EEJ INTERNATIONAL TECHNOLOGY CORPORATION L>' L' ^ I fL^-> ^, . ( i I; ^ • L April 10, 1995 IT Project No. 409440 Ms. Caroline Kwan New York/Caribbean Superfund Branch 2 United States Environmental Protection Agency Region II 290 Broadway, 20th Floor New York, New York 10007-1866 Work Plan for Initial Soil Sampling Event, Post Soil Remediation O'Henrv Laundry. Tutu. St Thomas. U.S. Virgin Islands Dear Ms. Kwan: Per our telephone conversation on April 5, 1995, the initial sampling of the soil venting pile at the O'Henry Laundry, Tutu, St. Thomas is scheduled to take place the second week of May, 1995. I will call you with the actual dates of field sampling when they are finalized. The soil pile consists of two soil layers with each layer divided into quadrants by the venting pipes ( Figure 1). One discrete soil sample will be collected from the approximate center of each quadrant in each layer with the depth of the sample to be determined as described below. A total of eight samples will be collected from the soil pile. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://semspub.epa.gov/src/document/02/64591

SHA-256 7d291fb005578f0348e1ff80059095fb41ca0f0a4f6b00666bed9bfb2c52858f

Re-using this document

CERCLA administrative record

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-7d291fb00557

Document text

EEJ INTERNATIONAL TECHNOLOGY CORPORATION L>' L' ^ I fL^-> ^, . ( i I; ^ • L April 10, 1995 IT Project No. 409440 Ms. Caroline Kwan New York/Caribbean Superfund Branch 2 United States Environmental Protection Agency Region II 290 Broadway, 20th Floor New York, New York 10007-1866 Work Plan for Initial Soil Sampling Event, Post Soil Remediation O'Henrv Laundry. Tutu. St Thomas. U.S. Virgin Islands Dear Ms. Kwan: Per our telephone conversation on April 5, 1995, the initial sampling of the soil venting pile at the O'Henry Laundry, Tutu, St. Thomas is scheduled to take place the second week of May, 1995. I will call you with the actual dates of field sampling when they are finalized. The soil pile consists of two soil layers with each layer divided into quadrants by the venting pipes ( Figure 1). One discrete soil sample will be collected from the approximate center of each quadrant in each layer with the depth of the sample to be determined as described below. A total of eight samples will be collected from the soil pile. In order to ensure reliability of field sampling procedures and materials, quality control (QC) samples will be collected or prepared. QC samples will include one field duplicate, one trip blank and an equipment rinsate sample. Samples will be analyzed for EPA's Target Analyte List VOCs according to EPA's CLP March 1990 SOW. All data will be validated. It is anticipated that stainless steel auger buckets will be used for soil sample collection. Samples will be collected continuously through each layer at each location and headspace measured for VOCs using PID. The sample with the highest headspace for each layer at each location will be sent to the laboratory for analysis. Soil removed from the pile, but not sent to the laboratory for analysis will be placed back in the pile at the location from where it was removed. A final determination of the sampling equipment will be made after an IT representative has examined the roof structure over the soil venting pile. A site visit is scheduled to take place the week of April 17th, 1995. Decontamination procedures for soil sample collection equipment will be similar to the procedures followed during soil remediation efforts in accordance with the Work Plan for O:\B\Apr\AM002\bf Regional Office 312 Directors Drive • Knoxville, Tennessee 37923-4799 • 615-690-3211 • FAX: 615-690-3626 IT Corporation is a wholly owned subsidiary ot Internationa! Technology Corporation TUT 006 *64591* 64591 INTERNATIONAL TECHNOLOGY CORPORATION Ms. Caroline Kwan 2 April 11, 1995 Evaluation and Interim Soil Remediation (IT, 1994) at the site. Decontamination fluids will be evaporated in metal pans. Sampling will be conducted in accordance with the Health and Safety Plan included in Appendix A of the Soil Remediation Work Plan (IT, 1994). A letter report with validated data will be forwarded to you within two months of the sampling. If you have any questions or require additional information or require changes to the sampling plan, please call me at (615) 690-3211. Sincerely, Belinda Price, R.P.G Project Manager cc: N. D'Anna, Esq. J. McBirney, de maximis, inc. TUT 006 0455 0:\.\Apr\AM002\bf \ U I 6" X 16" Reinforced Concrete Block Walls Soil I I I ----------o I I I I ~----------~------------~--i 1---------- 1 I I I I I I I ----------E) -..J -Roof Vent (6) #2 Gravel ____________ __, ________ __,_ Sloped (washed) Soil #2 Gravel (washed) SCALE: 0 4 8 FEET FIGURE 1 As-Built Soil Venting PIie O'Henry Dry Cleaners Soll Remediation FIG7 .drw/LH ENRl/mc/3-27-94