de maximis TUTU WELL SITE, ST. THOMAS, U.S. VIRGIN ISLANDS MONTHL Y PROGRESS REPORT #37 FEBRUARY 1995 WORK COMPLETED DURING PREVIOUS MONTH Met with ERA on February 1 at Region II to prepare for meetings with DNPR, WAPA, and DPW. On February 6 and 1, 1995 representatives of TEIC attended and participated in a meeting on St. Thomas with USEPA, CDM, DPNR, WAPA and DPW to discuss specific aspects of project implementation including: a) treated groundwater discharges b) treated groundwater re-use c) short-term source control strategies d) disposal of non-hazardous soils and solids at Bivoni Landfill e) the permitting processes necessary as part of remedial implementation On February 24, 1995 TEIC received EPA's comments on the final draft Rl Report. On February 27, 1995 TEIC received supplemental data collected by EPA contractors further addressing site conditions at the Laga Building. EPA requested that a discussion of this data be incorporated into the final Rl. WORK TO BE COMPLETED DURING NEXT MONTH • Submit Draft Feasibility Study (FS) document to EPA and the PRP Group. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://semspub.epa.gov/src/document/02/64597

SHA-256 86d2155a93647245fb5e5dba20d560939061590c8e108c6594d9eebca48d6fd1

Re-using this document

CERCLA administrative record

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-86d2155a9364

Document text

de maximis TUTU WELL SITE, ST. THOMAS, U.S. VIRGIN ISLANDS MONTHL Y PROGRESS REPORT #37 FEBRUARY 1995 WORK COMPLETED DURING PREVIOUS MONTH Met with ERA on February 1 at Region II to prepare for meetings with DNPR, WAPA, and DPW. On February 6 and 1, 1995 representatives of TEIC attended and participated in a meeting on St. Thomas with USEPA, CDM, DPNR, WAPA and DPW to discuss specific aspects of project implementation including: a) treated groundwater discharges b) treated groundwater re-use c) short-term source control strategies d) disposal of non-hazardous soils and solids at Bivoni Landfill e) the permitting processes necessary as part of remedial implementation On February 24, 1995 TEIC received EPA's comments on the final draft Rl Report. On February 27, 1995 TEIC received supplemental data collected by EPA contractors further addressing site conditions at the Laga Building. EPA requested that a discussion of this data be incorporated into the final Rl. WORK TO BE COMPLETED DURING NEXT MONTH • Submit Draft Feasibility Study (FS) document to EPA and the PRP Group. • Submit Final Rl Report to EPA. • Assist EPA as required in preparation for meetings to publicly discuss the FS. TUT 006 0461 *64597* 64597