VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

PROPOSED PROJECT LIST

Collection
Executive Agency Records
Sub-shelf
Public Works
Kind
Government Report
Date
2026
Pages
7
Text
Native Text

PROPOSED PROJECT LIST Map Label Project Name Project Description Project Type STJ-1 Bordeaux Mountain Rd (Rte 108) from Centerline Rd (Rte 10) to Rte 107, Bus Service Expansion Bus service along Bordeaux Mountain Road (Route 108) from Centerline Road (Route 10) to Route 107 Transit Project STJ-2 Centerline Rd (Rte 10) & King’s Hill Rd (Rte 20), Park & Ride Facility Build Park & Ride by Centerline Road (Route 10) and King's Hill Road (Route 20) New Roadway Facility STJ-3 Centerline Rd (Rte 10) at Gift Hill Rd (Rte 204), Myrah Keating Clinic Park & Ride Park & Ride lot at Myrah Keating Clinic on Centerline Road (Route 10) at Gift Hill Road (Route 204) Transit Project STJ-4 Centerline Rd (Rte 10), Safety & Roadway Improvements Roadway improvements on Centerline Road (Route 10): sidewalks, shoulders, crumbling cliff repairs, blind corners between Coral Bay and Cruz Bay, widen road from Cruz Bay to North Shore Road (Route 20) Safety and Operational Improvement STJ-5 Cruz Bay, Peak-Hour Congestion Management Strategy Congestion management strategy for Cruz Bay, reduce car traffic in peak c …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpw.vi.gov/wp-content/uploads/2026/03/USVI-2050-Masterplan_Project-Maps-and-Tables_Share-Public-Draft_.pdf

SHA-256 9acdff10e8caf0ab65a11301acb43526304ac3405880169186455a80cb598811

Re-using this document

territorial public record

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-9acdff10e8ca

Document text

PROPOSED PROJECT LIST Map Label Project Name Project Description Project Type STJ-1 Bordeaux Mountain Rd (Rte 108) from Centerline Rd (Rte 10) to Rte 107, Bus Service Expansion Bus service along Bordeaux Mountain Road (Route 108) from Centerline Road (Route 10) to Route 107 Transit Project STJ-2 Centerline Rd (Rte 10) & King’s Hill Rd (Rte 20), Park & Ride Facility Build Park & Ride by Centerline Road (Route 10) and King's Hill Road (Route 20) New Roadway Facility STJ-3 Centerline Rd (Rte 10) at Gift Hill Rd (Rte 204), Myrah Keating Clinic Park & Ride Park & Ride lot at Myrah Keating Clinic on Centerline Road (Route 10) at Gift Hill Road (Route 204) Transit Project STJ-4 Centerline Rd (Rte 10), Safety & Roadway Improvements Roadway improvements on Centerline Road (Route 10): sidewalks, shoulders, crumbling cliff repairs, blind corners between Coral Bay and Cruz Bay, widen road from Cruz Bay to North Shore Road (Route 20) Safety and Operational Improvement STJ-5 Cruz Bay, Peak-Hour Congestion Management Strategy Congestion management strategy for Cruz Bay, reduce car traffic in peak commuting hours Congestion Management STJ-6 East End Rd (Rte 10) from Rte 107 & Rte 108 to Pond Bay, Guardrail Installation Guardrails needed along East End Road (Route 10) from Route 107 and Route 108 to Pond Bay Safety and Operational Improvement STJ-7 Enighed Car Ferry Terminal, Access Circulation Study and Road Closure Plan Close off road next to connections to Car Ferry Terminal – Access circulation study Congestion Management STJ-8 Enighed Car Ferry Terminal, Parking Expansion New parking at car ferry at Enighed Congestion Management STJ-9 Gerda N. Marsh Dr West / North Shore Rd / Prindsens Gade / Wharf Bypass / Southside Rd / Coral Bay–East End Rd, Active Transportation Study Gerda N. Marsh Drive West, North Shore Road, Prindsens Gade, Wharf Bypass, Southside Road, Coral Bay / East End Road active transportation study Pedestrian and Bicycle Project STJ-10 Gift Hill Rd & South Shore Rd Bus Service Expansion Provide bus service and bus shelter on Gift Hill Road, south of South Shore Road and bus service along South Shore Road Transit Project STJ-11 John Head Rd (Rte 206), North–South Connection between Rte 20 & Rte 10 Pave John Head Road (Route 206) to provide north-south connection between North Shore Road (Route 20) and Centerline Road (Route 10) Safety and Operational Improvement STJ-12 Johnny Horn Trail / Rte 109, Pavement Improvements Pave Johnny Horn Trail / Route 109 Safety and Operational Improvement STJ-13 King’s Hill Rd (Rte 20) east of Centerline Rd (Rte 10), Roadway Paving Complete paving of King’s Hill Road (Route 20) east of Centerline Road (Route 10) Safety and Operational Improvement STJ-14 King’s Hill Rd Bus Shelter Construction (Rte 20, Rte 107, Centerline Rd) Build bus shelters at both ends of King's Hill Road (Route 20) at Route 107 (and at Centerline Road/Route 10) Transit Project STJ-15 National Park Area, Alternate Route Identification & Implementation Strategy Evaluate pavement and design conditions of roads leading to the National Park Identify potential alternate route and develop strategy for planning and implementation Identify jurisdictions of all roads / paths servicing the National Park Operations Maintenance and System Preservation STJ-16 Passenger Ferry Vehicle & Rental Car Access Coordination Program Better coordinate access by car / rental car companies for the passenger ferries Congestion Management STJ-17 Rte 107 in Coral Bay & Johnson Bay, Sidewalk Priority Improvements Sidewalk priority along Route 107 in Coral Bay and Johnson Bay Pedestrian and Bicycle Project STJ-18 Rte 107 south of Bordeaux Mountain Rd (Rte 108), 4R Improvements with Pedestrian Enhancements Resurfacing, restoration, rehabilitation, and reconstruction of Route 107 south of Bordeaux Mountain Road (Route 108) to include pedestrian improvements Safety and Operational Improvement STJ-19 Rte 109 / Johnny Horn Trail, Extension to Annaberg Extend Route 109 / Johnny Horn Trail to Annaberg New Roadway Facility STJ-20 Rte 204 Corridor, North–South Connection between Rte 20 & Rte 10 Pave Route 204 to provide north-south connection between North Shore Road (Route 20) and Centerline Road (Route 10) Safety and Operational Improvement STJ-21 South Shore Rd from Reef Bay Rd to Cocoloba Point (Rte 107), New Road Connection Build South Shore Road connecting Reef Bay Road to Cocoloba Point at Route 107 New Roadway Facility STJ-22 VITRAN and Ferry Schedule Coordination Initiative Coordinate Ferry schedule with VITRAN bus schedule Transit Project DRAFT PROPOSED PROJECT LIST DRAFT PROPOSED PROJECT LIST Map Label Project Name Project Description Project Type STT-1 Alton Adams Rd (Route 38) & William G. Lewis Ln from Lovers Ln to King Bay Rd, Sidewalk Improvements Sidewalks near hospital and shopping center in Alton Adams Road (Route 38) and William G. Lewis Lane from Lovers Lane to King Bay Road Pedestrian and Bicycle Project STT-2 Bordeaux Bay Rd from Sandy Bay to Fortuna Rd (Rte 30) & West End Rd, Corridor Improvements Bordeaux Bay Road from Sandy Bay to Fortuna Road (Route 30) (South Shore) and to West End Road (North Shore) New Roadway Facility STT-3 Charlotte Amalie Harbor to Red Hook, Ferry Service & Downtown Marine Infrastructure Improvements Ferry service Charlotte Amalie Harbor to Red Hook, infrastructure improvements for downtown water transportation system Transit Project STT-4 Charlotte Amalie, Elevated Parking Garage Development Elevated parking garage in Charlotte Amalie Congestion Management STT-5 Crown Mountain Rd (Rte 33) from Veterans Dr (Rte 30) to Hull Bay Rd (Rte 37) / Skyline Dr (Rte 40), Sidewalks & Bus Shelters Sidewalks and bus shelters on Crown Mountain Road (Route 33) from Veterans Drive (Route 30) to Hull Bay Road (Route 37) / Skyline Drive (Route 40) Pedestrian and Bicycle Project STT-6 Elizabeth Switchback & Scott Free Rd Improvement Project Improvement of switchback in Elizabeth at Crown Mountain Road (Route 33) and Scott Free Road Safety and Operational Improvement STT-7 Emile Milo Francis Memorial Dr / Smith Bay Road, Sidewalk Widening & Stormwater Improvements Widen sidewalks and improve stormwater management on Emile Milo Francis Memorial Drive/Smith Bay Road Pedestrian and Bicycle Project STT-8 Express Shuttle Service: Red Hook, Tutu Park Mall, Nadir, Bovoni, Havensight, Downtown Charlotte Amalie Express shuttle bus service from: Red Hook Ferry Dock to Downtown Charlotte Amalie, Red Hook to Tutu Park Mall, Nadir going west to Bovoni, Havensight to Downtown Charlotte Amalie Transit Project STT-9 Ferry Boat Acquisition Ferry boat acquisition Transit Project STT-10 Lindbergh Bay Area, Safe Streets Improvements Add safe street elements to the roads connecting the campus to the rest of the Lindbergh Bay Pedestrian and Bicycle Project STT-11 Mahogany Run Rd (Rte 42) to Tutu Park Mall, Lovenlund Transit Rte New transit route (Lovenlund Route) along Mahogany Run Road (Route 42) from Tutu Park Mall Transit Project STT-12 Patriot Manor Transit Service Expansion Patriot Manor – expanding transit service Transit Project STT-13 Raphune Hill Rd / Weymouth Rhymer Hwy (Rte 38) to Donoe Rd, Rd Widening & Sidewalk/Bike Path Widen Raphune Hill Road / Weymouth Rhymer (Route 38) to 4 lanes and add sidewalk and bike path to Donoe Road Congestion Management STT-14 Red Hook, Bovoni, Tutu, Smith Bay Sidewalk and Curb Cuts Sidewalk at the following locations: Red Hook, Bovoni with curb cuts, Tutu intersection to Red Hook with curb cuts, Smith Bay to Tutu with curb cuts Safety and Operational Improvement STT-15 Rte 379 at Roundabout, Retaining Wall Extension (~110 ft) Support Route 379 with additional retaining walls from roundabout intersection extending approximately 110' Safety and Operational Improvement STT-16 Rte 42 from Rte 35 to Rte 40, Design & Construction Design construction Route 42 from intersection with Route 35 to intersection with Route 40 Safety and Operational Improvement STT-17 Smith Bay Rd (Rte 38), Green Infrastructure Drainage Improvements Utilize green infrastructure to improve drainage on Smith Bay Road Operations Maintenance and System Preservation STT-18 Smith Bay Rd (Rte 38) & Rte 32, Expansion & Pedestrian Upgrades Improvement / road expansion and pedestrian improvements at Smith Bay Road (Route 38) and Route 32 (Red Hook Ferry Terminal area) Safety and Operational Improvement STT-19 Subbase Rd (Rte 304), Bus Pull-Off near Pueblo Supermarket Bus pull off near Pueblo Supermarket in Subbase Road (Route 304) Transit Project STT-20 Tutu Park Mall Area, Traffic Analysis & Management Improvements Perform a Tutu Mall area traffic analysis to identify congestion issues and develop and implement traffic management design improvements Congestion Management STT-21 Valdemar Hill Jr Dr / Route 40 from Rte 35 to Rte 39, Pavement Preservation Valdemar Hill, Jr. Drive pavement preservation, Route 40 from intersection with Route 35 to intersection with Route 39 Safety and Operational Improvement STT-22 Veterans Dr, Phase 2 Phase 2 of widening and reconstruction of Veterans Dr to enhance pedestrian and vehicular safety, and drainage Pedestrian and Bicycle Project STT-23 Water Island, Dock Conditions Assessment & Repair Study Complete a dock conditions assessment on Water Island to identify current conditions and elements in need of repair Operations Maintenance and System Preservation STT-24 Waterfront Area, Traffic Signal Timing Optimization Perform a traffic signal timing optimization along the waterfront Operations Maintenance and System Preservation STT-25 Weymouth Rhymer Hwy (Rte 38) to Bovoni Rd (Rte 30), North– South Connector Rd New road north / south connecting Weymouth Rhymer (Route 38) to Bovoni Road (Route 30). Alternative to Bovoni Road and Turpentine Run Road / Mariendahl Road (Route 32) New Roadway Facility STT-26 Weymouth Rhymer Hwy to Fortuna Rd Corridor, Multiuse Path Create a multiuse path that travels along Weymouth Rhymer Highway (Charlotte Amalie), Emile Milo Francis Memorial Drive (Red Hook), Lionel Pierre Berry Scenic Drive (Carey Bay Estate), Fortune Road (Fortuna) Pedestrian and Bicycle Project STX/STT-1 St. Thomas (STT) to St. Croix (STX), Passenger Ferry Service Establish passenger ferry service between STT and STX Transit Project DRAFT PROPOSED PROJECT LIST DRAFT PROPOSED PROJECT LIST Map Label Project Name Project Description Project Type STX-1 Centerline Rd / Melvin H. Evans Hwy / Queen Mary Hwy, Multiuse Path Create a multiuse path that travels along Centerline Road, Melvin H. Evans Highway, Queen Mary Highway Pedestrian and Bicycle Project STX-2 Clifton Hill Connector at Queen Mary Hwy (Rte 70) & Rte 75, Intersection Improvements Intersection improvements at Clifton Hill Connector (Queen Mary Highway (Route 70) and Route 75 Safety and Operational Improvement STX-3 East Scenic Rd, Roadway Improvements East Scenic Road improvements Safety and Operational Improvement STX-4 Ethel McIntosh Memorial Dr / Mahogany Rd (Rte 76) east of Jolly Hill, Safety Improvements Ethel McIntosh Memorial Drive / Mahogany Road (Route 76) safety improvements east of Jolly Hill Safety and Operational Improvement STX-5 Five Corners Intersection Analysis (Northside Rd Area) Five Corners intersection (Northside Road area) – intersection analysis Safety and Operational Improvement STX-6 Frederiksted Roads, Pavement Rehabilitation & Drainage Improvements Pavement rehabilitation and drainage improvements for Frederiksted roads Operations Maintenance and System Preservation STX-7 Hess Rd (Rte 681) from Centerline Rd (Rte 70) to Rte 68, Rd Improvements Road improvements on Hess Road (Route 681) from Centerline Road (Route 70) to Route 68 Congestion Management STX-8 La Reine Intersection Improvement: Rte 75 & Rte 70 La Reine intersection improvements at Route 75 and Route 70 Safety and Operational Improvement STX-9 Maroon Land Area, Greenway Expansion for Equestrian & Pedestrian Connectivity Expand greenway infrastructure in Maroon Land that supports equestrian access and pedestrian connectivity Pedestrian and Bicycle Project STX-10 Melvin Evans Hwy (Rte 66), Congestion Management Improvements Improve Melvin Evans Highway (Route 66), congestion management Congestion Management STX-11 Midland Rd (Rte 72), Pavement Rehabilitation Improve substandard pavement conditions on Midland Road (Route 72) from River Road (Route 69) to west of Casper Holstein Drive (Route 65) Pedestrian and Bicycle Project STX-12 North Shore Scenic Rd (Rte 78) from River Rd (Rte 69) to Hams Bluff / Rte 63, Bike Path North Shore Scenic Road (Route 78) and bike path from River Road (Route 69) to Hams Bluff (Bay) / Route 63 Pedestrian and Bicycle Project STX-13 Northside Rd (Rte 75) from Queen Mary Hwy (Rte 70) to King St, Rd Improvements Improve Northside Road (Route 75) from Queen Mary Highway (Route 70) to King Street Islandwide Project STX-14 Orange Grove & Contentment Rd Roundabout (Rte 70 & Rte 708) Orange Grove and Contentment Road intersection Route 70 & Route 708 roundabout Safety and Operational Improvement STX-15 Queen Mary Hwy / Centerline Rd (Rte 70), Upgrades Improve Queen Mary Highway / Centerline Road (Route 70) Safety and Operational Improvement STX-16 Queen Mary Hwy (La Reine to Sunny Isle), Pedestrian/Bike Path Project Pedestrian / bike path along Queen Mary Highway (close to Route 75) – La Reine to Sunny Isle Pedestrian and Bicycle Project STX-17 Queen Mary Hwy (Rte 70) at Golden Grove (Rte 705) & Rte 669, Signalization Improvements Signal warrants to relieve congestion by Grove Place (Queen Mary Highway (Route 70) and Golden Grove Route 705 and Route 669) (2 warrants) Congestion Management STX-18 Rte 66 & Rte 68, Intersection Improvements Intersection improvements at Route 66 and Route 68 Safety and Operational Improvement STX-19 Rte 68 to Hess Rd, Roadway Realignment Route 68 proposed re-alignment to Hess Road Safety and Operational Improvement STX-20 Rte 709 from Rte 66 to Rte 68, Rd Extension Create roadway extension of Route 709 from Route 66 to Route 68 New Roadway Facility STX-21 Rte 72 & River Rd (Rte 669), Bridge Replacement & Bypass Design Design and replace 4 bridges, potential bypass – Route 72 and River Road (Route 669) [bridges on Route 7025, Route 669, and Route 70] New Roadway Facility STX-22 Southside Rd (Rte 62) from Rte 70 to Cramer Park, Cruzan Bike Path Proposed bike path / Cruzan Bike Path along Southside Road (Route 62) from Route 70 to Cramer Park (now being acquired) Pedestrian and Bicycle Project STX-23 Spring Gut Rd (Rte 85) at Rte 62, Roadway Improvements Spring Gut Road (Route 85) improvements from intersection with Route 62 Islandwide Project STX/STT-1 St. Thomas (STT) to St. Croix (STX), Passenger Ferry Service Establish passenger ferry service between STT and STX Transit Project DRAFT PROPOSED PROJECT LIST DRAFT PROPOSED PROJECT LIST Map Label Project Name Project Description Project Type USVI-1 Territorywide, Heritage Streetscape and Complete Streets Design Standards Create design standards in mixed-use areas to promote heritage and placemaking and improve pedestrian experience (sidewalk widths, bike lanes, street amenities, etc.) Pedestrian and Bicycle Project USVI-2 Territorywide, Private Streets and Roadways, Long-Term Maintenance Enforcement Framework Explore options for legal mechanisms that would allow DPW and DPNR to enforce the long-term maintenance of private streets and roadways Operations Maintenance and System Preservation USVI-3 Territorywide, Roadway Incident Quick-Clearance Policy New policy for roadway incidents. Require drivers to move to the side of the road instead of staying in the middle of the road Safety and Operational Improvement USVI-4 Territorywide, Truck Route Hierarchy and Industrial-Standard Roadway Program Explore opportunities to develop stricter road hierarchies and designate routes for specific types of vehicle traffic to keep regular truck traffic out of residential areas and other sensitive zones. Roads in areas with high truck traffic should be constructed and maintained to industrial road standards Safety and Operational Improvement DRAFT