTAL BID SCHEDULE St. Thomas USVI PROJECT NAME: Department of Public Works Metal Roofing System Replacement