February 11, 2025 Community Meeting Presentation
ENIGHED POND COMMUNITY PARK February 11, 2025 Community Meeting Design Updates and Next Steps Kurt G. Marsh Jr. BioImpact, Inc. AGENDA ▪Summary of Previous Community Meetings ▪Field Investigations and Findings ▪Refinements to Master Plan ▪Park Program Elements/Operations ▪Building Programming and Design Development ▪Design Next Steps and Schedule Agenda Virgin Islands Port Authority Moffatt & Nichol 2 PROGRAMMING AND CONCEPT DEVELOPMENT Community Meeting #1 September 8, 2022 Community Working Group #1 November 10, 2022 Community Working Group #2 December 1, 2022 Community Working Group #3 January 19, 2023 Community Meeting #2* February 9, 2023 Key Programming Elements ▪Multi-Purpose Event Space including Carnival ▪Community Center, Cultural Space, and other spaces to support local commercial businesses ▪Children’s Playground and other recreational activities ▪Flexible Outdoor Space for Community (vendors/open greens) ▪Emergency/Recovery Staging Area ▪Design adapts to site conditions Previous Community Meetings Virgin Islands Port Authority Moffatt & Nichol 3 PREFERRED MASTER PLAN Pre …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://www.viport.com/_files/ugd/e0a2e7_508bf2fa331e4a3c896d20a60e91d4ff.pdf
SHA-256 81d03575fa817748235554769ab15c793d8fc3249c57d9f8d3a4655ac66d8728
Re-using this document
An instrumentality of the Government of the Virgin Islands. No rights are stated anywhere: the document carries no copyright notice and the body publishes no terms of use. 17 U.S.C. § 105 does not reach territorial government, so nothing makes it public domain by operation of federal law — it publishes as a territorial public record, and we say plainly that the position is unstated rather than settled.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-81d03575fa81
Document text
ENIGHED POND COMMUNITY PARK February 11, 2025 Community Meeting Design Updates and Next Steps Kurt G. Marsh Jr. BioImpact, Inc. AGENDA ▪Summary of Previous Community Meetings ▪Field Investigations and Findings ▪Refinements to Master Plan ▪Park Program Elements/Operations ▪Building Programming and Design Development ▪Design Next Steps and Schedule Agenda Virgin Islands Port Authority Moffatt & Nichol 2 PROGRAMMING AND CONCEPT DEVELOPMENT Community Meeting #1 September 8, 2022 Community Working Group #1 November 10, 2022 Community Working Group #2 December 1, 2022 Community Working Group #3 January 19, 2023 Community Meeting #2* February 9, 2023 Key Programming Elements ▪Multi-Purpose Event Space including Carnival ▪Community Center, Cultural Space, and other spaces to support local commercial businesses ▪Children’s Playground and other recreational activities ▪Flexible Outdoor Space for Community (vendors/open greens) ▪Emergency/Recovery Staging Area ▪Design adapts to site conditions Previous Community Meetings Virgin Islands Port Authority Moffatt & Nichol 3 PREFERRED MASTER PLAN Previous Community Meeting Virgin Islands Port Authority Moffatt & Nichol 4 SITE SURVEY ▪Site Grading ▪Stormwater Conveyance ▪Building First Floor Elevations ▪Existing Site Elevations range average between Elevation 5.5 to 6.5 feet ▪Intersection of Fish Fry Dr. and Wharf Bypass is low point at Elevation 3. ▪Terminal Road at Elevation 4.5 feet Field Investigation and Findings Virgin Islands Port Authority Moffatt & Nichol 5 GEOTECHNICAL EXPLORATION ▪Identify Physical and Chemical Properties of Material ▪Weak physical soil properties ❑Soft silty soils and loose sands for 20 to 30 feet below surface ❑Consistent with dredged material placement and former salt pond ▪Chemical soil properties ❑ICP Metals and TPH Analysis ❑Slight elevation of arsenic readings above residential regulatory limits for USVI and Florida. ▪Ground Improvements ❑Surcharge/Wick Drains ❑Select soil removal and capping ❑Pile supported buildings Field Investigations and Findings Virgin Islands Port Authority Moffatt & Nichol 6 FLOOD CONSIDERATION ▪Coastal flood hazard based on pre-port construction ▪Port construction modifies wave propagation to site ▪Application to FEMA to revise flood designation and adjust base flood elevation (BFE) to elevation 8 feet (consistent with surrounding area) ▪Building first floor set at elevation 8.5 feet (approximately 3 feet higher than existing grade) ▪Site grades raised a minimum of 2.5 feet ▪Building foundation to be pile supported Field Investigations and Findings Virgin Islands Port Authority Moffatt & Nichol 7 SITE PLAN AND BUILDING PROGRAM Refinement Goals ▪Adapt site plan based on field investigations ▪Evolve site entrances to buildings, open space, and performance areas ▪Refine festival event area to meet needs of community ▪Improve internal and external pedestrian access/pathways ▪Define building program and advance architectural design to align with community cultural history ▪Define flexible space opportunities for commercial and recreational uses ▪Finalize emergency/recovery staging area Refinements to Master Plan Virgin Islands Port Authority Moffatt & Nichol 8 9 ** Insert Context Map ** 10 ** Insert Context Map ** 11 ** Insert Context Map ** 12 ** Insert Context Map ** 13 ** Insert Context Map ** 14 ** Insert Context Map ** INITIAL DESIGN IDEAS Virgin Islands Port Authority Moffatt & Nichol 150 VIRGIN ISLAND ARCHITECTURAL CONTEXT Virgin Islands Port Authority Moffatt & Nichol 16 DESIGN INSPIRATION Virgin Islands Port Authority Moffatt & Nichol 17 SITE PLAN Virgin Islands Port Authority Moffatt & Nichol 18 BIRD’S EYE VIEW Virgin Islands Port Authority Moffatt & Nichol 19 BUILDING 1 PLANS Virgin Islands Port Authority Moffatt & Nichol 20 BUILDING 2 PLANS Virgin Islands Port Authority Moffatt & Nichol 21 AMPHITHEATER PLANS Virgin Islands Port Authority Moffatt & Nichol 22 Virgin Islands Port Authority Moffatt & Nichol 23 ENIGHED POND COMMUNITY PARK ENTRY PLAZA Virgin Islands Port Authority Moffatt & Nichol 24 BUILDING 1 – TICKETING AND COMMUNITY SPACE Virgin Islands Port Authority Moffatt & Nichol 25 BUILDING 2 – FUTURE RETAIL SPACE Virgin Islands Port Authority Moffatt & Nichol 26 AMPHITHEATER Virgin Islands Port Authority Moffatt & Nichol 27 2025 2026 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR 1 Complete Schematic Design (DONE) 2 Public Meeting 3 CZM Coordination and Permit Application 4 CZM Review And Authorization 5 Design Development Phase (60% Design) 6 Final Design & Bid Documents (100% Design) 7 Construction 2/5/2025 Milestone Public Meetings 2/11/2025 3/12/25 – 5/12/2025 NEXT STEPS AND PROJECT SCHEDULE 9/16/2025 5/12/25 – 11/10/2025 4/12/25 – 10/10/2025 10/10/25 – 1/10/2026 QUESTIONS ▪Comments and Question on the Enighed Pond Community Park can be emailed to the Virgin Islands Port Authority at the following address: enighedpark@viport.com Next Steps Virgin Islands Port Authority Moffatt & Nichol 29 ENIGHED POND COMMUNITY PARK 32 ** Insert Context Map **