HHF LOCKHART ROOF PLAN MODEL
CERTIFIED AIR CONDITIONING CONTRACTOR SHALL INSPECT ALL EXISTING ROOT TOP UNIT TO DETERMINE WHETHER RTU(s) ARE FUNCTIONING PROPERLY AND IDENTIFY ANY NONE FUNCTIONING RTU UNITS TO HHF or Dept. of Education REPRESENTATIVES PRIOR TO REMOVAL OR REPLACEMENT OF SAID UNIT. CONTRACTOR SHALL INSPECT AND WATER TEST (7) EXISTING ROOF DRAINS FOR ANY DEFECTS IN FLASHING OR SEALANT. AND REPAIR AS REQUIRED. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS AND QUANTITY. VISIBLE SECTIONS OF NONE CONFORMING FLUID APPLIED MEMBRANE COATED ON TO SINGLE PLY MEMBRANE ROOFING (APPROXIMATELY 2,119 SQ. FT. ON NONE CONFORMING FLUID APPLIED MEMBRANE) SHALL BE REMOVED. CONTRACTOR TO FIELD VERIFY EXACT SQUARE FOOTAGE OF NONE CONFORMING FLUID APPLIED MEMBRANE TO BE REMOVED. VISIBLE SECTION OF SINGLE PLY MEMBRANE COMPLETELY DELAMINATED FROM PARAPET SUBSTRATE. 16’ ? 1» 98'—375 16’-83 | SN 3» hy 85° z) 16 AP Thy | SINGU Ply by, A/C SRN RTU #5 / A/C RTU #7 A/C RTU #6 A/C RTU to = A/C ROOF remain RTU #8 =* DRAIN ° ROOF DRAIN * DRAIN uc Me a RTU #1 | fl. 10 Ton A/C ~ ~ A/C | || RTU #9 to be RTU to |. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpp.vi.gov/wp-content/uploads/2016/12/HHF-LOCKHART-ROOF-PLAN-MODEL.pdf
SHA-256 50db0411b6ef7e1b4772adc213048531ce518f7baad58e04b0c42ffbc2099bad
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-50db0411b6ef
Document text
CERTIFIED AIR CONDITIONING CONTRACTOR SHALL INSPECT ALL EXISTING ROOT TOP UNIT TO DETERMINE WHETHER RTU(s) ARE FUNCTIONING PROPERLY AND IDENTIFY ANY NONE FUNCTIONING RTU UNITS TO HHF or Dept. of Education REPRESENTATIVES PRIOR TO REMOVAL OR REPLACEMENT OF SAID UNIT. CONTRACTOR SHALL INSPECT AND WATER TEST (7) EXISTING ROOF DRAINS FOR ANY DEFECTS IN FLASHING OR SEALANT. AND REPAIR AS REQUIRED. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS AND QUANTITY. VISIBLE SECTIONS OF NONE CONFORMING FLUID APPLIED MEMBRANE COATED ON TO SINGLE PLY MEMBRANE ROOFING (APPROXIMATELY 2,119 SQ. FT. ON NONE CONFORMING FLUID APPLIED MEMBRANE) SHALL BE REMOVED. CONTRACTOR TO FIELD VERIFY EXACT SQUARE FOOTAGE OF NONE CONFORMING FLUID APPLIED MEMBRANE TO BE REMOVED. VISIBLE SECTION OF SINGLE PLY MEMBRANE COMPLETELY DELAMINATED FROM PARAPET SUBSTRATE. 16’ ? 1» 98'—375 16’-83 | SN 3» hy 85° z) 16 AP Thy | SINGU Ply by, A/C SRN RTU #5 / A/C RTU #7 A/C RTU #6 A/C RTU to = A/C ROOF remain RTU #8 =* DRAIN ° ROOF DRAIN * DRAIN uc Me a RTU #1 | fl. 10 Ton A/C ~ ~ A/C | || RTU #9 to be RTU to |. _ J] removed and remain replaced with new & => & 10 Ton A/C 7 | = | Pp || A/C RTU #9 to be i * ROOF = A/C4 RTU #4 removed and | | DRAIN S RTU ||A/C replaced with new Las ROOF RTU #3 e ROOF DRAIN \ e DRAIN ROOF DRAIN APPROX. 5-3” HIGH PARAPET WALL WITH SINGLE PLY MEMBRANE XS z Nee fe $ O02 . ? ©) : Se ROOF AREA= APPROX. 7,467 SQ. FT. & O- APPROX. 5'-3” HIGH PARAPET WALL WITH SINGLE PLY MEMBRANE A 42’—319” 71-63% 24’ 50’ NOTE: THIS DRAWING IS A GRAPHIC REPRESENTATION OF THE EXISTING CONDITIONS. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, QUANTITIES AND CONDITIONS ETC. EXISTING 10 TON AIR CONDITION ROOF TOP UNITS TO BE REMOVED AND REPLACE WITH NEW A/C ROOF TOP UNIT WITH CORROSION PROTECTIVE COATING. A/C UNIT SHALL BE OF THE SAME TONNAGE, VOLTAGE, AMPERAGE, WEIGHT, COMPATIBLE TO BE INSTALLED ON EXISTING A/C ROOF CURB OPENING AND LISTED MANUFACTURER OR APPROVED EQUAL. NOTE CORROSION PROTECTING COATING SHALL BE APPLIED BY MANUFACTURER. EXISTING METAL CAP FLASHING CONTRACTOR SHALL INSPECT ALL TERMINATION BARS AROUND ALL EQUIPMENT CURBS, WALLS, PARAPET, VENTILATION PIPES, AND EXHAUST FANS. AND REPLACE OR REPAIR THOSE AREAS AS REQUIRED TO STOP LEAKS. (typical) LOCKAART ELEMENTARY SCHOOL NOTES: CONTRACTOR SHALL REMOVE ALL ROCK, LOOSE METAL, DEBRIS, FASTENERS, DERELICT PARTS, PLANTS OR TREES ETC. FROM EXISTING ROOF AND VACUUM SMALL METAL FRAGMENTS ETC. PRIOR TO POWER WASHING. CONTRACTOR SHALL NOT ALLOW ANY CLEANING AGENT OR CONTAMINATED WATER TO ENTER ANY CISTERNS OR WATER STORAGE TANKS DURING THE POWER WASHING PROCESS. MEANING ALL RAIN LEADERS CONNECTED TO ANY CISTERNS OR WATER STORAGE TANKS SHALL BE DISCONNECTED PRIOR TO CLEANING THE ROOF. CONTRACTOR SHALL REMOVE ALL FLUID MEMBRANE THAT WAS APPLIED ON TOP OF EXISTING SINGLE PLY MEMBRANE. AND REPAIR IDENTIFIED SECTIONS AS PER ROOFING MANUFACTURER’S SPECIFICATIONS. CONTRACTOR WILL BE HELD RESPONSIBLE FOR DRAINING AND CLEANING ANY CISTERN AFFECTED BECAUSE OF NEGLIGENCE AND REFILL SAID CISTERN WITH CLEAN DRINKING WATER AFTER ALL ROOF REPAIR HAS BEEN COMPLETED. CONTRACTOR SHALL POWER WASH APPROXIMATELY 9,278 SQUARE FEET OF EXISTING ROOF & PARAPET SURFACE AREA, THEN INSPECT EVERY SQUARE INCH OF THE ROOF & PARAPET FOR ANY DEFECTS IN THE SINGLE PLY MEMBRANE, TO INCLUDE PUNCTURES, CUTS, DELAMINATED SECTIONS, ETC. CONTRACTOR SHALL MARK OR IDENTIFY ALL DAMAGED, PUNCTURED OR DELAMINATED AREAS UPON DISCOVERY OF SAID AREAS. CONTRACTOR SHALL HIRE QUALIFIED AND CERTIFIED ROOFING CONTRACTORS TO UNDERGO ALL NECESSARY REPAIRS AS PER ROOFING MEMBRANE MANUFACTURE’S SPECIFICATIONS. 10. 12. 14. 15. CONTRACTOR SHALL INSPECT ALL EXISTING PATCHES AND SEAMS FOR ANY DEFECTS OR SEPARATIONS AND REPAIR AS PER ROOFING MANUFACTURER’S SPECIFICATIONS. CONTRACTOR SHALL INSPECT ALL ROOF DRAIN CONNECTIONS BOTH ABOVE AND BELOW EXISTING ROOFING ASSEMBLY, ASSURING THAT ALL EXISTING CONNECTIONS ARE SECURE AND FREE FROM DEFECTS. UPON DISCOVERY OF ANY DEFECTS CONTRACTOR SHALL REPAIR SAID CONNECTIONS, PIPING, ROOF DRAIN ETC. AS NECESSARY TO PREVENT ANY LEAKS. CONTRACTOR SHALL REPLACE ALL DAMAGED ROOF DRAIN SCREENS, STRAINERS OR DOME TO MATCH EXISTING OR BETTER. . CONTRACTOR SHALL INSPECT AROUND ALL ROOF PENETRATIONS SUCH AS AIR CONDITION PIPING, PVC ROOF VENTS, EXHAUST VENTS ETC. FOR ANY DEFECTS IN EXISTING THE SINGLE PLY MEMBRANE OR SEALANT AND REPAIR ANY SUCH DEFECTS AS PER ROOFING MANUFACTURER’S SPECIFICATIONS. CONTRACTOR SHALL INSPECT EXISTING SINGLE PLY MEMBRANE ON ALL RAISED SURFACES AND AROUND ANY ROOF OPENING FOR ANY DEFECTS IN THE EXISTING SINGLE PLY MEMBRANE. UPON DISCOVERY OF ANY DEFECTS, SUCH AS CUTS, PUNCTURES, DELAMINATION, ETC. THE CONTRACTOR SHALL REPAIR AS PER ROOFING MANUFACTURER'S SPECIFICATIONS. 5. CONTRACTOR SHALL REPAIR ANY SECTION OR PART OF ANY ROOFING MEMBRANE DAMAGED OR DELAMINATE CAUSED BY POWER WASHING. CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE DAMAGED OR STAINED ACOUSTIC CEILING TILES AND REPLACE WITH NEW IN KIND AS IDENTIFIED IN SCOPE OF WORK SHEET. CONTRACTOR SHALL REMOVE ALL EXISTING METAL PIPE SUPPORTS AND REPLACED WITH NEW CADDY PYRAMID SUPPORT BY ERICO COMPANY OR APPROVED EQUAL 16. AIR CONDITIONING CONTRACTOR SHALL CHECK ALL REFRIGERANT SRCROSED. WORK LINES FOR LEAKS AND PROPER INSULATION. 17. A/C CONTRACTOR SHALL DISPOSE OF ALL UNITS IDENTIFIED FOR REMOVAL AS PER VIRGIN ISLANDS LOCAL CODES. 18. A/C CONTRACTOR SHALL BALANCE ALL NEWLY INSTALLED AIR CONDITIONING UNITS AS REQUIRED 19. ALL REFRIGERANT LINES SHALL BE FLEVATED OFF SINGLE PLY MEMBRANE ROOFING USING THE APPROPRIATE CADDY PYRAMID SYSTEM OR EQUAL. KEY PLAN PROJECT I.D VIO102802 OIA Building Number O? SOW Building 213928 & 214008 Identification No. PHYSICAL DESCRIP TION BUILDINGS: ADMINISTRATION AND LIBRARY