Letter regarding attached Anticipated Schedule for August through November 1992 Tutu Service Station Investigation, St. Thomas, U.S. Virgin Islands

Collection
Federal Reference
Sub-shelf
EPA SEMS (Superfund, Region 2)
Kind
Government Report
Island
St. Thomas
Date
1992-11
Pages
2
Text
Native Text

GERAGHTY & MILLER, INC. Environmental Services Ground Water Engineering Hydrocarbon Remediation Education September 14, 1992 Caroline Kwan U.S. Environmental Agency 26 Federal Plaza New York, New York 10278 Re: Anticipated Schedule for August through November 1992 Tutu Service Station Investigation St. Thomas, U.S. Virgin Islands Dear Ms. Kwan: As we are nearing the completion of the drilling program for the above-referenced project, Geraghty & Miller, Inc. has projected the following schedule (see Table 1) for well development, ground-water sampling, and aquifer testing of the recently installed monitoring wells. This schedule is dependent upon development of all 19 monitoring wells by no later than September 19, 1992. If you have any questions, please call. Sincerely, GERAGHTY & MILLER, INC. Thomas V. Danahy Senior Scientist/Project Manager Daniel A. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://semspub.epa.gov/src/document/02/64879

SHA-256 6237264bdf9a7fdf271beb5831967e3635332ee700ff2597534c1b3f6997e484

Re-using this document

CERCLA administrative record

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-6237264bdf9a

Document text

GERAGHTY & MILLER, INC. Environmental Services Ground Water Engineering Hydrocarbon Remediation Education September 14, 1992 Caroline Kwan U.S. Environmental Agency 26 Federal Plaza New York, New York 10278 Re: Anticipated Schedule for August through November 1992 Tutu Service Station Investigation St. Thomas, U.S. Virgin Islands Dear Ms. Kwan: As we are nearing the completion of the drilling program for the above-referenced project, Geraghty & Miller, Inc. has projected the following schedule (see Table 1) for well development, ground-water sampling, and aquifer testing of the recently installed monitoring wells. This schedule is dependent upon development of all 19 monitoring wells by no later than September 19, 1992. If you have any questions, please call. Sincerely, GERAGHTY & MILLER, INC. Thomas V. Danahy Senior Scientist/Project Manager Daniel A. Nachman Vice President/Project Director Attachment c: Ana Gloria Ramos, TEIC Sally Odland, COM Federal Programs Laura Scalise, USEPA-MMB Jose Agrelot, Soil Tech TVD:nna #PR01301/082192.1tr TUT C»">6 1 7"^9 201 West Passaic Street, 3rd Floor• Rochelle Park, New Jersey 07662• (201) 909-0700'FAX (201) 909-0567/0568^,^1 O^ *64879* 64879 Table 1. Anticipated Schedule for August through November 1992, Tutu Service Station Investigation, St. Thomas, U.S. Virgin Islands. Date Activity August 24 - September 16 August 24 - September 18 September 14 - September 16 September 19 — September 27 Monday, September 28 September 28 - October 9 October 9 - October 14 October 15 - October 16 October 16 - October 28 Thursday, October 29 Friday, October 30 Monday, November 2 @ 10:00 a.m. Tuesday, November 3 @ 10:00 a.m. Friday, November 6 Monday, November 9 @ 10:00 a.m. Tuesday, November 10 @ 10:00 a.m. Finish monitoring well installation; including MW-2, MW-5, MW-6R (replacement well), and MW—9S (additional well); abandonment and sealing of MW-6. Development of 19 monitoring wells. The 7th sampling of existing supply wells (pursuant to Administrative Order No. II - CERCLA 00401 and RCRA - 90 - UST - 9003 - 0401). Allow monitoring wells to stabilize. Collect synoptic round of water-levels at all 19 monitoring wells. First ground-water sampling of all 19 monitoring wells. Long—term ground—water level recording to check for possible influence from pumping wells. Review long—term data. Coordinate/prepare for pumping test. Set-up water-level recorders for pre-pumping trend. 4-hour step-test at MW—9 or MW—10; record recovery. Set-up recorder for pre—pumping trend for November 2 test Start 24-hour pump test at MW-9 or MW—10; pumping rate to be determined from the results of October 30 step-test. End test; record recovery; data analysis. 4-hour step-test at MW- 10D; record recovery. Set—up recorder for pre-pumping trend for November 9 pump test. Start 24-hour pump test at MW- 10D; pumping rate to be determined from November 6 step-test. End test; record recovery. #PR01301/82192tbl.wk3 TUT O06 174O GERAGHTY & MILLER, INC.