FLOOR FRAMING AND CEILING TILE PLAN
549 A 2 SHEET No.: 1/4" = 1'-0" DRAWN BY: JOB No.: SCALE: SEPT., 2024 DATE: FLOOR FRAMING AND CEILING TILE PLAN
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://legvi.org/committeemeetings/Zoning/Bill%2036-0129%20%20STX%20CCZP0025-25%20WTJX/10B.%20Interior%20studio%20build%20out/A2.pdf
SHA-256 6903d0c1a5d52338b81d58942ae8ced4d5047580dc2c4099ac354d86e27916e6
Re-using this document
A proceeding of the Legislature of the Virgin Islands, open to the public under 3 V.I.C. § 881, which reaches any committee of any branch of government and permits the news media to publish what it records.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-6903d0c1a5d5
Document text
549 A 2 SHEET No.: 1/4" = 1'-0" DRAWN BY: JOB No.: SCALE: SEPT., 2024 DATE: FLOOR FRAMING AND CEILING TILE PLAN