VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

10 Chatham Center South Drive, Suite 500

Collection
Research & Technical Reports
Sub-shelf
dpnr.vi.gov
Kind
Research Report
Island
St. Thomas
Date
2017-09
Topics
Disaster Recovery
Pages
1
Text
Native Text
Identifiers
P.L. 80-858

10 Chatham Center South Drive, Suite 500 Savannah, Georgia 31405 United States ghd.com The Power of Commitment GHD USACE ref: W912HN23F2035 GHD ref: 12613209 October 21, 2024 Jean-Pierre L. Oriol, Commissioner Department of Planning and Natural Resources Charles W. Turnbull Regional Library 4607 TuTu Park Mall St. Thomas, VI 00802 GHD Request for Coastal Consistency for the Savan Gut Phase II Project Dear Commissioner Oriol GHD on the behalf of the U. S. Army Corps of Engineers respectfully request a Decision of Coastal Consistency for the Savan Gut Phase II Project in St. Thomas, VI. The purpose of the project is to reduce flood damages to the Jane E. Tuitt Elementary School and the Central Business District in downtown Charlotte Amalie during a one-hour SPF (Standard Project Flood) published in Engineer Manual (EM) 1110-2-1411. Heavy rainfall in the upland catchment basin of Savan Gut causes rocks and other debris to be washed down the channel toward the sea. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpnr.vi.gov/wp-content/uploads/2025/07/Cover-Letter-Savan-Gut-Permit_Final.pdf

SHA-256 e1c70c5fa57e1514a8ae3977a21c7c861ee536563dbf1c2ad778eada70a4b23e

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-e1c70c5fa57e

Document text

10 Chatham Center South Drive, Suite 500 Savannah, Georgia 31405 United States ghd.com The Power of Commitment GHD USACE ref: W912HN23F2035 GHD ref: 12613209 October 21, 2024 Jean-Pierre L. Oriol, Commissioner Department of Planning and Natural Resources Charles W. Turnbull Regional Library 4607 TuTu Park Mall St. Thomas, VI 00802 GHD Request for Coastal Consistency for the Savan Gut Phase II Project Dear Commissioner Oriol GHD on the behalf of the U. S. Army Corps of Engineers respectfully request a Decision of Coastal Consistency for the Savan Gut Phase II Project in St. Thomas, VI. The purpose of the project is to reduce flood damages to the Jane E. Tuitt Elementary School and the Central Business District in downtown Charlotte Amalie during a one-hour SPF (Standard Project Flood) published in Engineer Manual (EM) 1110-2-1411. Heavy rainfall in the upland catchment basin of Savan Gut causes rocks and other debris to be washed down the channel toward the sea. Two constrictions reduce flows so that the flood waters overflow the channel banks and flood the school as well as the business district. The Savan section of Charlotte Amalie has extremely high runoff rates due to the steep slopes in the upper basin. Flash floods from intense thunderstorms are a common event affecting this area and can occur anytime during the year. Effects from Hurricane Maria, which hit the island in September 2017, prompted the Corps to include the project for consideration for funding. The initial project, authorized under the Continuing Authorities Program (CAP), Section 205 of the Flood Control Act of 1948 (Public Law 80-858), as amended (33 U.S.C. § 701s), was divided into two phases for preparation of plans, specifications, and construction with the U.S. Virgin Islands Department of Public Works (USVI DPW) as the Non-Federal Sponsor (NFS). Construction was completed on Phase I in April 1989 and Phase II was advertised in 1999. However, the bids received exceeded the government estimate and costs exceeding the Corps’ statutory limit; therefore, Phase II of the project was not awarded for construction. Since Phase II has not been constructed, significant residual flooding impacts occur in Charlotte Amalie. The Final Savan Gut, CAP Conversion Feasibility Report was completed in 2020, which verifies the full project and Phase II as a standalone project (the unconstructed features) are both economically justified, environmentally acceptable, and feasible from an engineering standpoint and that no additional reformulation is needed. The information provided herein is furnished in support of the Department of Planning and Natural Resources (DPNR) Coastal Zone Management Federal Consistency Environmental Assessment for a unified and comprehensive design plan to mitigate the flooding along Savan Gut. The proposed application seeks to obtain authorization for Phase II of the project plan, further detailed in the supplemental information. Thomas Gillespie Project Manager +1 912 235-6725 thomas.gillespie@ghd.com