VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

Updated Bid Schedule

Collection
Contracts & Procurement
Sub-shelf
dpp.vi.gov (Property and Procurement contracts)
Kind
Contract
Island
St. Thomas
Date
2024-02-06
Pages
1
Text
OCR Text

No. —_ 10 11 12 13 14 BID SCHEDULE GOVERNMENT OF THE VIRGIN ISLANDS DIVISION OF PERSONNEL/ST. THOMAS 3438 Kronprindsen Gade GERS Building, 3rd Floor Ste DESCRIPTION |MOBILIZATION REMOVE AND DISCARD OF EXISTING ‘CARPET |INSTALL NEW CERAMIC FLOOR TILES |REMOVE/REPLACE EXISTING DRY- IWALL WITH 5/8" GYPSUM BOAR ONE ISIDE OF STEEL STUDS INTERIOR WALL |REMOVE/REPLACE EXISTING DRY- \WALL WITH 5/8" GYPSUM BOAR TWO |SIDE OF STEEL STUDS INTERIOR WALL |SUPPLY/ANSTALL DRYWALL WITH '5/8" GYPSUM BOAR TWO SIDE OF iSTEEL STUDS INTERIOR WALL |REMOVE/INSTALL 36"x80" INTERIOR |GLASS DOORS INCLUDING HARDWARE IREMOVE/INSTALL INTERIOR GLASS 'WINDOWS INCLUDING WOOD TRIM "REMOVE/INSTALL NEW RECEPTION WINDOW AND RECEPTION COUNTER _REMOVE/INSTALL EXTERIOR GLASS _DOOR LOCATED CONFERENCE ROOM INSTALL NEW 4" PAINTED WOOD BASE |BOARD ‘PAINT INTERIOR WALLS USEONE COAT OF | 'OF PRIMER AND TWO COATS OF A DU- _RABLE LATEX PAINT. MOVING OF FURNISHINGS AND EQUIP- iMENTS |INSPECT CEILING TILE GRID AND RE- PLACE ANY DAMAGED SECTIONS WITH 'SAME. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2019/07/Updated-Bid-Schedule.pdf

SHA-256 90d56683c2c8ba6df688442204673e76d12800b27eb36e15ef8ba7f27b2ec14d

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-90d56683c2c8

Document text

No. —_ 10 11 12 13 14 BID SCHEDULE GOVERNMENT OF THE VIRGIN ISLANDS DIVISION OF PERSONNEL/ST. THOMAS 3438 Kronprindsen Gade GERS Building, 3rd Floor Ste DESCRIPTION |MOBILIZATION REMOVE AND DISCARD OF EXISTING ‘CARPET |INSTALL NEW CERAMIC FLOOR TILES |REMOVE/REPLACE EXISTING DRY- IWALL WITH 5/8" GYPSUM BOAR ONE ISIDE OF STEEL STUDS INTERIOR WALL |REMOVE/REPLACE EXISTING DRY- \WALL WITH 5/8" GYPSUM BOAR TWO |SIDE OF STEEL STUDS INTERIOR WALL |SUPPLY/ANSTALL DRYWALL WITH '5/8" GYPSUM BOAR TWO SIDE OF iSTEEL STUDS INTERIOR WALL |REMOVE/INSTALL 36"x80" INTERIOR |GLASS DOORS INCLUDING HARDWARE IREMOVE/INSTALL INTERIOR GLASS 'WINDOWS INCLUDING WOOD TRIM "REMOVE/INSTALL NEW RECEPTION WINDOW AND RECEPTION COUNTER _REMOVE/INSTALL EXTERIOR GLASS _DOOR LOCATED CONFERENCE ROOM INSTALL NEW 4" PAINTED WOOD BASE |BOARD ‘PAINT INTERIOR WALLS USEONE COAT OF | 'OF PRIMER AND TWO COATS OF A DU- _RABLE LATEX PAINT. MOVING OF FURNISHINGS AND EQUIP- iMENTS |INSPECT CEILING TILE GRID AND RE- PLACE ANY DAMAGED SECTIONS WITH 'SAME. ( 2'-0 x 2'-0") |PERFORM INSPECTION ELECTRICAL |COMPONENTS TO ENSURE INTEGRITY: |ELECTRICAL PANELS, JUNTION BOXES, |LIGHT FIXTURES, CONDUITS, OUTLET \BOXES. ‘TOTAL (NUMBERS) SF SF SF SF EA EA LS LF SF LS LS | 3,712.00. _ NUMBERS | QTY. UNITPRICE TOTAL($) 1.00. 5,684.00. 8,000.00. 200.00. h + "3,012.00 500.00. 3.00 2.00. 1.00. 1.00: 1,400.00. ‘TOTAL (WORDS) |CONTRRACTOR'S NAME: iCONTRACTOR'S SIGNATURE: 'PREPARED BY: DPW - ENG. DIVISION 'DATE: 08/7/2019 ( Revised Bid Schedule ) L