USVI Underground Storage Tank Public Record
USVI Underground Storage Tank Public Record Public Record Posted Date September 30, 2018 Total UST Facilities 45 Total USTs 173 Number of UST Facilities Inspected 26 Inspection Period Dates October 1, 2017-September 30, 2018 Percent Compliance 75% Compliance Measures and Reported UST The compliance rate is based on the combined performance measure for significant operational compliance. Release Reporting Period Dates October 1, 2017-September 30, 2018 Number of Confirmed Releases 0 Number and Percent of Releases By Source N/A Number and Percent of Causes By Source N/A Number, Sources, and Causes of UST Releases and Data on Equipment Failures N/A The compliance rate is be based on the combined performance measure (release detection and release prevention compliance) for significant operational compliance with state or federal underground storage tank requirements. Please contact Kerten Peters at (340)7731082 for any additional information.
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpnr.vi.gov/wp-content/uploads/2022/09/Underground-Storage-Tank-Public-Record-EOY-2018.pdf
SHA-256 e24edf6f73ac2c65c90e786e89d41ffd12f28c2f87b00c4cc4a58b0ea5b276a2
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-e24edf6f73ac
Document text
USVI Underground Storage Tank Public Record Public Record Posted Date September 30, 2018 Total UST Facilities 45 Total USTs 173 Number of UST Facilities Inspected 26 Inspection Period Dates October 1, 2017-September 30, 2018 Percent Compliance 75% Compliance Measures and Reported UST The compliance rate is based on the combined performance measure for significant operational compliance. Release Reporting Period Dates October 1, 2017-September 30, 2018 Number of Confirmed Releases 0 Number and Percent of Releases By Source N/A Number and Percent of Causes By Source N/A Number, Sources, and Causes of UST Releases and Data on Equipment Failures N/A The compliance rate is be based on the combined performance measure (release detection and release prevention compliance) for significant operational compliance with state or federal underground storage tank requirements. Please contact Kerten Peters at (340)7731082 for any additional information.