Tutu Well Site, St. Thomas, U.S. Virgin Islands, Monthly Progress Report #39, April 1995
\7 de maximis TUTU WELL SITE, ST. THOMAS. U.S. VIRGIN ISLANDS MONTHLY PROGRESS REPORT #39 APRIL 1995 WORK COMPLETED DURING PREVIOUS MONTH • Received preliminary comments from the U.S. Environmental Protection Agency (USEPA) on the Draft Feasibility Study (FS) Report on April 14, 1995. • Submitted the Final Phase II Rl Report to the USEPA on April 7, 1994. • Assisted USEPA in preparation for the public availability meeting to be held in St. Thomas on April 18, 1995. Also prepared for and participated in a PRP meeting on April 19, 1995 in St. Thomas to discuss the draft FS. WORK TO BE COMPLETED DURING NEXT MONTH Meet with EPA to discuss the Draft FS report. FILE: 30M/309OA.07 (Wt-391 TL)T OO6 0436 o *64584* 64584
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://semspub.epa.gov/src/document/02/64584
SHA-256 99184a482ec456dba8704d3d4c5de7d106c634c688fc407b128db3d9f297bfdb
Re-using this document
CERCLA administrative record
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-99184a482ec4
Document text
\7 de maximis TUTU WELL SITE, ST. THOMAS. U.S. VIRGIN ISLANDS MONTHLY PROGRESS REPORT #39 APRIL 1995 WORK COMPLETED DURING PREVIOUS MONTH • Received preliminary comments from the U.S. Environmental Protection Agency (USEPA) on the Draft Feasibility Study (FS) Report on April 14, 1995. • Submitted the Final Phase II Rl Report to the USEPA on April 7, 1994. • Assisted USEPA in preparation for the public availability meeting to be held in St. Thomas on April 18, 1995. Also prepared for and participated in a PRP meeting on April 19, 1995 in St. Thomas to discuss the draft FS. WORK TO BE COMPLETED DURING NEXT MONTH Meet with EPA to discuss the Draft FS report. FILE: 30M/309OA.07 (Wt-391 TL)T OO6 0436 o *64584* 64584