APPENDIX B. 2026 Summer Project (1
St. Thomas 2026 Projected Summer Projects STT Uller Muller Library Roof Repair 100,875.00 $ Utilized Eng. Est. from Dober school STT Julius Sprauve Modular Floor Renovation 156,818.00 $ Estimating a Total of 10 Modular to be repaired, may be more. Cost approximately 15,681.80 to repair flooring in each modular. STT Lockhart Modular Remediation/renovation 734,318.40 $ Estimating a Total of 8 Modular to be repaired, approx- $734,318.40. Included is repair cost for flooring in each modular approximately 15,681.80 STT Bowsky Modular Floor Renovation 47,045.40 $ Estimating a Total of 3 Modular to be repaired, may be more. Cost approximately 15,681.80 to repair flooring in each modular. STT BCB Deep Cleaning 14,775.00 $ 14,775.00 per month for deep cleaning until EVR system in installed and Envelope is sealed to mitigate CO2 concentration and any trace of off gasing. Normal deep cleaning contract will take precedence over this agreement. Total 1,053,831.80 $ St. Croix 2026 Projected Summer Projects STX Pearl B. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
SHA-256 bc2ba0900eb857feb51e9c69e07229009de6873823512f06b960c5cdfe8d757f
Re-using this document
A proceeding of the Legislature of the Virgin Islands, open to the public under 3 V.I.C. § 881, which reaches any committee of any branch of government and permits the news media to publish what it records.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-bc2ba0900eb8
Document text
St. Thomas 2026 Projected Summer Projects STT Uller Muller Library Roof Repair 100,875.00 $ Utilized Eng. Est. from Dober school STT Julius Sprauve Modular Floor Renovation 156,818.00 $ Estimating a Total of 10 Modular to be repaired, may be more. Cost approximately 15,681.80 to repair flooring in each modular. STT Lockhart Modular Remediation/renovation 734,318.40 $ Estimating a Total of 8 Modular to be repaired, approx- $734,318.40. Included is repair cost for flooring in each modular approximately 15,681.80 STT Bowsky Modular Floor Renovation 47,045.40 $ Estimating a Total of 3 Modular to be repaired, may be more. Cost approximately 15,681.80 to repair flooring in each modular. STT BCB Deep Cleaning 14,775.00 $ 14,775.00 per month for deep cleaning until EVR system in installed and Envelope is sealed to mitigate CO2 concentration and any trace of off gasing. Normal deep cleaning contract will take precedence over this agreement. Total 1,053,831.80 $ St. Croix 2026 Projected Summer Projects STX Pearl B. Larsen Bathroom Refurbishing 68,750.00 $ STX Alfredo Andrews Bathroom Refurbishing 66,205.00 $ STX Lew Muckle Bathroom Refurbishing 72,105.00 $ STX Claud O' Markoe Cafeteria 62,420.00 $ Stage repairs, replace windows, window screens, paint interior, ceiling tiles etc. STX Various Schools Deep Cleaning & Sanitation Services 180,400.00 $ Summer cleaning before start of school year STX Adult Education Roof Leaks 260,850.00 $ Deteriorated and structural damages. STX Juanita Gardine Auditorium Ceiling Fans 18,087.00 $ Remove and replace industrial ceiling fans and replace with classroom safety design ceiling fans. STX Jaunita Gardine Walkway demo project 28,285.00 $ Concrete is deteriorated beyond repair STX Ricardo Richards Roof Leaks 120,200.00 $ Deteriorated and structural damages. STX Juanita Gardine Existing Playground Equipment Removal 18,025.00 $ Safety Hazard and Structural deterioration STX Eulalie Rivera Roof Leaks 119,893.00 $ Deteriorated and structural damages. STX Central High Music Room 31,800.00 $ Repairs/refurbish Total 1,047,020.00 $ Territory Wide Total 2,100,851.80 $