VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

AMENDMENT SEVEN 7 IFB020DPPC19 C

Collection
Contracts & Procurement
Sub-shelf
dpp.vi.gov (Property and Procurement contracts)
Kind
Contract
Date
2024-02-06
Topics
Procurement
Pages
2
Text
OCR Text

Department of Property&Procurement Govemment of the United States Virgin Islands 3274 Estate RICHMOND, CHRISTIANSTED, U.S. VIRGIN ISLANDS 00820 8201 Sus BASE, 3RD FLOOR, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.774.9587 HTTP://DPP.VI.GOV April 17, 2019 AMENDMENT SEVEN (7) IFB020DPPC19 (C)- Repairs to Department of Property and Procurement’s Main Building and Central Stores located at 3274 Estate Richmond, St. Croix, V.I. INSERT: QUESTIONS AND ANSWERS Question 1: Item # 14 On the Conference room do we need to plaster both sides to match existing? Response: Yes. Question 2: On the demo of walls it does not state the baseboard needs to save and reuse? Please advise. Response: Save and reuse. Question 3: Item 23 does not say about removing any outlets, switches or data lines and replacing when new wall is being built. Response: Made changes to Scope of Work for clarification. Question 4: Item 24 Does the wall need sound insulation? Response: Yes. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpp.vi.gov/wp-content/uploads/2019/03/AMENDMENT-SEVEN-7-IFB020DPPC19-C.pdf

SHA-256 abf37faf80d29ae12f07d3cc385cfdff237abf72cb95514d1c6fca19c5ff713e

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-abf37faf80d2

Document text

Department of Property&Procurement Govemment of the United States Virgin Islands 3274 Estate RICHMOND, CHRISTIANSTED, U.S. VIRGIN ISLANDS 00820 8201 Sus BASE, 3RD FLOOR, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.774.9587 HTTP://DPP.VI.GOV April 17, 2019 AMENDMENT SEVEN (7) IFB020DPPC19 (C)- Repairs to Department of Property and Procurement’s Main Building and Central Stores located at 3274 Estate Richmond, St. Croix, V.I. INSERT: QUESTIONS AND ANSWERS Question 1: Item # 14 On the Conference room do we need to plaster both sides to match existing? Response: Yes. Question 2: On the demo of walls it does not state the baseboard needs to save and reuse? Please advise. Response: Save and reuse. Question 3: Item 23 does not say about removing any outlets, switches or data lines and replacing when new wall is being built. Response: Made changes to Scope of Work for clarification. Question 4: Item 24 Does the wall need sound insulation? Response: Yes. Question 5: Item 25,26, and 27 Will we have to demo the ceiling grid and tiles move lights and ac diffusers and replace back with same light fixtures or new? Response: Yes, demo grid and tiles, move lights, A/C diffusers and re-install existing light fixtures. Made changes to Scope of Work accordingly. Question 6: Items 28,29 and 30 Will we need to remove electrical outlets, baseboards, data and replace back? Response: Yes. Made changes to Scope of Work accordingly. Question 7: Item 36, When demo is done for ceiling light fixtures need to remove and replace as well? Response: Yes. Changes made to Scope of Work. Question 8: Item 39 Does new wall need insulation? Response: No. Question 9: ITEMS 44,45,46 and 47, Do these walls and ceilings need insulation? Does electrical, data and baseboards need to move and replace? Response: No insulation needed. Changes made to Scope of Work to reflect electrical, data, and baseboards. Question 10: In reference to the above bid on the original scope of work the air conditioning ducts and diffusers were to be replaced. On the new scope of work, it does not show the duct work. Is this item deleted from the scope? Response: Yes. That portion has been removed from the Scope of Work.