FORTUNA (WEST END ST. THOMAS)
solar design associates inc HARVARD, MA 01451-0242 tel: 978-456-6855 fax: 978-772-9715 www.solardesign.com FORTUNA (WEST END ST. THOMAS) REVISION NOTES MARK DATE DESCRIPTION PROFESSIONAL STAMP THIS DRAWING IS FOR INFORMATION PURPOSES ONLY. CERTIFICATION OR VALIDATION IS TO BE DONE BY A PROFESSIONAL WITH EXPERTISE IN THE REQUIRED FIELD AND A LICENSE IN THE STATE THAT THE INSTALLATION WILL RESIDE. CERTFICIATION OR VALIDATION TO BE INCLUDED AS PART OF THE SUBMITTALS FOR PERMITTING OF THE OVERALL PROJECT. PERMIT SET Friday, January 24, 2025 CONTRACTOR NAME STREET CITY/ST/ZIP NOTES NAME STREET CITY/ST/ZIP NOTES SITE SUBMISSION SITE PLAN - FULL SITE PV101 St Tom - Fortuna.pln AS NOTED CH RE SHEET SIZE: SHEET DRAWING NO. DRAWING TITLE FILE NAME CHECKED BY DRAWN BY DATE DRAFTED: DRAWING SCALE 1/24/2025 OF ARCH D 3 98 FORTUNA ESTATE, US VI, STT. FORTUNA ROAD FORTUNA (WEST END ST. THOMAS) SITE KEY N ESTATE PROPERTY LINE ABUTTING LINE BETW. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://legvi.org/committeemeetings/Zoning/CZMK0017-25%20Fortuna/Fortuna%20Solar%20Phase%20Details.pdf
SHA-256 67f1ce777b14f99834aef09d9ebae99b802083b5c23f8f18e7c43dd1a663c468
Re-using this document
A proceeding of the Legislature of the Virgin Islands, open to the public under 3 V.I.C. § 881, which reaches any committee of any branch of government and permits the news media to publish what it records.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-67f1ce777b14
Document text
solar design associates inc HARVARD, MA 01451-0242 tel: 978-456-6855 fax: 978-772-9715 www.solardesign.com FORTUNA (WEST END ST. THOMAS) REVISION NOTES MARK DATE DESCRIPTION PROFESSIONAL STAMP THIS DRAWING IS FOR INFORMATION PURPOSES ONLY. CERTIFICATION OR VALIDATION IS TO BE DONE BY A PROFESSIONAL WITH EXPERTISE IN THE REQUIRED FIELD AND A LICENSE IN THE STATE THAT THE INSTALLATION WILL RESIDE. CERTFICIATION OR VALIDATION TO BE INCLUDED AS PART OF THE SUBMITTALS FOR PERMITTING OF THE OVERALL PROJECT. PERMIT SET Friday, January 24, 2025 CONTRACTOR NAME STREET CITY/ST/ZIP NOTES NAME STREET CITY/ST/ZIP NOTES SITE SUBMISSION SITE PLAN - FULL SITE PV101 St Tom - Fortuna.pln AS NOTED CH RE SHEET SIZE: SHEET DRAWING NO. DRAWING TITLE FILE NAME CHECKED BY DRAWN BY DATE DRAFTED: DRAWING SCALE 1/24/2025 OF ARCH D 3 98 FORTUNA ESTATE, US VI, STT. FORTUNA ROAD FORTUNA (WEST END ST. THOMAS) SITE KEY N ESTATE PROPERTY LINE ABUTTING LINE BETW. PARCEL 2 & PARCEL 3B APPROX REGION FOR PHASE 2 EXPANSION ESTATE PROPERTY LINE SHORELINE PER US ARMY CORP AERIAL TOPOGRAPHY FORTUNA RD (RT 30) 20 FT FRONT SETBACK 15 FT SIDE YARD SETBACK FENCE AROUND PV ARRAY 16' STANDARD SETBACK FROM FENCE ACCESS DRIVEWAY LIMITS OF PUBLIC RIGHT-OF-WAY DRIVEWAY ENTRY FROM ROAD ENTRY GATE ACCESS DRIVEWAY TO EACH INVERTER STATION TURN-AROUND TURN-AROUND EXTEND FOR PHASE 2 DRIVEWAY HANDHOLES FOR PHASE 2 EXPANSION ESTATE PROPERTY LINE LIMITS OF FLOOD ZONE VE 10' SIDE YARD SETBACK 10' SIDE YARD SETBACK LIMITS OF PHASE 1 CLEARING TEMPORARY CONSTRUCTION BETW. PHASE 1 & PHASE 2 ESTIMATED BOUNDARY OF PHASE 2 CONSTRUCTION, BASED ON TOPOGRAPHY (SUBJECT TO CHANGE W/ PHASE 2 DESIGN) NEW UTILITY-OWEND INTERCONNECTION POLE PHASE 1 ARRAY SWITCHGEAR & METER PADS BATTERY ENERGY STORAGE SYSTEMS (BESS) PV EQPT PADS END POST OF PHASE 1 PERMANENT FENCE TYP OF PHASE 1 ARRAYS: MAINTAIN A STRAIGHT LINE ON EAST EDGE OF ARRAYS, SO MESSENGER CABLE CAN TRAVEL IN A STRAIGHT LINE FOR ZONE 9, MAINTAIN STRAIGHT LINE ON WEST SIDE OF ARRAY PHASE 2 ARRAY CARIBBEAN SEA PARCEL 2 PARCEL 3B TIER II TIER I TIER II TIER I FLOOD ZONE VE FLOOD ZONE VE, ELEV 9 FLOOD ZONE AE, ELEV 8 FLOOD ZONE X FLOOD ZONE X FLOOD ZONE VE, ELEV 25 FLOOD ZONE X FLOOD ZONE VE TYP 11 FT ACCESS PATHS BETW. ARRAY SECTIONS FOR COMBINER ACCESS SPECIAL CASE OF 13 FT ACCESS PATH FOR COMMON-AISLE COMBINERS POTENTIAL REGION FOR 282 QTY ADDT'L MODULES, BASED ON WHETHER BESS CAPACITY IS REQ'D OR NOT 20° FIXED TILT PV ARRAY AZIMUTH: 15° WEST OF TRUE SOUTH MODULES DC POWER TOTAL PV AC POWER 42,432/ 465W TOTAL BESS AC POWER MAX EXPORT AC POWER* TOTAL BESS ENERGY 18 MWac 12.8 MWac 36.8 MW-hrs 19.73 MWdc SYSTEM PHASE 1 * SYSTEMS ARE CONTROLLED TO LIMIT EXPORT POWER TO THE VALUES ABOVE 20 MWac 25 MWac SITE TOTAL TBD 23.62 MWdc 2 TOTAL 38 MWac 25 MWac 50,796/ 465W 93228/ 465W 43.35 MWdc TBD TBD TBD N a a: 0.00° CW (TRUE) 1 SITE PLAN - FULL SITE 0 200' 400' solar design associates inc HARVARD, MA 01451-0242 tel: 978-456-6855 fax: 978-772-9715 www.solardesign.com FORTUNA (WEST END ST. THOMAS) REVISION NOTES MARK DATE DESCRIPTION PROFESSIONAL STAMP THIS DRAWING IS FOR INFORMATION PURPOSES ONLY. CERTIFICATION OR VALIDATION IS TO BE DONE BY A PROFESSIONAL WITH EXPERTISE IN THE REQUIRED FIELD AND A LICENSE IN THE STATE THAT THE INSTALLATION WILL RESIDE. CERTFICIATION OR VALIDATION TO BE INCLUDED AS PART OF THE SUBMITTALS FOR PERMITTING OF THE OVERALL PROJECT. PERMIT SET Friday, January 24, 2025 CONTRACTOR NAME STREET CITY/ST/ZIP NOTES NAME STREET CITY/ST/ZIP NOTES SITE SUBMISSION TRANSFORMER ZONE LAYOUT - PHASE 1 PV201 St Tom - Fortuna.pln AS NOTED CH RE SHEET SIZE: SHEET DRAWING NO. DRAWING TITLE FILE NAME CHECKED BY DRAWN BY DATE DRAFTED: DRAWING SCALE 1/24/2025 OF ARCH D 8 98 FORTUNA ESTATE, US VI, STT. FORTUNA ROAD FORTUNA (WEST END ST. THOMAS) SITE KEY N EQPT PAD W/ XFMR PV1 & INVERTER STATION 1 EQPT PAD W/ XFMRS PV2 & PV3 & INVERTER STATIONS 2 & 3 EQPT PAD W/ XFMRS PV4 & PV5 & INVERTER STATIONS 4 & 5 EQPT PAD W/ XFMRS PV6 & PV7 & INVERTER STATIONS 6 & 7 XFMR PV2 XFMR PV4 XFMR PV7 XFMR PV9 XFMR PV1 FORTUNA ROAD ZONE 1: TO TRANSFORMER PV1 ZONE 2: TO TRANSFORMER PV2 ZONE 3: TO TRANSFORMER PV3 ZONE 4: TO TRANSFORMER PV4 ZONE 5: TO TRANSFORMER PV5 ZONE 6: TO TRANSFORMER PV6 ZONE 7: TO TRANSFORMER PV7 ZONE 8: TO TRANSFORMER PV8 ZONE 9: TO TRANSFORMER PV9 EQPT PAD W/ XFMRS PV8 & PV9 & INVERTER STATIONS 8 & 9 XFMR PV3 XFMR PV5 XFMR PV6 XFMR PV8 SITE SECTIONALIZING SWITCHGEAR PRIMARY METER, (BUILT IN PHASE 1) N a a: 0.00° CW 1 FORTUNA PHASE 1 - SOLAR ARRAY LAYOUT & TRANSFORMER ZONES 0 40' 80' 160' solar design associates inc HARVARD, MA 01451-0242 tel: 978-456-6855 fax: 978-772-9715 www.solardesign.com FORTUNA (WEST END ST. THOMAS) REVISION NOTES MARK DATE DESCRIPTION PROFESSIONAL STAMP THIS DRAWING IS FOR INFORMATION PURPOSES ONLY. CERTIFICATION OR VALIDATION IS TO BE DONE BY A PROFESSIONAL WITH EXPERTISE IN THE REQUIRED FIELD AND A LICENSE IN THE STATE THAT THE INSTALLATION WILL RESIDE. CERTFICIATION OR VALIDATION TO BE INCLUDED AS PART OF THE SUBMITTALS FOR PERMITTING OF THE OVERALL PROJECT. PERMIT SET Friday, January 24, 2025 CONTRACTOR NAME STREET CITY/ST/ZIP NOTES NAME STREET CITY/ST/ZIP NOTES SITE SUBMISSION FULL SITE PLAN W/ PHASE 2 EXPANSION PVB101 St Tom - Fortuna.pln AS NOTED CH RE SHEET SIZE: SHEET DRAWING NO. DRAWING TITLE FILE NAME CHECKED BY DRAWN BY DATE DRAFTED: DRAWING SCALE 1/24/2025 OF ARCH D 72 98 FORTUNA ESTATE, US VI, STT. FORTUNA ROAD FORTUNA (WEST END ST. THOMAS) SITE KEY N ESTATE PROPERTY LINE ABUTTING LINE BETW. PARCEL 2 & PARCEL 3B ESTATE PROPERTY LINE SHORELINE PER US ARMY CORP AERIAL TOPOGRAPHY FORTUNA RD (RT 30) 20 FT FRONT SETBACK 15 FT SIDE YARD SETBACK FENCE AROUND PV ARRAY 16' STANDARD SETBACK FROM FENCE ACCESS DRIVEWAY LIMITS OF PUBLIC RIGHT-OF-WAY DRIVEWAY ENTRY FROM ROAD ENTRY GATE ACCESS DRIVEWAY TO EACH INVERTER STATION TURN-AROUND ESTATE PROPERTY LINE LIMITS OF FLOOD ZONE VE 10' SIDE YARD SETBACK 10' SIDE YARD SETBACK LIMITS OF PHASE 1 CLEARING NEW UTILITY-OWEND INTERCONNECTION POLE PHASE 1 ARRAY SWITCHGEAR & METER PADS BATTERY ENERGY STORAGE SYSTEMS (BESS) PV EQPT PADS FENCE AROUND PHASE 2 PV ARRAY DRIVEWAY EXTENDED TO ACCESS PHASE 2 EQPT PADS TURN-AROUND AT END OF DRIVEWAY INTERCEPT EXT'G FENCE OF PHASE 1 AND CONTINUE AROUND PHASE 2 ARRAY 16' STANDARD SETBACK FROM FENCE TYP OF PHASE 1 ARRAYS: MAINTAIN A STRAIGHT LINE ON EAST EDGE OF ARRAYS, SO MESSENGER CABLE CAN TRAVEL IN A STRAIGHT LINE FOR ZONE 9, MAINTAIN STRAIGHT LINE ON WEST SIDE OF ARRAY FOR ZONES 10 THRU 12, MAINTAIN STRAIGHT LINE ON WEST SIDE OF ARRAY FOR ZONES 14 & 15, MAINTAIN STRAIGHT LINE ON WEST SIDE OF ARRAY FOR ZONES 18 & 19, MAINTAIN STRAIGHT LINE ON WEST SIDE OF ARRAY FOR ZONES 16 & 17, MAINTAIN STRAIGHT LINE ON EAST SIDE OF ARRAY PHASE 2 ARRAY PROPOSED LOCATIONS OF 2' ARRAY GAPS, WHERE REQ'D DUE TO ARRAY LENGTH CARIBBEAN SEA PARCEL 2 PARCEL 3B TIER II TIER I TIER II TIER I FLOOD ZONE VE FLOOD ZONE VE, ELEV 9 FLOOD ZONE AE, ELEV 8 FLOOD ZONE X FLOOD ZONE X FLOOD ZONE VE, ELEV 25 FLOOD ZONE X FLOOD ZONE VE TYP 11 FT ACCESS PATHS BETW. ARRAY SECTIONS FOR COMBINER ACCESS SPECIAL CASE OF 13 FT ACCESS PATH FOR COMMON-AISLE COMBINERS PHASE 2 EQPT PADS W/ INVERTERS & TRANSFORMERS 13 FT ACCESS PATH FOR COMMON-AISLE COMBINERS 11 FT ACCESS PATH FOR COMBINERS ON ONLY ONE SIDE 13 FT ACCESS PATH FOR COMMON-AISLE COMBINERS INTERCEPT EXT'G FENCE OF PHASE 1 AND CONTINUE AROUND PHASE 2 ARRAY MIN 9' CLEAR SPACE BETW. PHASE 1 & 2 ARRAYS FOR ACCESSIBILITY, NO COMBINERS HERE POTENTIAL REGION FOR 282 QTY ADDT'L MODULES, BASED ON WHETHER BESS CAPACITY IS REQ'D OR NOT 20° FIXED TILT PV ARRAY AZIMUTH: 15° WEST OF TRUE SOUTH MODULES DC POWER TOTAL PV AC POWER 42,432/ 465W TOTAL BESS AC POWER MAX EXPORT AC POWER* TOTAL BESS ENERGY 18 MWac 12.8 MWac 36.8 MW-hrs 19.73 MWdc SYSTEM PHASE 1 * SYSTEMS ARE CONTROLLED TO LIMIT EXPORT POWER TO THE VALUES ABOVE 20 MWac 25 MWac SITE TOTAL TBD 23.62 MWdc 2 TOTAL 38 MWac 25 MWac 50,796/ 465W 93228/ 465W 43.35 MWdc TBD TBD TBD N a a: 15.00° CCW 1 SITE PLAN - FULL SITE W/ PHASE 2 EXPANSION 0 200' 400' solar design associates inc HARVARD, MA 01451-0242 tel: 978-456-6855 fax: 978-772-9715 www.solardesign.com FORTUNA (WEST END ST. THOMAS) REVISION NOTES MARK DATE DESCRIPTION PROFESSIONAL STAMP THIS DRAWING IS FOR INFORMATION PURPOSES ONLY. CERTIFICATION OR VALIDATION IS TO BE DONE BY A PROFESSIONAL WITH EXPERTISE IN THE REQUIRED FIELD AND A LICENSE IN THE STATE THAT THE INSTALLATION WILL RESIDE. CERTFICIATION OR VALIDATION TO BE INCLUDED AS PART OF THE SUBMITTALS FOR PERMITTING OF THE OVERALL PROJECT. PERMIT SET Friday, January 24, 2025 CONTRACTOR NAME STREET CITY/ST/ZIP NOTES NAME STREET CITY/ST/ZIP NOTES SITE SUBMISSION TRANSFORMER ZONE LAYOUT - PHASE 2 PVB201 St Tom - Fortuna.pln AS NOTED CH RE SHEET SIZE: SHEET DRAWING NO. DRAWING TITLE FILE NAME CHECKED BY DRAWN BY DATE DRAFTED: DRAWING SCALE 1/24/2025 OF ARCH D 73 98 FORTUNA ESTATE, US VI, STT. FORTUNA ROAD FORTUNA (WEST END ST. THOMAS) SITE KEY N EQPT PAD W/ XFMRS PV6 & PV7 & INVERTER STATIONS 6 & 7 EQPT PAD W/ XFMRS PV17 & PV18 & INVERTER STATIONS 17 & 18 EQPT PAD W/ XFMRS PV16 & PV17 & INVERTER STATIONS 18 & 17 EQPT PAD W/ XFMR PV15 & INVERTER STATION 15 EQPT PAD W/ XFMRS PV10 & PV11 & INVERTER STATIONS 10 & 11 EQPT PAD W/ XFMRS PV12 & PV13 & INVERTER STATIONS 12 & 13 XFMR PV7 XFMR PV9 XFMR PV15 EQPT PAD W/ XFMR PV14 & INVERTER STATION 14 XFMR PV14 ZONE 8: TO TRANSFORMER PV8 ZONE 9: TO TRANSFORMER PV9 ZONE 10: TO TRANSFORMER PV10 ZONE 11: TO TRANSFORMER PV11 ZONE 12: TO TRANSFORMER PV12 ZONE 14: TO TRANSFORMER PV13 ZONE 15: TO TRANSFORMER PV14 ZONE 17: TO TRANSFORMER PV17 ZONE 16: TO TRANSFORMER PV16 ZONE 19: TO TRANSFORMER PV19 ZONE 18: TO TRANSFORMER PV18 EQPT BUILT IN PHASE 1: ZONE 13: TO TRANSFORMER PV12 EQPT PAD W/ XFMRS PV8 & PV9 & INVERTER STATIONS 8 & 9 XFMR PV6 XFMR PV8 XFMR PV10 XFMR PV11 XFMR PV13 XFMR PV12 XFMR PV16 XFMR PV17 XFMR PV19 XFMR PV18 SITE SECTIONALIZING SWITCHGEAR PRIMARY METER, (BUILT IN PHASE 1) N a a: 0.00° CW 1 FORTUNA PHASE 2 - TRANSFORMER ZONE LAYOUT