VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

Lindbergh Bay , St. Thomas Lime Out 2 LLC Floating Restaurant and Support Moorings

Collection
Hearing Records
Sub-shelf
Comm of The Whole
Kind
Hearing Record
Entity
Legislature of the Virgin Islands
Type
Supplemental Submissions
Topics
Disaster Recovery
Pages
0
Text
Native Text

## Slide 1 Lindbergh Bay , St. Thomas Lime Out 2 LLC Floating Restaurant and Support Moorings Committee of the Whole September 17th, 2025 Permit Number: CZT –08-21(W) Applicant: Lime Out 2 LLC ## Slide 2 Project Overview Goal of project: To install moorings to tie up floating restaurant (Taco Bar) and support mooring for vessels visiting the restaurant. Lime Out. Lime Out 1 operates in Coral Bay St John Grey Water and Black Water Tanks- pumpout at 50%. Active service contract proof No Swim up , Kayak or Paddle board. Hurricane and Emergency Plan. Decibel Level conditions Daytime operations Monitoring of benthos and marine life for 3 years after operations commence. ## Slide 3 Google Earth Image of Lindbergh Bay [notes] Left: Image of the overview of the entire proposed cable network from Trans America Fiber, U.S. Right: Zoom in to the proposed branches in Puerto Rico and St. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://legvi.org/committeemeetings/Comm%20of%20The%20Whole/2025-09-17/36-0185/Supplemental%20Submissions/LIME%20OUT%202%20LLC%20PRESENTATION.pptx

SHA-256 b556feff97617c06db460581c017a4f9bea582b3a7014b079ae07f1b88d70376

Re-using this document

A proceeding of the Legislature of the Virgin Islands, open to the public under 3 V.I.C. § 881, which reaches any committee of any branch of government and permits the news media to publish what it records.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-b556feff9761

Document text

## Slide 1 Lindbergh Bay , St. Thomas Lime Out 2 LLC Floating Restaurant and Support Moorings Committee of the Whole September 17th, 2025 Permit Number: CZT –08-21(W)   Applicant: Lime Out 2 LLC ## Slide 2 Project Overview Goal of project: To install moorings to tie up floating restaurant (Taco Bar) and support mooring for vessels visiting the restaurant. Lime Out. Lime Out 1 operates in Coral Bay St John  Grey Water and Black Water Tanks- pumpout at 50%. Active service contract proof No Swim up , Kayak or Paddle board. Hurricane and Emergency Plan.  Decibel Level conditions Daytime operations Monitoring of benthos and marine life for 3 years after operations commence. ## Slide 3 Google Earth Image of Lindbergh Bay [notes] Left: Image of the overview of the entire proposed cable network from Trans America Fiber, U.S. Right: Zoom in to the proposed branches in Puerto Rico and St. Croix, image from Telegraphy Transport Networks Research Service and the online submarine cable map ## Slide 4 Approximate Location of Lime Out 2 ## Slide 5 Simplified Image of Helix Anchor with floating lines ## Slide 6 Lime Out Locations [notes] Top Left: Full view image of St. Croix showing northern location of the site in reference to the island (Google Maps Image using Map Geo) Bottom Left: North side of the island showing with the site highlighted (Google Maps image using MapGeo) Right: Static hi-res imagery of the site from MapGeo. Location is Parcel 4A, Butler Bay, STX. Building is currently owned by AT&T ## Slide 7 Image of Lime Out 1- photograph courtesy of Limeoutvi.com [notes] -Squiggly Lines: Existing submarine cables in the area -Solid red line perpendicular to St. Croix is the proposed cable installation. -Numbers are depths in Fathoms Image taken directly from the environmental assessment report (pg 12)