March 2, 2020 AMENDMENT FOUR (4) IFB024DOEC20 (C)- Construction and/or Repairs at Pearl B. Larsen K-8 School, Arthur A. Richards K-8 School and John H. Woodson Jr. High School, St. Croix, USVI INSERT: QUESTIONS AND ANSWERS Q. Can VIDE provide utility as built plans for facilities? A. VIDE does not have as built plans other than those provided in the bid package for the facilities showing the actual utility locations. Bidders are required to visit the sites and identify the closest required utility connection point to the respective modular installation location. Q. Will repairs to the office modular be required after joining sections? A. Bidders modular installation cost shall include all flashing and mating of office sections for the Fixed Asset and Information Technology modular offices to ensure a complete and watertight installation. Q. Will skirting be required at the base of the installed modular.? A. Yes, skirting will be required at the base of the installed modular. All other terms and conditions remain the same. A copy of this amendment must be returned with your bid.
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpp.vi.gov/wp-content/uploads/2020/02/AMENDMENT-FOUR-4-IFB024DOEC20-C.pdf
SHA-256 4f6f7c956a087a8f747ceb6dd5e60322ab244cce7626a3f85b2391702b91b7ae
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-4f6f7c956a08
Document text
March 2, 2020 AMENDMENT FOUR (4) IFB024DOEC20 (C)- Construction and/or Repairs at Pearl B. Larsen K-8 School, Arthur A. Richards K-8 School and John H. Woodson Jr. High School, St. Croix, USVI INSERT: QUESTIONS AND ANSWERS Q. Can VIDE provide utility as built plans for facilities? A. VIDE does not have as built plans other than those provided in the bid package for the facilities showing the actual utility locations. Bidders are required to visit the sites and identify the closest required utility connection point to the respective modular installation location. Q. Will repairs to the office modular be required after joining sections? A. Bidders modular installation cost shall include all flashing and mating of office sections for the Fixed Asset and Information Technology modular offices to ensure a complete and watertight installation. Q. Will skirting be required at the base of the installed modular.? A. Yes, skirting will be required at the base of the installed modular. All other terms and conditions remain the same. A copy of this amendment must be returned with your bid.