Subject: Periodic Estimate for Partial Payment #6 Justification — 2016
Honorable Gustav James Commissioner, Virgin Islands Department of Public Works Government of the United States Virgin Islands Estate Anna’s Hope, Christiansted VI 00820 May 13. 2016 Subject: Periodic Estimate for Partial Payment #6 Justification Design-Build of Paul E. Joseph Stadium and Sports Complex Contract No. CO03SPRC1I5 Dear Commissioner James, The attached Periodic Estimate for Partial Payment #6 (PE 6) submitted by GEC, LLC (GEC) to the Government of the Virgin Islands (Government) for payment includes billing for 60% Construction Documents, which have been submitted to the Government. Sincerely, ence J, Richards, P.E., M.B.A. Managing Member Copy to: Honorable Pedro Cruz, Commissioner, Sports, Parks and Recreation Lloyd Bough, Chief of Contracting, V1 Department of Property and Procurement Vance Pinney, Capital Improvement Projects Engineering Administrator, Dept. of Public Works Tim Dempsey, Director of Operations, Coastal Systems — USVI GEC. LLC # . Box 1556 # rays nat we. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
SHA-256 676ca2d256b02bd24fab30286d059aee8288e746c32cb54a5d49a11fd6a28e21
Re-using this document
A proceeding of the Legislature of the Virgin Islands, open to the public under 3 V.I.C. § 881, which reaches any committee of any branch of government and permits the news media to publish what it records.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-676ca2d256b0
Document text
Honorable Gustav James Commissioner, Virgin Islands Department of Public Works Government of the United States Virgin Islands Estate Anna’s Hope, Christiansted VI 00820 May 13. 2016 Subject: Periodic Estimate for Partial Payment #6 Justification Design-Build of Paul E. Joseph Stadium and Sports Complex Contract No. CO03SPRC1I5 Dear Commissioner James, The attached Periodic Estimate for Partial Payment #6 (PE 6) submitted by GEC, LLC (GEC) to the Government of the Virgin Islands (Government) for payment includes billing for 60% Construction Documents, which have been submitted to the Government. Sincerely, ence J, Richards, P.E., M.B.A. Managing Member Copy to: Honorable Pedro Cruz, Commissioner, Sports, Parks and Recreation Lloyd Bough, Chief of Contracting, V1 Department of Property and Procurement Vance Pinney, Capital Improvement Projects Engineering Administrator, Dept. of Public Works Tim Dempsey, Director of Operations, Coastal Systems — USVI GEC. LLC # . Box 1556 # rays nat we. 10 Fa 4 océ thas Wits Jor 9 it a Honorable Gustav James Commissioner, Virgin Islands Department of Public Works Government of the United States Virgin Islands Estate Anna’s Hope, Christiansted VI 00820 May 13, 2016 fy - Subject: Project Status Periodic Report April 2016 Service Contract for Design-Build of Paul E. Joseph Stadium and Sports Complex (Lump Sum Contract Price) between Government of the Virgin Islands and GEC, LLC Revised for Change Order 1 to the Contract Contract No. CO03SPRC15 Dear Commissioner James, In accordance with Section 6(d) of the Service Contract the following periodic report summarizes project activities for April 2016. Demoliti Paul E. Joseph Stadium lights, carnival village light poles, and the Terrence Martin Field grandstand demolition completed February 2016. The grandstand and adjacent buildings were demolished in concurrence with the Phase II Archaeological Study undertaken by the University of Alabama's Office of Archaeological Research. Design GEC and the design team of SEHA and Populous initiated the development of the Construction Drawings through several iterations with the Government and Owner’s representative, Coastal Systems — USVI, which includes Architectural, MEP and Structural design. A Design Review meeting was held April 01, 2016 with the Government, Owner’s Representative, GEC, and Steven E. Hutchins Architects. Meeting minutes attached. Per the direction of the Owner’s representative the design excludes foundation and site design pending a determination of the Stadium site layout. Submittals See attached submittal log. GEC, LLC =P O Bor 1856 Kangol VIOO3S! = Tel 34677) 8215 Far 364 7 5 Subject: Project Status Periodic Report April 2016 May 13, 2016 Requests for Information See attached RFI log. Note that RFI #1 regarding the anticipated equipment for the concession areas remains unanswered. Schedute: Demolition complete. 60% CD’s submitted. Change Orders No. Description Status 1 Revise Contract from “GMP” to “Lump Sum” Approved 2 Stage 1 Field Work Phase II Arch. Study Approved 3 Additional geotechnical investigation Approved Periodic Estimates for Payment Periodic Estimate for Partial Payment #6 submitted by GEC to the Government Engineer May 13, 2016 includes billing for 60 % Construction Documents design completion. Please contact the undersigned if the preceding needs to be clarified. Sincerely, Copy to: Pedro Cruz, Commissioner, Dept. of Sports, Parks & Recreation Vance Pinney, Capital Improvement Projects Engineering Administrator, Dept. of Public Works Tim Dempsey, Director of Operations, Coastal Systems - USVI Nicholas Zwemer, Coastal Systems - USVI John R. Wessel, Managing Member, GEC, LLC GEC, LLC GEC, LLC PO Box 1656 St. Croix, Vi 00851 Ph : 340-778-0200 | Meeting Minutes | Job: 522-214 PAUL E. JOSEPH STADIUM Meeting: Design # 1 Location: Conference Room, Department of Public Works Date: 4/1/16 Start Time: 9:00:00AM | Attendees | Attended FP Honorable Gustav James (Department of Public wor Pedro Cruz (SPORTS, PARKS & RECREATION) W = Steve Hutchins (Steven E. Hutchins AIA) ¥ Vance Pinney (Department of Public works) ¥ Dennis Brow (Department of Public works) Tim Dempsey (Coastal Systems Vi) Nick Zwemer (Coastal Systems VI) V Larry Richards (GEC, LLC) | ttem Description Responsible Due Date Closed} New Business 1-4 Design Review Steve Hutchins presented the design and construction documents completed to date; construction documents are 45%. Roof design cantilevered government has concems with rain and coverage -can structural extend cantilever over seats? -can roof structures be lowered? Stadium orientation still under review and subject to geotechnical! analysis and land acquisitions; per (DB) stadium orientation is not an issue for the bailplayers; during a game players always impacted and no matter where you travel to play there Is always issues with the environment and sun. Government would like more open concourses and patios; that enhance open areas and views of the ocean. Open space design determined after multiple iterations of stadium and program evaluation. Per (PC) - no need for expanded views to ocean; fans do not need view. (TD) The overall development plan includes hotels etc. that will prevent views to ocean. Ensure easily maintain roll up doors consider chain pulls as opposed to electrical motors openers; Emergency backup power for entire facility inci. tights; as designed emergency generator is only for fire pumps. Increase minimum cistern size to100,000 gallons; cistem is not in the original program. Ensure roofs are pitched; no flat roofs slightly pitched Goverment wants individual seats as opposed to bench seats: consider 21 inch seats; GEC to provide options for seats with submittal process. Perimeter fence/wali -no chair-link -Need pad on outfield fencing -provide alternates to solid wall; SEHA to check with Populous for options Parking program minimum of 1000 spaces. Can Stadium be elevated to +10 and not elevate field? Potential savings for fill. Evaluate air-conditioning for tocker rooms. rc Job: 522-214 PAUL E. JOSEPH STADIUM Meeting: Design # 1 | ttem Description Responsible Due Date Closed | 1-2 Concession Program r Program has line item for equipment (See Attachment 1 to Appendix B of the Service Contract. Design team needs end user requirements including equipment and use. GEC to issue RFT. 1-3 Pay Estimate 5 r GEC submitted Pay Estimate 5 for processing and payment. 14 Change Order 3 cr GEC submitted change order 3 at the request of owners representative for additional geotechnical investigation. Meeting adjourned at 12:00. | Next meeting at on. | The preceding is assumed to be a complete and correct account of the items discussed, directions given, and conclusions drawn, unless this office is notified to the contrary by the next regular meeting. If no notification is received, these minutes will be deemed an accurate account of the meeting. Prepared by: Larry Richards Copy To: Submittal Log with Detail GEC, LLC Date: 5/6/2016 Include Closed Jobs; No Show: Alt §22-214 PAUL E. JOSEPH STADIUM Recelved Sent Returned Forwarded Number Rev Description Recelved From Date Date Date Date Remarks Status Due Date Due Date t i) PHASE I ARCHAEOLOGICAL Soltec intemational, INC YES 14/246 Resubmitted to Government per CO1 REPORT of Service Contract 10.(C}- 1 0 GEOTECHNICAL REPORT see App A Alt 1 -1.5.7; Soll Testing Report resubmitted to Gov't per CO1 VU24tt5. 11(B) - t 0 ENVIRONMENTAL ASSESSMENT App A atlachment 1 subsection 12.{A) - # 6 Plans for Permits Retated to the Submil to appropriate Governmental Phase Body. 12.,(8)-1 t+) Required Commencement Date Governmental Approvals Generally 12.4G) - 1 0 OOCUMENT SUBMITTAL Larry Richards (GEC, LLC) 1125/15 = 19/26/15 PROTOCOL 12,(K) - 1 0 Plans for Design/Bulld Work and Pre-Design Conference 14.(D)- 1 Qo NOTICE OF CHANGE 18.(J) + 1 6 Subcontractors proposed percentage mark-up for field overhead and fee 18.(F)- 1 0 Final Periodic Estimate for Payment 24.(B) - 1 Qo SUPPORTING DOCUMENTATION 4{C)A. - 1 0 CONTRACT SCHEDULE FOR EACH Lamy Richards (GEC, LLC) 1012415 = 10/23/15 Que within five (5) calendar days after PHASE receipt of the notice to proceed. —~ DEMO SCHEDULE 7.02} - t 0 Subconiracts and purchase orders for Materials and Equipment 7.453) - 1 0 List of Materials and Equipment Suppied from stock inventory 522-214 PAUL E. JOSEPH STADIUM Submittal Log with Detail GEC, LLC Date: 5/8/2016 Include Closed Jobs: No Show: All BIAKI)- 1 0 Listing of all major Matesials and Equipment 8.{A)(2) - 4 ) Performance data on Materials and Equipment B.(AX3)- 1 () Sample of Materials and Equipment 8.(HX{1) - 4 0 Manufacturer's standard samples of Materials and Equipment Ai(C)-1 t] Preliminary plans and prefiminary specifications by phase A14E)- 1 0 CONSTRUCTION DRAWINGS Al(s)-1 a (2) CERTIFIED SURVEYS Survey Services Company Wi4nisS = 11/24/16 As but and Topographic Survey; resubmitted to Government per CO1 A1-1.6.14- 1 o 30% COMPLETE CONSTRUCTION 266 Avrating response from Government. PLANS AND SCHEDULE OF AMOUNTS A1-1.6.14 - 2 Qo 60% COMPLETE CONSTRUCTION Steve Hutchins (Steven E. Hutchins AIA} 429/16 5/16 PLANS AND SCHEDULE OF AMOUNTS A1-1,5.3- 1 0 SCHEDULE OF AMOUNTS FOR Larry Richards (GEC, LLC) WWU2416 = 11/24HNG Approved. DEMOLITION AN-1.5.6- 14 0 DEMOLITION PERMITS Dept of Planning’ Natt Res. 12Neii4 = 11/245 Resubmitied to Government per CO1 of the Service Contract. A1-1.6.6- 1 0 MASTER DEVELOPMENT PLAN A1-1.6.6 - 2 ('] ABATEMENT TESTING REPORTS Al-4,5.7- 1 [') SUFFICIENCY OF WAPA WAPA (St. Croby 12/24 = (24/16 Resubmited to Government per CO1 ELECTRICAL SERVICE TO SITE o3 the Service Contract. A1-1.6.7 - 2 Qo SUFFICIENCY OF POTABLE WAPA (St Crotx) 11254 = 11/24/15 Resubmitted to Government par COt WATER SERVICE TO SITE of the Service Contract. A1-1.5.7 - 3 (') SUFFICIENCY OF COMMUNICATION INFORMATION SYSTEM SERVICE TO SITE 522-214 PAUL E. JOSEPH STADIUM Submittal Log with Detail GEC, LLC Date: 5/6/2016 tnctude Closed Jobs: No Show: All AI-1.5.7 - 4 t] SUFFICIENCY OF ANY OTHER VI WASTE MANAGEMENT 12/11/14 =: 11/24/15 WMA sewer sufficiency; resubmitted REQUIRED INFRASTRUCTURE to Government per CO1 of the Service IMPROVEMENTS Contract. AN-1.5.7 - 5 Qo SOIL TESTING REPORT VITEST Engineera 2205 = 11/24/45 Including engineering recommendations; resubmitted to Govemment per COt of the Service Contract. A1-1.5.7-6 0 CIMIL ENGINEERING REPORT Steve Hutchins (Steven E. Hutchina AIA) M27N5 = 11/24/15 Genesis food mitigation; resubmilied to Government per CO1 of the Service Contract. Ai-1.5.8 + 1 ty) DESIGN CONCEPT PLAN FOR AZN7PAS 12/22/15 12/22/15 Design guidance receivedi22215 STADIUM, LITTLE LEAGUE FIELD, from Coastal I from mig CARNIVAL VILLAGE w Government 12172015. §22-214 PAUL €. JOSEPH STADIUM RFI Log GEC, LLC Include Closed Jobs: No 522-214 PAUL E. JOSEPH STADIUM Number Date Subject 1 04-05-16 Concession Space Equipment and Fixtures Required Date 04-18-2016 05-06-2016 Page 1 Project Manager: Returned Forwarded Date Date