VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

Letter with attached tables regarding Anticipated Schedule for Pumping Tests, Tutu Service Station Investigation, St. Thomas, U.S. Virgin Islands

Collection
Federal Reference
Sub-shelf
EPA SEMS (Superfund, Region 2)
Kind
Government Report
Island
St. Thomas
Date
1992-10-29
Pages
6
Text
Native Text

'GERAGHTY '& MILLER, INC. Environmental Services Ground Water Engineering H\drocarbon Remediation Education October 29, 1992 Ms. Caroline Kwan, Project Manager U.S. Environmental Protection Agency 26 Federal Plaza, Room 737 New York, NY 10278 Re: Anticipated Schedule for Pumping Tests Tutu Service Station Investigation St. Thomas, U.S. Virgin Islands Dear Ms. Kwan: Table 1 enclosed provides a detailed schedule for the pumping tests to be performed at the above referenced site. Due to field conditions, minor delays or modifications may be necessary. The on-site USEPA representative will be kept advised of any scheduling changes. If you have any questions, please call. Sincerely, GERAGHTY & MILLER, INC. c: Ana Gloria Ramos - TEIC Jose Agrelot - Soil Tech Sally Odland, COM #PR01301/102892.hr —7^7 / /Aw^ I/, Thomas V. Danahy Daniel A. Nachman Project Director/Project Officer TUT O06 171" 201 West Passaic Street, 3rd Floor • Rochelle Park, New Jersey 07662-(201) 909-0700 • FAX (201) 909-0567/0568 340 *64871* 64871 Table 1. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://semspub.epa.gov/src/document/02/64871

SHA-256 91ab4ce201bb6bfa4e12f3bcb379ef4bf5014e61ee15a668e8c210231dc223c4

Re-using this document

CERCLA administrative record

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-91ab4ce201bb

Document text

'GERAGHTY '& MILLER, INC. Environmental Services Ground Water Engineering H\drocarbon Remediation Education October 29, 1992 Ms. Caroline Kwan, Project Manager U.S. Environmental Protection Agency 26 Federal Plaza, Room 737 New York, NY 10278 Re: Anticipated Schedule for Pumping Tests Tutu Service Station Investigation St. Thomas, U.S. Virgin Islands Dear Ms. Kwan: Table 1 enclosed provides a detailed schedule for the pumping tests to be performed at the above referenced site. Due to field conditions, minor delays or modifications may be necessary. The on-site USEPA representative will be kept advised of any scheduling changes. If you have any questions, please call. Sincerely, GERAGHTY & MILLER, INC. c: Ana Gloria Ramos - TEIC Jose Agrelot - Soil Tech Sally Odland, COM #PR01301/102892.hr —7^7 / /Aw^ I/, Thomas V. Danahy Daniel A. Nachman Project Director/Project Officer TUT O06 171" 201 West Passaic Street, 3rd Floor • Rochelle Park, New Jersey 07662-(201) 909-0700 • FAX (201) 909-0567/0568 340 *64871* 64871 Table 1. Anticipated Schedule for Pumping Tests, Tutu Service Station Investigation, St. Thomas, U.S. Virgin Islands. Date and Personnel Action Thurs., Oct. 29, 1992 C. Moffatt R. Ponciano Soil Tech Fri., Oct. 30, 1992 C. Moffatt R. Ponciano Soil Tech Finalize pump installation at MW-6D and piping to treatment system. Short 10 to 20 minute test of pump; set fiowrate to 8 gpm. Set-up data recorders to record overnight; readings at 30 minute intervals. 7:30-8:30 a.m. - Collect water-level measurements. 8:30-9:30 a.m. - Re-set data recorders for delayed start at 10:00 a.m., log cycle intervals not exceeding 30 second intervals. 10:00 a.m. (or a few seconds after 10:00 a.m. but not before) - Start Step Test at MW-6D; Step 0 at 8 gpm. Note steps are numbered 0 through 3 (4 steps). 11:00 a.m. - Begin Step 1 at MW-6D at 10 gpm. 12:00 (noon) - Begin Step 2 at MW-6D at 12 gpm. 13:00 - Begin Step 3 at MW-6D at 14 gpm. Sample influent to treatment system for field GC and lab analysis. 14:00 - End of Step Test. Set pump rate to 8 to 14 gpm (depending on drawdown) for Monday's test. Turn pump off. Record recovery. Sample treatment effluent for field GC and lab analysis. 15:00 - End of recovery data collection. Remove/download data recorders. Collect water- level measurements at data logger locations. 16:00 - 17:00 - Collect complete round of water- levels. Reset data recorders; linear scale, 30 minute intervals for pre-pumping measurements over Saturday and Sunday. GERAGHTY & MILLER, INC. TUT OO& 1715 Table 1. Anticipated Schedule for Pumping Tests, Tutu Service Station Investigation, St. Thomas, U.S. Virgin Islands. Date and Personnel Action Mon., Nov. 2, 1992 C. Moffatt R. Ponciano A. Colberg W. Morales D. McGregor Soil Tech 7:30-8:30 - Collect complete round of water-levels. 8:30-9:30 - Reset data recorders for delayed start at 10:00 a.m., log cycle intervals not exceeding 5- minute intervals. 10:00 (or a few seconds after 10:00) - Start 72-hour continuous rate pumping test at MW-6D. Pump rate (between 8 to 14 gpm) should be preset based upon Friday's step test. Take manual measurements at pumping well for plotting of data. 11:30 - Sample influent to treatment system for field GC and lab. 12:00 - Sample effluent for field GC and lab. Continue to collect influent and effluent samples for field GC every 2 hours. Measure complete round of water-levels (including data recorders with drop pipes and non-date recorder locations) on an hourly basis until 14 hours (12:00 midnight) into pump test. After 14 hours, measure complete rounds every 2 hours. Tues., Nov. 3, 1992 C. Moffatt R. Ponciano A. Colberg D. McGregor (Soil Tech not onsite) 10:00 - Twenty-four hours into test. Sample influent and effluent for field GC and lab analysis. Evaluate data plotted from pumping well for delayed yield. If delayed yield is not present, stop test and record recovery. If possible, have recorder start new step just prior to turning pump off. Wed., Nov. 4, 1992 C. Moffatt R. Ponciano D. McGregor Soil Tech 10:00 - Fourty-eight hours into test. Sample influent and effluent for field GC and lab analysis. If delayed yield is not present, stop test and record recovery. GERAGHTY & MILLER, INC. TUT OO& 1716 Table 1. Anticipated Schedule for Pumping Tests, Tutu Service Station Investigation, St. Thomas, U.S. Virgin Islands. Date and Personnel Action Thurs., Nov. 5, 1992 C. Moffatt R. Ponciano D. McGregor Soil Tech 10:00 - Seventy-two hours into test. Sample influent and effluent for field GC and lab analysis. Stop test and record recovery. 14:00 - Measure water level at MW-6. Remove MW-6 data recorder. 14:00 - 15:00 - Finalize pump installation at MW-6 and piping to treatment system. 16:00 - Short 10 to 20 minute test of pump; set flowrate to 2 gpm. Set-up data recorders to record overnight; readings at 30 minute intervals. Fri., Nov. 6, 1992 C. Moffatt R. Ponciano Soil Tech 7:30-8:30 a.m. - Collect water-level measurements. 8:30-9:30 a.m. - Re-set data recorders for delayed start at 10:00 a.m., log cycle intervals not exceeding 30 second intervals. 10:00 a.m. (or a few seconds after 10:00 a.m. but not before) - Start Step Test at MW-6D; Step 0 at 2 gpm. Note steps are numbered 0 through 3 (4 steps). 11:00 a.m. - Begin Step 1 at MW-6D at 4 gpm. 12:00 (noon) - Begin Step 2 at MW-6D at 6 gpm. 13:00 - Begin Step 3 at MW-6D at 8 gpm. Sample influent to treatment system for field GC and lab analysis. GERAGHTY & MILLER, INC. TUT 006 1717 Table 1. Anticipated Schedule for Pumping Tests, Tutu Service Station Investigation, St. Thomas, U.S. Virgin Islands. Date and Personnel Action Mon., Nov. 9, 1992 C. Moffatt R. Ponciano D. McGregor Soil Tech 14:00 - End of Step Test. Set pump rate to 2 to 8 gpm (depending on drawdown) for Monday's test. Turn pump off. Record recovery. Sample treatment effluent for field GC and lab analysis. 15:00 - End of recovery data collection. Remove/download data recorders. Collect water- level measurements. 16:00-17:00 - Reset data recorders; linear scale, 30 minute intervals for pre-pumping measurements over Saturday and Sunday. 7:30-8:30 - Collect water levels. 8:30-9:30 - Reset data recorders for delayed start at 10:00 a.m., log cycle intervals not exceeding 30 second intervals. 10:00 - Start 24-hour continuous rate pumping test at MW-6. Pump rate should have been preset on Friday (between 2 to 8 gpm). 11:30 - Sample influent to treatment system for field GC and lab analysis. 12:00 (noon) - Sample effluent for field GC and lab analysis. Continue to collect influent and effluent every 2 hours for field GC analysis. Measure complete round of water-levels (including data recorders with drop pipes and non-data recorder locations) on an hourly basis until 14 hours (12:00 midnight) into pump test. After 14 hours measure complete rounds every 2 hours. GERAGHTY & MILLER, INC. TUT 006 .171! Table 1. Anticipated Schedule for Pumping Tests, Tutu Service Station Investigation, St. Thomas, U.S. Virgin Islands. Date and Personnel Action Tues., Nov. 10, 1992 9:00 - Sample influent and effluent for field GC and C. Moffatt lab analysis. R. Ponciano D. McGregor 10:00 - End of 24-hour test. If possible "step" Soil Tech recorder to record recovery. Stop pump and record recovery. 14:00 - Check recovery. If recovery is equal to or greater than 85 percent complete, remove data recorders. Collect full round of water-level measurements. #PR01301-wp3/102692.tbl GERAGHTY & MILLER, INC. TUT O06 1719