Amendment 2 IFB023DOPT19 C
one Department of Property&Procurement PRY Goverment of the United States Virgin Islands 2 3274 ESTATE RICHMOND, CHRISTIANSTED, U.S. VIRGIN ISLANDS 00820 EN 8201 Sus BASE, 3RD FLOOR, ST. THomas, U.S. VIRGIN ISLANDS 00802 Qi ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.777.9587 HTTP://DPP.VI.GOV March 25, 2019 AMENDMENT #2 -IFB023DOPT19 (c) — To Repair & Renovate Division of Personnel, located in the GERS building The Department of Property and Procurement is strongly recommending that bidders conduct a walk-through to encourage responsive bidding, due to modified Scope of Work. Please contact Ms. Oretha Connor: (340) 774-8588 or Email: oretha.connor@dop.vi.gov Also, see additional modifications: Vinyl Composition Tile (VCT) 12"x12"/1/8" thick commercial grade. Color to be selected by the owner Remove and Install Interior window fixed glass 4X4 including casement and wood trim ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMENT WITH THEIR BID PROPOSAL. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpp.vi.gov/wp-content/uploads/2019/03/Amendment-2-IFB023DOPT19-C.pdf
SHA-256 ad8c35d9656d3fd01f1da64d5f58589ee49e1e5e09cd20c5b19451cf3fbbda8a
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-ad8c35d9656d
Document text
one Department of Property&Procurement PRY Goverment of the United States Virgin Islands 2 3274 ESTATE RICHMOND, CHRISTIANSTED, U.S. VIRGIN ISLANDS 00820 EN 8201 Sus BASE, 3RD FLOOR, ST. THomas, U.S. VIRGIN ISLANDS 00802 Qi ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ST. CROIX FAX: 340.773.0986 | ST. THOMAS FAX: 340.777.9587 HTTP://DPP.VI.GOV March 25, 2019 AMENDMENT #2 -IFB023DOPT19 (c) — To Repair & Renovate Division of Personnel, located in the GERS building The Department of Property and Procurement is strongly recommending that bidders conduct a walk-through to encourage responsive bidding, due to modified Scope of Work. Please contact Ms. Oretha Connor: (340) 774-8588 or Email: oretha.connor@dop.vi.gov Also, see additional modifications: Vinyl Composition Tile (VCT) 12"x12"/1/8" thick commercial grade. Color to be selected by the owner Remove and Install Interior window fixed glass 4X4 including casement and wood trim ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMENT WITH THEIR BID PROPOSAL. SECTION 09651 — RESILIENT TILE FLOORING DEPARTMENT OF PERSONNEL — GERS BUJLDING THIRD FLOOR St. Thomas U.S. Virgin Istands PART 7 — GENERAL 1.1 RELATED DOCUMENTS A: Drawings and general provisions. of the Contract, including General and. Supplementary Conditions. and Division 1 Specification Sections, apply to-this Section. 1.2. SUMMARY A. This Section includes the.fallowing: 1. Vinyl composition floor tile. 2. Restlient wall base and accessories, B. Related Sections’ include the following: 1. Division 9 Section "Resilient Wall Base and Accessories" for resilient wall base, reducer strips, and.other accessories installed with resilient floor tiles. 1.3 SUBMITTALS A. Product Data: For each type of product specified. B. Samples for Initial. Selection: Manufacturers color charts. consisting of units or sections of units showing the full range of colors and patterns available for each type of product indicated. Cc. Samples: for Verification: Full-size:tiles-of each different color dnd pattern of résilient fioor tile specified, showing the full range of variations expected in these characteristics, 1, For resilient accessories, manufacturer's standard-size samples, but nat less than 12 inches (300 mm} long, of éach resilient accessory color and patfern specified. dD. Product Certificates:. Signed by manufacturers of resilient products certifying that: each product furnished complies with requirements. E. Maintenance Data: For resilient floor tile to include in the maintenance manvals Specified in Division 1. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced. installer 6 perform work-of this. Section who has specialized in installing resilient products similar fo thosé required for this Project and with. a record of successful in- service performance. 1.5 DELIVERY, STORAGE, AND HANDLING A, Deliver products to Project site in manufacturer's original, unopened cartons and containers, each bearing names of product and.manufacturér, Project identification, and shipping and handling instructions. B. Siore products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F {10‘and 32 deg Cc). Cc. Store tilés on flaf surfaces. D. Move products into spaces where they willbe installed-at least 48 hours:before installation, unless longer conditioning period is recommended in writing by: manufacturer. Paget of S- . GPESITIRESELEENT TELE FLOOGRINGAPERSONNEL DEPARTMENT THIRD FELGOR GERS BUSLOING ST THOMAS usvr SECTION 09651 — RESILIENT TILE FLOORING DEPARTMENT OF PERSONNEL ~ GERS BUILDING THIRD- FLOOR St. Thomas U.S. Virgin Islands ‘1.6 PROJECT CONDITIONS A. Maintain a: ternperature of not tess than 70. eg F (21 deg C} or more than 95.deg F (35 dég C} in spaces to receive products for at least 48 ‘hours before installation, — during installation, and for dt feast 48 hours after installation, unless manufacturer's wiitten. recommendations specify fongertime periods. After postinstallation period, maintain a temperature: ‘of not less‘than 55 deg F (13.deg €} or more than 95:deg F (35 dég C}. B. Do not install products, until they are at the same temperature as the. space where they are to be installed, C. Close spaces to traffic during flooring installation <nd for time period after installation recommended in writing by manufacturer. D, install tiles and accessories after other finishing operations, including painting, have been completed. E, Where: demountabie partitions and other items dre indicated for installation oh, top of resilient tite flooring, install fite- before these-items are installed. 1.7 EXTRA MATERIALS A. Furnish extra materials described: below. that match products insfdlled, aré. packaged with protective covering for storage, and are identified with labels describing contents. 1. Furnish not less than one box for each-.50 boxes-or fraction thereof, of each type, color, pattem, class, wearing surface, and sizé ‘of resilient tile flooring instedied. 2. Furnish not tess than 10.Jinear feet (3.linéar my for each 500 linear feet (150 linear m) or fraction fhereof, of each type, color, pattern,.and size of resilient accessory installed: 3. Deliver extra materials fo Owner. PART 2 - PRODUCTS 2.7 MANUFACTURERS A, Available Products: Subject fo compliance with requiremenis, products that may be incorporated into:the Work include, but are not limited to,. those indicated in the. Resilient Tile Flooring. Schedule shown Gn thé Drawings. 2:2 RESILIENT TILE A, Vinyl Composition Floor Tile: Products complying with ASTM F 1066.dnd-with requirements specified inthe Resilieni Tile Flooring Schedule. 2.3 RESILIENT ACCESSORIES A. Vinyt Wall Base: Products complying with FS SS-W-40, Type fi and: with: requirements specified in the Resilient Tile. Hearing Schedule, 2.4 INSTALLATION ACCESSORIES. A. Trowelable Leveting and Patching Compounds: Laiex-modified, portldnd-cement- based formulation provided or approved by flooring manufacturer for applications indicated. UPESESRESTLEENT TILE FLOORING! PERSONNEL GHPARTMENT THIRD FLOOR GERS BUILDING ST THOMAS USVT! SECTION 09651 - RESILIENT TILE FLOORING DEPARTMENT OF PERSONNEL ~ GERS BUILDING THIRD FLOOR St. Thomas: U. S. Virgin Islands: B. lAdhesives: Water-resistant type recommended by manufacturer to suit resilient products dnd.substrate conditions indicated. Cc. Mefai Edge Strips:. Extruded aluminum with mill finish of width shown, of height required to protect exposed edge of files, and in maximum available lengths to. ‘minimize running.joints, PART 3 = EXECUTION 3.1 EXAMINATION t A. Examine. substrates, areas, and conditions where installation of résilient products will ‘occur, with Installer: present; for compliance with manufacturers requirements. ‘Verify that substrates and conditions are satisfactory for. resilient product installation dnd comply with requirements specified. B. concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the ‘followin l. Slab substrates are dry and free of curing compounds, sealers, hardeners, and.other materials fhat may interfere with adhesive bond, Determine adhesion and dryness characteristics by performing bond and. moisture tests recommended by flooring manufacturer. 2. Subfloors are free.of cracks, ridges,.depressions, scale,.and. foreign deposits. C. Do not proceed with installation until Unsatisfactory conditions have been ! ‘corrected, 32 PREPARATION A, ‘General: Comply with resilient product manufacturer's written installation instructions for preparing substrates indicated: io receive resilient products. ‘Be Use trowelable leveling and patching. compounds, according to. manufacturer's wiitten instructions, to fill cracks, holes, and depressions in substrates. Cc. Remove: codtings, including curing compounds, and other substances that are: incompatible with flooring adhesives and that contdin sodp; wax, oll, or silicone, using mechanical methods recommended by: manufacturer. Do not use solvents. D. Broom and vacuum clean substrates to.be cavered immediately before product installation. After cleaning; examine subsirates for moisture, alkaline saits,. carbonation, or dust. Do/not proceed with installation until unsatisfactory conditions have.been corrected. 3.3 TILE INSTALLATION A. General: Comply with tile mahufacturér's written installation instructions. B.. Layout tiles from center marks established with principal walls, discounting minor offsets, so files at opposite edges of raom are.of equal width. Adjust as‘necessary to avoid using cut widilis that equal less than one-haif of a file at perimeter. 1. Lay files square with room axis, -uniess.otherwise indicated. Cc, Match tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and packaged, if so:humbered. Cut tiles neatly around all fixtures. Discard broken, cracked, chipped, or deformed tiles. Page's of 5- HQOCSEFRESELIENT THE FLOGRING:PERSONNEL DEPARTMENT THERD FLOOR GERS BUILDING a7 THOMAS. UBV? _ SECTION 09651 — RESILIENT TILE FLOORING: DEPARTMENT OF PERSONNEL ~-GERS BUILDING THIRD FLOOR St. Thomas U. S. Virgin Islands 1. Lay tiles with grain running in one direction. Scribe, cut,.and fit tiles to butt neatly and tightly te vertical surfaces and permanent fixtures, including. buill-in fumiture, cabinets, pipes, outlets, edgings,:door frames, ‘thresholds, and nosings. Extend tiles into toe spaces, door reveals, closets; and similar openings. Mainiain reference rriarkers, holes, and openings that are in place or marked for’ future cutting. by repeating on finish flooring as. marked on subfioor. Use chalk or other nonpermanent, nonstaining marking device. Adhere: tiles fo flooring substrates using a full spread of. adhesive applied to ‘substrate to comply with tile manufacturer's written instructions, inclucing those for trowel notching, adhesive mixing, and adhesive open.and working times. Provide completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other Surface imperfectioris. 1. Hand rolt-tiles according to file: manufacturer's written instructions. 3.4 RESILIENT ACCESSORY INSTALLATION j A. General: install resilient accessories according to manufacturer's written installation instructions. Apply resilient wall base to. watls,-columns, pilasters, casework.and cabinets.in toe spaces, and.other permanent fixtures.in rooms and areas where base is required, 1, Install wall base in lengths as tong:as practicable without gaps at seams: and with tops of adjacent pieces aligned. 2. Tightly.adhere wail base to substrate throughout length of edch piece, -with base In continuous contact with horizontal and vertical substrates.. ‘3. Do not stretch base: during installation. lon masonry surfaces or other similar irregutor substrates, fill voids along top.edge of resilient wall base with manufacturer's recommended adhesive filler: material. 1, install premolded outside and inside comers before installing straight pieces. Place resilient accessories so they are butted to adjacent materials and bond to substrates with adhesive. installreducer strips at edges of flooring that would otherwise: be exposed... 3.5 CLEANING AND PROTECTING A. Page 4 of 5° Perform ihe following operations immediately after installing resilient products: 1. Remove. achesive.and other surface blemishes using cleaner recommended. by. resilient product manufacturers. 2. Sweep or Vacuum floorthoroughly. 3 De not wash.floor. until after time period. recommended by flooring manufacturer,. 4. Damp-mop floor to remove marks and soil. Protect flooring against mars, marks, indentations, and other damage from ‘construction operations and placement: of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by flooring manufacturer. UBS EE RESTLFENT TILE FLOORING+PERSDNNEL DEPARTMENT THIRG FLOOR GERS, BUEFLDING $T THOMAS Usyt SECTION 09651 ~ RESILIENT TILE FLOORING _ DEPARTMENT OF PERSONNEL — GERS BUILDING THIRD FLOOR Sf. Thomas U.S. Virgin Islands l. Apply protective floor polish to floor surfaces that are free from soil; visible. adhesive, and surface-biemishes, if recommended in writing. by: manufacturer. a. Use:commercidlly available. product ‘acceptable to flooring manufacturer. Coordindte selection of floor polish with Owner's maintenance service. 2. Cover products installed on floor-surfaces with undyed, untreated building ‘paper until inspection for Substantial Completion. 3. Do notmove heavy dnd sharp objects. directly over floor surfaces. Place plywood.or hardboard panels over flooring and under objects while they are being moved. Slide. or-roll objects ‘over panels without moving panels. C3: Clean floorsurfaces not more than 4-days before dates scheduled for inspections. intended to establish date of Substantial Completion i in each orea.of Project. Clean products according to manufacturer's written recommendations. 1. Before cleaning, strip protective fioor polish that was dppiied after completing installation only if required-to restore polish finish and If recommended. by flooring. manufacturer. dD. Afier-cleaning, reapply polish to floor surfaces to.restore protective floor finish acéording to flooring manufacturer's written recommendations. Coardinate-with Owner's maintenance: program. END OF SECTION Pave Sof'S” USGSEYRESLLTENT TELE FLOORING!/PERSONNEL BDESARTIMENT THIRD ELOOR GERS BUILDENG ST FHOMAS ESV