amendment three 3 ifb041dpwc20 c
August 31, 2020 AMENDMENT THREE (3) IFB041DPWC20 (C)– Mount Welcome Road Pavement Reconstruction from East End Road to VIPA Entrance, St. Croix, USVI INSERT: Pre-Bid Meeting Calling Conference Link. Join Microsoft Teams Meeting All other terms and conditions remain the same. A copy of this amendment must be returned with your bid.
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpp.vi.gov/wp-content/uploads/2020/07/amendment_three_3_ifb041dpwc20_c.pdf
SHA-256 b76ea6392e833f3377f1ab4a6bf7245ea996fceabf5a4f1cb5cdb629ade46d56
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-b76ea6392e83
Document text
August 31, 2020 AMENDMENT THREE (3) IFB041DPWC20 (C)– Mount Welcome Road Pavement Reconstruction from East End Road to VIPA Entrance, St. Croix, USVI INSERT: Pre-Bid Meeting Calling Conference Link. Join Microsoft Teams Meeting All other terms and conditions remain the same. A copy of this amendment must be returned with your bid.