VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

Amendment 1 RFP 043 T 2019 P

Collection
Contracts & Procurement
Sub-shelf
dpp.vi.gov (Property and Procurement contracts)
Kind
Contract
Date
2024-02-06
Topics
Procurement, Disaster Recovery
Pages
2
Text
OCR Text

Department of Property & Procurement SE > cant MEN. Government of the United States Virgin Islands 3274 ESTATE RICHMOND, CHRISTIANSTED, U. S. VIRGIN ISLANDS 00820 fmt 8201 SUB BASE, SUITE 4, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 ~ ener ent ATES ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ane eee ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.777.9587 HTTP://DPPRVI.GOV October 21, 2019 AMENDMENT #1 — RFP-043-T-2019 (P) - CAHS Gym Repair Design Build Project Questions and Answers ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMENT WITH THEIR BID PROPOSAL Questions and Answers: Question 1: Please confirm that the Scope of Work is for Professional Services for the following: !.. Engineering Analysis of the hurricane damaged roofing system, roofing guttering and the downspout.system. 2.. Architectural & Engineering Design (Coiistruction documents) 3. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2019/10/Amendment-1-RFP-043-T-2019-P.pdf

SHA-256 98596e19253f4111dfb15750c851fb94ce7da3512c287aca80f5b04bcc623a16

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-98596e19253f

Document text

Department of Property & Procurement SE > cant MEN. Government of the United States Virgin Islands 3274 ESTATE RICHMOND, CHRISTIANSTED, U. S. VIRGIN ISLANDS 00820 fmt 8201 SUB BASE, SUITE 4, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 ~ ener ent ATES ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ane eee ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.777.9587 HTTP://DPPRVI.GOV October 21, 2019 AMENDMENT #1 — RFP-043-T-2019 (P) - CAHS Gym Repair Design Build Project Questions and Answers ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMENT WITH THEIR BID PROPOSAL Questions and Answers: Question 1: Please confirm that the Scope of Work is for Professional Services for the following: !.. Engineering Analysis of the hurricane damaged roofing system, roofing guttering and the downspout.system. 2.. Architectural & Engineering Design (Coiistruction documents) 3. The construction work to make the repairs according to the Construction Documents Response to Question | The Scope of Work is for Design Build Professional Services for the following: [. Engineering analysis of the hurricane damaged roofing system, adjacent parameter wall repairs, roofing guttering system, and the downspout system. . 2. Architectural & Engineering Design (Construction documents) and permitting; 3. The construction work to-make the repairs according to the VIDE/DPNR approved Construction Documents. Ouestion 2 In addition to the Contractor's Architectural & Engineering Design and Project Management Qualifications, the RFP is: requesting an overall project cost. Please confirm that this RFP is for Professional Services Qualifications only and the-overall project cost is not considered in this RFP; since. the cost cannot be determined unti] the analysis and design iscomplete. Responsé to Question 2 This RFP will not be awarded based on qualifications only. A complete-project cost. for both the engineering work and construction work efforts are required to be submitted in the cost proposal]. Please refer to the rating sheet provided with the RFP, which outlines the rating criteria for contract award.. Question 3 What documents are available to aid in the preparation of the proposal, such as performance specifications, design or operational parameters, or plans of the existing facility? Response to Question 3 Currently, there are no existing plans for the CARS gym. It is anticipated that the selected contractor will work: with the VIDE's Engineer and Witt O'Brien in collaboration with the permits office in developing an overall acceptable level of. repairs that. will be considered d “Cat-B” work. Finished work’should keep the gym roofing system & guttering system watertight & functional for a minimum of five (5) years,