VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

Revised Bid Schedule

Collection
Contracts & Procurement
Sub-shelf
dpp.vi.gov (Property and Procurement contracts)
Kind
Contract
Island
St. Thomas
Date
2024-02-06
Pages
1
Text
Native Text

NUMBERS No. DESCRIPTION UNITS QTY. UNIT PRICE TOTAL ($) FIRST FLOOR PLAN 1 MOBILIZATION LS 1.00 2 REMOVE AND REPLACE EXISTING FUR- LS 1.00 NITURE AND EQUIPMENT 3 REMOVE AND DISPOSE OF EXISTING CAR- SF 2,877.00 PET 4 REMOVE AND DISPOSE OF EXISTING CO-- LF 1,036.00 VE BASE 5 INSTALL NEW CERAMIC FLOOR TILES SF 2,877.00 ( 20" x 20" ) Tiles - Monteros A Beigge - CA 6 SCRAPE/SEALER OR APPROPRIATE PAINT SF 6,036.00 PAINT TWO COATS INTERIOR /EXTERIOR PARTITION WALLS TO MATCH EXISTING SECOND FLOOR PLAN 7 REMOVE AND REPLACE EXISTING FUR- LS 1.00 NITURE AND EQUIPMENT 8 REMOVE AND DISPOSE OF EXISTING CAR- SF 3,015.00 PET 9 REMOVE AND DISPOSE OF EXISTING COVE LF 700.00 BASE 10 INSTALL NEW PREMIUM PORCELAIN SF 3,015.00 ( 20" X 20" MONTEROSA BEIGE ) 11 SCRAPE/SEALER OR APPROPRIATE PAINT SF 5,800.00 PAINT TWO COATS INTERIOR / EXTERIOR PARTITION WALLS TO MATCH EXISTING TOTAL (NUMBERS) TOTAL (WORDS) DOLLARS and_________ Cents CONTRACTOR'S NAME:______________________________ CONTRACTOR'S SIGNATURE:_________________________ BID SCHEDULE GOVERNMENT OF THE VIRGIN ISLANDS INTERNAL REVENUE HEADQUARTERS EAST …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2020/03/Revised-Bid-Schedule.pdf

SHA-256 66a91344f9c034e1f2fe28b1d8063ef2b3b5847f75eb28448645fdf04ecff18c

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-66a91344f9c0

Document text

NUMBERS No. DESCRIPTION UNITS QTY. UNIT PRICE TOTAL ($) FIRST FLOOR PLAN 1 MOBILIZATION LS 1.00 2 REMOVE AND REPLACE EXISTING FUR- LS 1.00 NITURE AND EQUIPMENT 3 REMOVE AND DISPOSE OF EXISTING CAR- SF 2,877.00 PET 4 REMOVE AND DISPOSE OF EXISTING CO-- LF 1,036.00 VE BASE 5 INSTALL NEW CERAMIC FLOOR TILES SF 2,877.00 ( 20" x 20" ) Tiles - Monteros A Beigge - CA 6 SCRAPE/SEALER OR APPROPRIATE PAINT SF 6,036.00 PAINT TWO COATS INTERIOR /EXTERIOR PARTITION WALLS TO MATCH EXISTING SECOND FLOOR PLAN 7 REMOVE AND REPLACE EXISTING FUR- LS 1.00 NITURE AND EQUIPMENT 8 REMOVE AND DISPOSE OF EXISTING CAR- SF 3,015.00 PET 9 REMOVE AND DISPOSE OF EXISTING COVE LF 700.00 BASE 10 INSTALL NEW PREMIUM PORCELAIN SF 3,015.00 ( 20" X 20" MONTEROSA BEIGE ) 11 SCRAPE/SEALER OR APPROPRIATE PAINT SF 5,800.00 PAINT TWO COATS INTERIOR / EXTERIOR PARTITION WALLS TO MATCH EXISTING TOTAL (NUMBERS) TOTAL (WORDS) DOLLARS and_________ Cents CONTRACTOR'S NAME:______________________________ CONTRACTOR'S SIGNATURE:_________________________ BID SCHEDULE GOVERNMENT OF THE VIRGIN ISLANDS INTERNAL REVENUE HEADQUARTERS EAST END PLAZA, BLDG #2 PARCEL#17B St.Thomas, V.I.00802