MAIN STREET ENHANCEMENT PROJECT Contractor's Name: Charlotte Amalie, St. Thomas, U. S. Virgin Islands Contractor's Address: BID SCHEDULE 3 - ALTERNATE NO.1 (WAPA EXTRA WORK) Date: IFB No. Item No. Description Estimated Quantity Units Unit Price TOTAL 1 12" AWWA C-900 PVC Water Main Class 200 DR 14 (Includes but not limited to pipes, necessary bends, restraint fittings, excavation, backfill & compaction and necessary labor to install) 630 LF Dollars and Cents 2 6" AWWA C-900 PVC Water Main Class 200 DR 14 (Includes but not limited to pipes, necessary bends, restraint fittings, excavation, backfill & compaction and necessary labor to install) 805 LF Dollars and Cents 3 4" AWWA C-900 PVC Water Main Class 200 DR 14 (Includes but not limited to pipes, necessary bends, restraint fittings, excavation, backfill & compaction and necessary labor to install) 250 LF Dollars and Cents 4 2" SCH 80 PVC Water Main (Includes but not limited to pipes, necessary bends, restraint fittings, excavation, backfill & compaction and necessary labor to install) 800 LF Dollars and Cents 5 12" AVK Wedge Gate Val …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2017/08/Bid-Schedule-NO-3-Sheets-D-13-D-15.pdf

SHA-256 a12e05b376ed6827ace4fc907401dff0982905ec2ab78eb212b81f8eb208537c

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-a12e05b376ed

Document text

MAIN STREET ENHANCEMENT PROJECT Contractor's Name: Charlotte Amalie, St. Thomas, U. S. Virgin Islands Contractor's Address: BID SCHEDULE 3 - ALTERNATE NO.1 (WAPA EXTRA WORK) Date: IFB No. Item No. Description Estimated Quantity Units Unit Price TOTAL 1 12" AWWA C-900 PVC Water Main Class 200 DR 14 (Includes but not limited to pipes, necessary bends, restraint fittings, excavation, backfill & compaction and necessary labor to install) 630 LF Dollars and Cents 2 6" AWWA C-900 PVC Water Main Class 200 DR 14 (Includes but not limited to pipes, necessary bends, restraint fittings, excavation, backfill & compaction and necessary labor to install) 805 LF Dollars and Cents 3 4" AWWA C-900 PVC Water Main Class 200 DR 14 (Includes but not limited to pipes, necessary bends, restraint fittings, excavation, backfill & compaction and necessary labor to install) 250 LF Dollars and Cents 4 2" SCH 80 PVC Water Main (Includes but not limited to pipes, necessary bends, restraint fittings, excavation, backfill & compaction and necessary labor to install) 800 LF Dollars and Cents 5 12" AVK Wedge Gate Valve 2 EA Dollars and Cents 6 6" AVK Gate Valve 1 EA Dollars and Cents 7 4" AVK Gate Valve 2 EA Dollars and Cents 8 2" Curb Valve - Complete connection apprtenances for the 2-inch taps on 6" and 4" Mains (Includes saddle, corporation, curb stop,piping and all necessary work as stated above) 1 EA Dollars and Cents Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Main Street Enhancement Bid Schedule - Sheet D-14 Item No. Description Estimated Quantity Units Unit Price TOTAL 9 1" Air Vacuum/Release Valve (Valmatic) (Includes 1" saddle, corporation stop, 1" curb stop, 1" pipe, vault housing or meter box and all other necessary materials, equipment and labor to install - for 12, 8,6 and 2-inch) 1 EA Dollars and Cents 10 Complete connection appurtenances for the 1-inch taps on 12" main (Includes saddle, corporation, curb stop, piping and all necessary work as stated above) 15 EA Dollars and Cents 11 Complete connection appurtenances for the 1-inch taps on 6" main (Includes saddle, corporation, curb stop, piping and all necessary work as stated above) 25 EA Dollars and Cents 12 Complete connection appurtenances for the 1-inch taps on 4" main (Includes PVC cemented Tees, curb stop, piping and all necessary work as stated above) 20 EA Dollars and Cents 13 Complete connection appurtenances for the 1-inch taps on 2" main (Includes saddle, corporation, curb stop, piping and all necessary work as stated above) 12 EA Dollars and Cents 14 6" x 2" Saddle 4 EA Dollars and Cents 15 6" x 6" x 4" Tee 1 EA Dollars and Cents 16 12" x 12" x 6" Tee 3 EA Dollars and Cents 17 12" x 12" x 4" Tee 1 EA Dollars and Cents 18 12" x 12" x 12" Tee 1 EA Dollars and Cents Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Unit Price (Words) Main Street Enhancement Bid Schedule - Sheet D-15 Item No. Description Estimated Quantity Units Unit Price TOTAL 19 12" X 12" Reducer 2 EA Dollars and Cents 20 4" x 4" x 4" Tee 1 EA Dollars and Cents 21 6" x 6" x 6" Tee 2 EA Dollars and Cents 22 Fire Hydrants, Including Tee and Gate Valve - Locations as specified by Engineer in the field 3 EA Dollars and Cents 23 Traffic Control - This work shall consist of furnishing traffic control devices and services for the control and protection of traffic through areas of construction in accordance with the contrat documents in conformity to the requirements of the DPW and Public Safety Department 1 LS Dollars and Cents 24 Hot Mix Asphalt for reinstatement of road surfaces cut for pipe work. Based on scale tickets of asphalt brought to site for use. 85 Tons Dollars and Cents Unit Price (Words) Unit Price (Words) Unit Price (Words) IFB NO.___________________ PROJECT NO. Q-NH-000E (011) ATTENTION: See notes at the beginning of this unit price schedule. TOTAL AMOUNT OF THIS PROPOSAL, BASED ON ENGINEER’S ESTIMATE OF QUANTITIES IS AS FOLLOWS: ___________________________________________________DOLLARS______________________CENTS $__________________________________________________ ____________________________ BIDDER’S SIGNATURE Unit Price (Words) Unit Price (Words) Unit Price (Words)