VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

Sub-divider/developer submits to

Collection
Research & Technical Reports
Sub-shelf
dpnr.vi.gov
Kind
Research Report
Pages
1
Text
Native Text

Sub-divider/developer submits to CCZP Application for Preliminary Subdivision, 3 copies of Engineering Plans, a copy of DEP Environmental Clearance Letter or CZM Permit, SHPO’s and DFW’s comments and other pertinent data. CCZP reviews Plat and Plans, and acts on the submission within 30 days. Sub-divider/developer obtains approval of Preliminary Plat and Engineering Plans from DPNR Commissioner (Approval is effective for a maximum of 12 months, with provision for 6-month extension). Informal Pre-application meeting Sub-divider/developer meets with Planning Staff (CCZP) to discuss feasibility of project. Sub-divider/developer submits (sketch) proposed Plat to DPNR’s Divisions of SHPO & FW. Sub-divider/developer submits proposed Plat To CCZP. Sub-divider/developer obtains comments on project from SHPO & DFW. Sub-divider/developer submits proposed Plat to DPNR’s Div. of Environmental Protection (DEP) for Tier 2 property, and DPNR’s Div. of Coastal Zone Management (CZM) for Tier 1 land. Sub-divider/developer obtains Tier 1-CZM Permit. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpnr.vi.gov/wp-content/uploads/2022/11/flow_chart_for_subdivision_approval-1.pdf

SHA-256 ab06f31d099f6608a06d050cbdb8911308af60ebcfbaf41481133fda88f7a118

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-ab06f31d099f

Document text

Sub-divider/developer submits to CCZP Application for Preliminary Subdivision, 3 copies of Engineering Plans, a copy of DEP Environmental Clearance Letter or CZM Permit, SHPO’s and DFW’s comments and other pertinent data. CCZP reviews Plat and Plans, and acts on the submission within 30 days. Sub-divider/developer obtains approval of Preliminary Plat and Engineering Plans from DPNR Commissioner (Approval is effective for a maximum of 12 months, with provision for 6-month extension). Informal Pre-application meeting Sub-divider/developer meets with Planning Staff (CCZP) to discuss feasibility of project. Sub-divider/developer submits (sketch) proposed Plat to DPNR’s Divisions of SHPO & FW. Sub-divider/developer submits proposed Plat To CCZP. Sub-divider/developer obtains comments on project from SHPO & DFW. Sub-divider/developer submits proposed Plat to DPNR’s Div. of Environmental Protection (DEP) for Tier 2 property, and DPNR’s Div. of Coastal Zone Management (CZM) for Tier 1 land. Sub-divider/developer obtains Tier 1-CZM Permit. Sub-divider/developer obtains written disapproval stating reasons, corrects Plat/Plans and resubmits to CCZP. Sub-divider/developer obtains DPW’s Engineering Division approval for road design, easements, drainage/culvert design systems. Sub-divider/developer obtains DEP’s Storm-Water Management and/or Earth Change approval(s). Sub-divider/developer consults with Waste Management Authority (when applicable), WAPA and VIYA regarding the installation of required infrastructure. Sub-divider/developer submits application for Final Plat to CCZP. Sub-divider/developer obtains written Approval of Final Plat within 30 days Sub-divider/developer submits approved Final Plat to Lt. Governor’s Cadastral Office for recording. PROCEDURE FOR ALL SUBDIVISION DEVELOPMENT PROPOSALS Sub-divider/developer develops site per the specification of all approvals, and installs all requisite infrastructures, e.g. road, potable water/sewer, telephone, cable and light.