VI Update

USVI Public Records

A VI Update Project · Brian LoudenThe territory’s public record — kept public.

2022 12 20 Latitude18 COMBINED SET

Collection
Research & Technical Reports
Sub-shelf
dpnr.vi.gov
Kind
Research Report
Date
2022-12-21
Pages
53
Text
Native Text

Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A100 05.03.2021 2021002 Checker COVER LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. …

Download the original document · Plain text (TXT) · Browse the archive · How this archive works

Original source: https://dpnr.vi.gov/wp-content/uploads/2023/08/2022-12-20_Latitude18_COMBINED-SET.pdf

SHA-256 e382ead65dd53932d737a73d4bea14d8152dd019bd67be85c5e0f69470a3a126

Re-using this document

A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.

Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.

Archive identifier LF-e382ead65dd5

Document text

Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A100 05.03.2021 2021002 Checker COVER LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC LATITUDE 18 MARINA REDEVELOPMENT DRAWING INDEX PROJECT DIRECTORY OWNER: JACK ROCK B-A C LLC Corporation Trust Center 1209 Orange Street Wilmington, Delaware, 19801 ARCHITECT: JAREDIAN DESIGN GROUP NO.33 DRONINGEN'S GADE ST. THOMAS, USVI, 00802 Contact: John Woods TEL: 340-777-1600 Email: john.jwp.woods@gmail.com DRAWING INDEX SHEET NO. SHEET NAME GENERAL A100 COVER A101 CZM INFORMATION CIVIL C-001 NOTES SHEET C-010 SURVEY SHEET C-091-095 EROSION CONTROL DEMOLITION PLAN C-100 OVERALL SITE PLAN C-101-105 SITE PLAN C-201-204 GRADING & DRAINAGE PLAN C-301-304 UTILITY PLAN C-400-410 DETAILS ARCHITECTURAL A111 SITE PLAN B-A101 WAREHOUSE - FLOOR PLANS B-A121 WAREHOUSE - ELEVATIONS B-A103 WAREHOUSE - ROOF PLAN A112 LANSCAPE & IRRIGATION PLAN B-A102 WAREHOUSE - FOUNDATION PLANS A-A101 MARINA BUILDING - FLOOR PLAN - CISTERN LEVEL A-A111 MARINA BUILDING - FLOOR PLAN - FIRST FLOOR A-A121 MARINA BUILDING - FLOOR PLAN - SECOND FLOOR A-A112 MARINA BUILDING - FOUNDATION PLAN - FIRST FLOOR A-A201 MARINA BUILDING - ELEVATIONS A-A202 MARINA BUILDING - SECTIONS A-A122 MARINA BUILDING - ROOF PLAN A-A231 MARINA BUILDING - AXONOMETRIC VIEWS B-A231 WAREHOUSE BUILDING - AXONOMETRIC VIEWS A-A232 OVERALL SITE AXON A-A233 VIEW FROM APARTMENT NEXT DOOR A110 VICINITY PLAN STRUCTURAL S1 SITE PLAN S2 BULKHEAD SECTIONS MARINA EXHIBITS M101 MARINA & MOORING EXHIBITS M102 MARINA & MOORING EXHIBITS M103 MARINA & MOORING EXHIBITS M104 MARINA & MOORING EXHIBITS ZONING REQUIREMENTS TABLE: W1 REQUIRED/ALLOWED PROVIDED PERMITTED DENSITY PERMITTED LOT OCCUPANCY LOT AREA USABLE OPEN SPACE PARKING 40% OF ZONING LOT AREA: 96,848 SF MAX. 18,784 SQUARE FEET OR 7.2% 10,000 SQUARE FEET MIN. 30% OF ZONONG LOT AREA: 72,636 SF MIN. 2 DWELLING UNITS MAX 0 DWELLING UNITS 84 PARKING SPACES 77,841 SF OR 32% 76 PARKING SPACES 242,122 SQUARE FEET (5.56 ACRES) LOT WIDTH FRONT YARD SIDE YARDS REAR YARD MAX. HIEGHT LIMIT THREE STORIES TWO STORIES MIN. 100 FEET MIN. 25 FEET MIN. 10 FEET MIN. 20 FEET 20+ FEET REM. CONSOLIDATED 9B-A ESTATE NAZARETH - ST. THOMAS, U.S. VIRGIN ISLANDS CZM REVISION | SUBMISSION DATE: DECEMBER 21, 2022 APPLICANT: JACK ROCK B-A C LLC CONSULTING ARCHITECT: DESIGN DISTRICT, PLLC 2110 Company Street Christiansted, VI, 00820 Contact: Clarence Browne Phone: 340-227-6265 Email: clarence@designdistrictvi.com CIVIL ENGINEER: HARRIS CIVIL ENGINEERS, LLC 1200 Hillcrest Street, Suite 200 Orlando, Florida, 32803 Contact: David Taylor, PE Phone: 407-629-4777 Email: davidt@harriscivilengineers.com CONSULTING ARCHITECT: EDGE OF ARCHITECTURE(EOA) 1929 Ponce De Leon Blvd Coral Gables, FL, 33134 Contact: Malcom Berg Phone: 305-444-0990 Email: mb@eoagroup.com LAND SURVEYOR-GEO REFERENCING: BRIAN MOSLEY & ASSOCIATES, INC. 4003 Raphune Hill, Suite 606 St. Thomas, USVI, 00802 Contact: Ryan Wisehart Phone: 340-774-5310 Email: rwisehart@visurveyors.com GEOTECHNICAL ENGINEER: MVG GEOTECHNICAL GROUP P.O. Box 2636 Vega Baja, Puerto Rico, 00694 Contact: Marcus Garcia Phone:787-354-5646 Email: mgarcia@mgvgeo.com FUEL CONSULTANT: PETROLEUM MARINE CONSTRUCTION 120 E. Oakland Park Blvd, Suite 105 Ft. Lauderdale, FL, 33334 Contact: Paul Doyle Phone: 954-533-1199 Email: paul@petroleummarine.com ENVIRONMENTAL CONSULTANT: BIOIMPACT, INC. P.O. Box 132 Kingshill St. Croix, USVI 00851 Contact: Amy Claire Dempsey, MA Phone: 340-690-8445 Email: bioimpact@islands.vi DEVELOPMENT MANAGER: AMS HOSPITALITY 3350 Riverwood Parkway, Suite 2110 Atlanta, GA 30339 Contact: John Cooper Phone: 404-229-6417 Email: jcooper@ams-hospitality.com MARINE/COASTAL ENGINEER: APPLIED TECHNOLOGY + MANAGEMENT 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com BATHYMETRIC SURVEYOR: THEGREENPIECE 5001 Chandlerss Wharf Christiansted, St. Croix, 00802 Contact: Jeffrey Bateman, PE, PLS Phone:340-778-7474 Email: jeff@thegreenpiece.ud STRUCTURAL ENGINEER: PFPE 9-1 Bellevue, PO Box 600122 St. Thomas, USVI, 00801 Contact: Paul Ferreras, PE Phone: 340-714-5435 Email: paul@pfpe.pro VICINITY MAP LOCATION MAP NOT TO SCALE NOT TO SCALE LAND SURVEYOR + CONSULTANTS: MARVIN BERNING AND ASSOCIATES Office: 18-8 Estate Smith Bay Mailing: 6501 Red Hook Plaza, Suite 201 Contact: Harry Gauriloff, RLS Phone: 340-775-6557 Email: hgvisurvey@gmail.com ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 30+ FEET 200+ FEET N/A (SEE PLANS) 1 COVER 2 Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A101 05.03.2021 2021002 Checker CZM INFORMATION LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC CZM INFORMATION 1.00 NAME AND ADDRESS OF APPLICANT JACK ROCK B-A C LLC Corporation Trust Center 1209 Orange Street Wilmington, Delaware, 19801 2.00 LOCATION OF PRODUCT The Latitude 18 Marina is located on Vessup Bay in Red Hook, on the eastern end the island of St. Thomas. Parcel 3 Estate Nazareth is located on the southern shore of Vessup Bay. The geographic coordinates of the proposed project are 18.324817°N and 64.837134°W. The proposed mooring field is located at 18.325657°N 64.845457°W. 3.00 ABSTRACT Jack Rock B-AC LLC purchased parcels 9C and 9B-Consolidated, Estate Nazareth with the intention of developing a World Class Marina with an upland mixed use commercial development. Consolidated Parcel 9B-A comprises a total of 5.56 acres. The entire area is zoned W-1-Waterfront Pleasure. The Proposed Development is permitted by the Virgin Islands Code as a matter of right. The project site contains a peninsula that forms the southern entrance to Red Hook Bay. That peninsula is a rocky abutment that extends to the National Park Service property on the East side and abuts the Vessup Beach area to the south. The project area was the site of the Latitude 18 Marina. This Marina has been through significant damages as a result of the Hurricanes over the past 25 years, specifically Hurricane Marilyn in 1995 and Hurricanes Irma and Maria in 2017. The original Marina was never fully restored after Hurricane Marilyn in 1995. The viability of the property as a Marina has continually diminished over time, finally closing from damages as a result of the 2017 Hurricanes. The Development Plan intends to take advantage of this unique promontory at the entrance to Red Hook Bay. The Development Plan is supported by environmental studies that is the basis for the location and development of upland, shoreline and overwater structures. The inclusion of a wave attenuator in the Marina Development Plan is intended to create calmer water under operational conditions. The Marina dock layout encompasses the area occupied by the previous Marina. The upland Development Plan includes a wholistic storm water management system with area reserved for natural drainage courses and preserved vegetation to address endangered species such as the Tree Boa. A total of 32% of the lot areas are devoted to drainage areas, and landscaping. The overall Development Plan includes a Managed Mooring Field that will have approximately 14 buoys in Vessup Bay and 68 buoys in Muller Bay. Pump Out Facilities and showers will be available for the clients that lease moorings in the Mooring Field. Managed mooring fields throughout the United States are amongst the means to have proper anchorage for moored vessels and proper environment management within the Bay through the on-land Pump Out Facilities. This mooring Field will be an example of sound environmental practices in the Bay. 4.00 STATEMENT OF OBJECTIVES SOUGHT BY THE PROPOSED PROJECT The Marine Industry in the U.S. Virgin Islands has diminished over the past 30 years due to the emergence of other markets such as the British Virgin Islands and U.S. Coast Guard Requirements. The objective sought through this Application is to provide a World Class Marina with a complement of upland Food and Beverage Establishments, Retail and Support Facilities. This project will become a cornerstone in the Government of the U.S. Virgin Islands Marine Task Force Development. A further objective sought by this project is responsible Environmental Development through the preservation of Habitat for endangered species on the up-land development and the Managed Mooring Field that is proposed as a part of it. Managed mooring fields will include U.S. Coast Guard approved mooring balls, helix type anchors with floated lines, and requirements for sewage pump out stations that are a part of the Upland Development. These measures will have a significant improvement in the water quality in the Bay. 5.00 DESCRIPTION OF PROJECT Upland The upland structures will include design motifs that are particularly Tropical and Historical Danish Architecture in nature. The building structures will have concrete foundations, steel super structure, and roofing. Structures will be enclosed by masonry exterior walls. All fenestrations will be impact resistant assemblies. There are two primary upland structures. They are: • Restaurant & Marina Services Building • Warehouse Building & Boat Storage Racks Restaurant & Marina Services Building The Restaurant & Marina Services Building is the cornerstone of the upland development. it is located on the North East Promontory of the site. This location forms the southern entry point to Red Hook Bay. The overall structure will be one and a half stories in height with a total square footage of approximately 10,000 SF. The vehicular entry will approach from the south east with a turnaround covered by Porte-Cochere. Visitors will proceed through the courtyard eventually to an external passageway to the promenade. Marina users will be able to proceed by foot to the Marina Waiting Pavilion to the west and from there to the docks. The first floor will contain Support Spaces, Kitchen, Restaurant & Retail. The northern and eastern sides of the Multi-Use Structure are surrounded by a promenade, lounge area and other areas that transition from the first level of the building down to the dock-level. The second floor of the structure will contain a sunset viewing deck with support space. The envelope on the second floor shall step back from the lower-level envelope. The west side of the building will provide access to support facilities to mooring field users, including restrooms and showers. Warehouse Building The Warehouse Building will be 10,000 SF in size. It will be a single-story structure that will contain storge of materials and supplies related to the operation of the Marina. SITE LAYOUT The concept behind the layout of this site is to take into consideration the environmental resources that constrict the location of buildings within the area. Entry to the project site will be at the north western corner of the property where the existing Latitude 18 access was located. From this entry point the access road splits to allow for visitor circulation to bend toward the south then eastward towards the Marina Services Building. On the northern side of the property there will be a service road that will only be utilized by Marina Operations. It will be located at that boundary and then toward the drop well of the marina portion of the property near the north western part of the promontory. The area between these two access roads will contain the Warehouse, onsite utility infrastructure, construction staging area, hurricane storage and daily boating trailers. The proposed parking areas will include public parking for visitors to use the retail establishments and beach area. The proposed Latitude 18 project will be comprised of a marina boat launch, marina building, and a restaurant. The supporting structures include a wastewater treatment plant, a fuel yard, potable water storage, and an electrical yard. Marina The proposed marine project is composed of docks and utilities, shoreline restoration and a managed mooring field. The marina includes pile-supported fixed pier docks for the berthing of yachts. The marina will have 17 dedicated slips and 638 linear ft of alongside dockage, with a total capacity of 2,128 linear ft (approximately 26 vessels). The marina will provide permanent and transient berthing for a mix of vessels ranging from 60 to 200ft, with additional alongside berthing for smaller vessels. The marina project lies in general location of a marina that was destroyed by previous storm events. The scope of work includes the removal of existing remaining structures, timber piles, sunken debris, and sunken vessels from the marina footprint. The marina will have fuel service and fuel will provided by dispensers on the fuel dock, as well as in-slip fueling on the main docks slips. The marina includes wave attenuation devices to provide comfort during operational conditions. A wave screen attached to the main fixed pier is proposed in areas that do not impede circulation flows. A floating wave attenuator is proposed to protect the marina slips facing Muller Bay and to reduce the need for wave screens. Due to the elevation of the deck of the fixed piers, the docks which service smaller vessels, such as the fuel dock and smaller draft areas, will be provided with dock skirts to prevent small boats from going under the dock. A new bulkhead will be built in front of the dilapidated existing bulkhead and rectifying the disturbed shoreline comprised of masonry irregular walls and a damaged pier structure, offering a stable water edge for access to the marina docks and marina operations. The seabed in the area adjacent to the new bulkhead will be excavated to achieve – 6.5ft MSL elevation, in order to provide safe draft for the intended operation. Mooring Field The mooring field includes 68 mooring buoys in the Muller Bay Mooring Field, over 96 LF of berthing on two floating docks for dinghies, and upland support facilities such as showers, restrooms, and solid waste collection bins. Vessels in the mooring field will have access to the pump out at the fuel dock and will be prohibited by their mooring lease contract to discharge sewage or other pollutants. The mooring field area will be identified with new markers and additional navigation aids will be installed to better identify the navigation channels. The Port Authority was consulted to validate the navigation channel and location of navigation aids. Proposed marina will maintain a high standard of operation, compatible with the vessel size and clientele expected. The marina operator will seek a Blue Flag, Clean Marina, or similar certification. As part of its normal operation, the marina expects to: • Establish and maintain a management plan that includes environmental management systems; • Create and maintain an environmental policy that supports the implementation and updates of the environmental management plan; • Display at the marina the code of conduct that reflects appropriate laws governing the use of the marina and surrounding areas; • Display information relating to local eco-systems and the local environment; • Provide marina and mooring lease agreements that include information about regulations, laws and permit conditions governing the use of the marina and its environmental management plan; • Maintain the operation and promote the use of a sewage pump-out; • Provide marina and mooring lease agreements that include the prohibition of discharge of sewage, bilge, oil or solid waste to the bay, as proper disposal procedures for fluid and solid waste will be available through the marina; • Provide adequate and properly identified, segregated containers for the storage of waste oil and general solid waste; • Provide adequate, clean, and well sign-posted sanitary facilities, including washing facilities are provided for the marina visitors and employees. • Provide adequate and well signposted lifesaving, first-aid equipment, and fire-fighting equipment • Prepare emergency plans in case of pollution, fire or other accidents as part of an Approved Spill Prevention Control and Countermeasure Plan. Post safety precautions and information at the marina. • Provide electricity and water in all marina slips and in-slip fueling in selected marina berths; • Provide accommodations for disabled people are in place. • A map indicating the location of the different facilities is posted at the marina 5.01 CONTINUED a. DISCUSS PURPOSE OF PROJECT - Jack Rock A-BC, LLC. intends to construct a World-Class Marina consisting of wet slips with a compliment of upland structures that will include Food and Beverage establishments, Retail, Marina Showers, and other support Structures. The Development Plan also includes the construction of a managed mooring field of approximately 14 buoys in Vessup Bay and 72 buoys in Muller Bay. The purpose of the Latitude 18 Marina is to create a boat launch area, mooring field, and docks for Vessup Bay. b. DISCUSS THE PRESENCE AND LOCATION OF CRITICAL AREAS AND POSSIBLE TROUBLE SPOTS - The subject parcels are within the Vessup Bay/ East End Red Hook Area of Particular Concern (APC). The Vessup Bay/Red Hook APC is located on the eastern end of St. Thomas and includes Nazareth, Muller, Vessup, Red Hook, Great Bay, Cowpet Bay, Cabrita, Beck and Water Point, Great St. James, Little St, James, and Dog Island. c. DISCUSS PROPOSED METHOD OF LAND CLEARING - The project site is known endangered VI Tree Boa habitat therefore the Tree Boa clearing protocols will be followed and the site will first be hand cleared and rock and rubble piles will be taken apart by hand to allow any tree boas in the area to leave to more forested areas. After the hand clearing, most of the site will be machine cleared and excavated at the beginning stages of construction. Existing trees will be removed by and disposed of as necessary according to the Tree Removal Plan. Trees that are designated to remain will be protected during construction. Furthermore, only the land within the limits of construction will be cleared. The clearing activities will be scheduled so that the existing soil is exposed to erosion for the shortest period that is reasonably possible. Immediately following the clearing, erosion and sediment control measures will be put into place as described in the following sections d. DISCUSS PROVISIONS TO PRESERVE TOPSOIL AND LIMIT SITE DISTURBANCE - Immediately following site clearing, erosion and sediment control measures will be installed. Furthermore, all topsoil located during site clearing will be immediately excavated, stockpiled and protected from exposure to wind and water through the use of a geotextile. The topsoil will be used as necessary in the landscape areas. e. The dock and mooring locations have been located to minimize impact on the marine environment by avoiding all ESA listed corals, non-ESA corals, seagrass beds and minimizing hard bottom impacts. Turbidity control and water quality monitoring will be implemented as well as sea turtle monitoring to minimize acoustic impacts. Areas will be cleared by hand to minimize impact to the VI Tree Boa f. DISCUSS EROSION AND SEDIMENTATION CONTROL DEVICES TO BE IMPLEMENTED - Turbidity barriers will be installed before any in-water work and maintained until interior water quality is within acceptable levels. Double turbidity barriers will be required if pile socketing is required. Silt fencing will be installed before any earth moving is conducted near the landing slab. g. SHOW SCHEDULE FOR CONSTRUCTION ACTIVITIES AND IMPLEMENTATION OF EROSION/SEDIMENT CONTROL MEASURES • Obtain CZM Permit • Secure Site • Hand Clear Site Following Tree Boa Protocol • Install Silt Fences • Cleanup of Site • Demolition • Construction h. DISCUSS THE MAINTENANCE OF EROSION AND SEDIMENT CONTROL MEASURES - Silt fences to be checked and maintained on a regular schedule established by contractor. Any loose links or tears to be repaired. i. DISCUSS METHOD OF STORM WATER MANAGEMENT - Proposed stormwater control facilities consist of a primary stormwater system and a secondary stormwater system. The primary stormwater system includes a dry retention pond with a drainage control structure. The pond provides water quality treatment and attenuation prior to discharging into the nearby bay. The secondary system consists of a series of inlets and area/hardscape drains, connected by a network of drainage pipes (ranging in size and material from 4” PVC to 24” RCP) that outfall into the retention pond. j. DISCUSS MAINTENANCE SCHEDULE OF STORM WATER FACILITIES - Require daily observation and, if necessary, will be repaired immediately. Likewise, after large storm events, the erosion control measures will be checked and adjusted or repaired if they are not working as planned. The contractor will take measures such as reapplying the erosion control polymers, fixing, or replacing the erosion control blankets and fixing or replacing the silt fences and turbidity barriers if they fail. Devices for entrapment of silt will be cleaned as required to maintain functionality. In the event that construction is delayed or completed in an area, the contractor will revegetate the bare soil with seed and mulch or hydroseed to stabilize the soil. k. DISCSUS METHODS OF SEWAGE DISPOSAL - The wastewater generated on-site will exit the buildings via 6” sanitary laterals and flow into a gravity sewer/manhole collection system. This gravity system will discharge to a sanitary lift station located within a screened back of house area. The lift station will pump into a force main which will discharge into the headworks of the proposed Wastewater Treatment Plant (WWTP). ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 · · · · · SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whethe indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 NOTES SHEET C-001 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 North SURVEY SHEET C-010 KEY MAP C-010 MATCHLINE C-011 C-011 North SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 SURVEY SHEET C-011 KEY MAP C-011 MATCHLINE C-010 C-010 North SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 EROSION CONTROL & DEMOLITION PLAN C-091 KEY MAP C-091 MATCHLINE C-092 C-092 C-093 MATCHLINE POND INSET MATCHLINE POND INSET North SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 EROSION CONTROL & DEMOLITION PLAN C-092 KEY MAP C-091 MATCHLINE C-093 C-092 C-093 MATCHLINE C-091 North SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 EROSION CONTROL & DEMOLITION PLAN C-093 KEY MAP C-091 C-092 C-093 MATCHLINE C-092 North SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 EROSION CONTROL & DEMOLITION PLAN C-094 KEY MAP C-091 C-092 C-093 MATCHLINE C-092 C-094 C-095 North SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 EROSION CONTROL & DEMOLITION PLAN C-095 KEY MAP C-091 C-092 C-093 MATCHLINE C-092 C-095 C-094 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whethe indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 North OVERALL SITE PLAN C-100 North SITE PLAN C-101 KEY MAP SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 C-101 MATCHLINE C-102 C-102 C-103 MATCHLINE POND INSET MATCHLINE POND INSET North SITE PLAN C-102 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 KEY MAP C-101 MATCHLINE C-103 C-102 C-103 MATCHLINE C-101 North SITE PLAN C-103 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 KEY MAP C-101 C-102 C-103 MATCHLINE C-102 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 North SITE GRADING & DRAINAGE PLAN C-201 KEY MAP C-201 MATCHLINE C-202 C-202 C-203 MATCHLINE POND INSET MATCHLINE POND INSET SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 North SITE GRADING & DRAINAGE PLAN C-202 KEY MAP C-201 MATCHLINE C-203 C-202 C-203 MATCHLINE C-201 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 North SITE GRADING & DRAINAGE PLAN C-203 KEY MAP C-201 C-202 C-203 MATCHLINE C-202 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 North UTILITY PLAN C-301 KEY MAP C-301 MATCHLINE C-302 C-302 C-303 MATCHLINE POND INSET MATCHLINE POND INSET SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 North UTILITY PLAN C-302 KEY MAP C-301 MATCHLINE C-303 C-302 C-303 MATCHLINE C-301 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 North UTILITY PLAN C-303 KEY MAP C-301 C-302 C-303 MATCHLINE C-302 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 DETAILS C-400 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 DETAILS C-401 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 DETAILS C-402 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 DETAILS C-403 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 DETAILS C-404 TYPICAL LOCKING BOLT SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 DETAILS C-405 Ó1996 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 DETAILS C-406 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 DETAILS C-407 SCOPE DOCUMENTS The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible fo complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, wheth indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. Project Manager Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website:www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net 12/15/2022 07280000 D.W.T. LATITUDE 18 MARINA 9B-A ESTATE NAZARETH ST. THOMAS, USVI ♦ Vessup Operations, LLC ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP CZM APPLICATION CZM APPLICATION REVISION 2/10/2021 5/5/2021 1/15/2022 2 3 CZM APPLICATION REVISION 12/15/2022 4 DETAILS C-408 BLD 1 BLD 2 MARINA BOAT DROPWELL BOAT YARD BOH YARD WAVE ATTENUATOR BULKHEAD & DOCKS MULLER BAY VESSUP BAY BEACH MARINA DROP-OFF BUILDING 3 DRY POND LIMITS OF CIVIL CONSTRUCTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 C H A A A B D G H H I I J K N N N O D C K K L P Q Q Q C L L L M O R O O N N N N S S S S S S S L RAMP RAMP RAMP N F F F F 8 8 8 8 2 7 7 7 8 10 5 6 Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A110 11/27/22 2021002 Checker VICINITY PLAN LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC ISSUANCES No. Drawing Issue Description Date 4 CZM APPLICATION REVISION 12/15/2022 SCALE: 1" = 80'-0" A110 2 VICINITY PLAN DN DN 67' CZM SETBACK 42' CZM SETBACK 70' 61' 168' BUILDING 2 BUILDING 1 NATURAL ABUTMENT NATURAL ABUTMENT PORTE COCHERE BUILDING 3 148' 68' 16' 22' 22' 22' 4' 12' 22' 4' 4' 22' 4' 5' 30' 11' 56' 4' 56' R35 R35 R25 R47 R15 R3 R3 R15 R4.5 R4.5 R4.5 R4.5 R4.5 R4.5 R4.5 R4.5 R3 R4.5 R4.5 R4.5 R4.5 R25 R4 R5 R15 R45 R10 R8 R30 R25 R4 5' 5' 8' R10 R15 R15 R4 R45 R4 BLD 4 R4 R15 R4 R4 R15 18' 9' 5' 18' 9' 18' 9' 5' 12' 5' R65 R15 R34 32' 29' 29' 23' 15' 8' 8 8 8 8 2 7 7 7 8 10 5 6 UNDERGROUND FUEL STORAGE (SEE CIVIL) WASTE TREATMENT (SEE CIVIL) GENERATOR (SEE CIVIL) BUILDING B WAREHOUSE BUILDING (SEE PLANS) BUILDING A RESTAURANT & MARINA SERVICES BUILDING (SEE PLANS) PROPERTY LINE PROPERTY LINE CONCRETE PAVING (SEE CIVIL) MARINA (FOR REFERENCE ONLY SEE MARINA EXHIBITS) EXISTING RIP RAP (NATURAL ABUTTMENT) PROPERTY LINE MARINA WAITING PAVILION ACCESS CONTROL GATE RETENTION/DRY POND & PRESERVATION AREA (SEE CIVIL) UNIMPROVED EASEMENT BACK-OF-HOUSE YARD (GRAVEL/PERVIOUS PAVING) ACCESS CONTROL GATE PROPERTY LINE PROPERTY LINE PROPERTY LINE BOAT STORAGE YARD (CONCRETE PAVING) BOAT STORAGE & MAINTENANCE EQUIPEMNT (REFER TO MARINA EXHIBITS) VISITOR PARKING - GRAVEL/PERVIOUS PAVING (SEE CIVIL) RETAINING WALL (SEE CIVIL) LANDSCAPE PROPERTY LINE PROPERTY LINE CONCRETE DRIVE PAVED DECK/WALK PORTE-COCHERE (COVERED DROP-OFF) EVENT LAWN (LANDSCAPE) LANDSCAPE Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A111 05.03.2021 2021002 C.B. SITE PLAN LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 1" = 50'-0" A111 1 ARCHITECTURAL SITE PLAN ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 DN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 19 20 21 22 23 24 25 26 27 28 29 CONSERVATION AREA RETENTION POND PLANTED WITH NATIVE WETLAND VEGETATION CONTINUOUS OVERLAPPING TREE CANOPY ALONG PROPERTY LINE - TREE BOA CORRIDOR (REFER TO ENVIRONMENTAL REPORT) PROPERTY LINE MARINA (FOR REFERENCE ONLY SEE MARINA EXHIBITS) LANDSCAPE BUFFER/SCREENING LANDSCAPE BUFFER/SCREENING PERVIOUS GRAVEL PAVING (SEE CIVIL) BUILDING B WAREHOUSE BUILDING BUILDING A RESTAURANT & MARINA SERVICES BUILDING (SEE PLANS) MARINA WAITING PAVILION SECURITY FENCE (SEE CIVIL) LANDSCAPE SCREENING BETWEEN BOAT OPERATIONS AND VISITOR EXPERIENCE PROPERTY LINE PROPERTY LINE EXISTING RIP RAP (NATURAL ABUTTMENT) PAVED DECK/LOWER WALK EVENT LAWN (LANDSCAPE) RETAINER GARDEN WALL LAWN/LANDSCAPE AREA MIDDLE DECK UPPER DECK W/ TURF INSERT PROPERTY LINE MIDDLE DECK LOWER DECK/WALK LANDSCAPE BUFFER/SCREENING LANDSCAPE SCREENING BETWEEN BOAT OPERATIONS AND VISITOR EXPERIENCE SYMBOL QTY. COMMON BOTANICAL FLOWERING TREES OR PLANTS CATEGORY PALMS SHADE TREES CONSERVATION AREA (PRUNED AND MAINTAINED NATURAL VEGETATION) TREE LEGEND LEGACY TREES SEA LAVENDER ARGUSIA GNAPHALODES JAMAICAN CAPER CAPARIS CYNOPHALLAPHORA WHITE FRANGIPANI PLUMERIA ALBA COCO PLUM CHRYSOBALANUS ICACO MAMPOO MAHOGANY TURP QUEEN PALMS ROYAL PALMS SEA GRAPE LIGNUM VITAE Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A112 05.03.2021 2021002 Checker LANSCAPE & IRRIGATION PLAN LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 1" = 50'-0" A112 1 LANDSCAPE & IRRIGATION PLAN 1" = 40'-0" TREE LEGEND ISSUANCES No. Drawing Issue Description Date 1 CZM PRE-APP 2/10/2021 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 2472 SF CISTERN A-25 1428 SF CISTERN A-26 3 A-A202 1 A-A202 70' - 0" 23' - 0" 36' - 9 9/16" 48' - 10 3/4" 40' - 0" 40' - 0" Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A101 05.03.2021 2021002 Checker MARINA BUILDING - FLOOR PLAN - CISTERN LEVEL LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 1/16" = 1'-0" A-A101 1 CISTERN LEVEL FOUNDATION PLAN - MARINA BUILDING ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 UP UP DN UP DN PLAN LEGEND CONDITIONED UNCONDITIONED PORTE COCHERE 3 A-A202 473 SF RETAIL #2 A-207 1691 SF RETAIL #1 A-209 53' - 11 5/16" 18' - 0" 24' - 0" 46' - 0" 141' - 11 5/16" 1035 SF KITCHEN A-210 40' - 0" 1297 SF RESTAURANT - INDOOR A-211 360 SF RETROOMS A-213 1262 SF RESTAURANT - COVERED OUTDOOR A-214 570 SF MOORING FIELD SUPPORT A-215 1 A-A202 A-A201 1 A-A201 2 A-A201 3 2 A-A202 Sim 39' - 7 25/32" 10' - 0" 32' - 1 1/2" 8' - 0" TYPICAL 18' - 0" 40' - 0" 74' - 11 7/16" Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A111 05.03.2021 2021002 Checker MARINA BUILDING - FLOOR PLAN - FIRST FLOOR LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 1/16" = 1'-0" A-A111 1 LEVEL 01 - MARINA ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 WALLS EXTEND DOWN TO CISTERN LEVEL BELOW WALLS EXTEND DOWN TO CISTERN LEVEL BELOW CONTINUOUS SPREAD FOOTINGS, TYPICAL CONTINUOUS SPREAD FOOTINGS, TYPICAL CONTINUOUS SPREAD FOOTINGS, TYPICAL CONTINUOUS SPREAD FOOTINGS, TYPICAL CONTINUOUS SPREAD FOOTINGS, TYPICAL CONTINUOUS SPREAD FOOTINGS, TYPICAL Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A112 05.03.2021 2021002 Checker MARINA BUILDING - FOUNDATION PLAN - FIRST FLOOR LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 1/16" = 1'-0" A-A112 1 FOUNDATION PLAN - MARINA BLDG ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 DN DN DN PLAN LEGEND BACK OF HOUSE & SUPPORT UNCONDITIONED 3 A-A202 2678 SF LOUNGE A-217 1 A-A202 A-A201 1 A-A201 2 A-A201 3 1151 SF BOH/SUPPORT A-219 2 A-A202 Sim Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A121 05.03.2021 2021002 Checker MARINA BUILDING - FLOOR PLAN - SECOND FLOOR LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 1/16" = 1'-0" A-A121 1 LEVEL 02 - MARINA ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 PRE-FINISHED STANDING SEAM METAL ROOFING SYSTEM BELOW PRE-FINISHED STANDING SEAM METAL ROOFING SYSTEM BELOW PRE-MANUFACTURED SHADE STRUCTURE A-A201 1 A-A201 2 A-A201 3 PRE-FINISHED STANDING SEAM METAL ROOFING SYSTEM BELOW Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A122 05.03.2021 2021002 Checker MARINA BUILDING - ROOF PLAN LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 1/16" = 1'-0" A-A122 1 ROOF PLAN - MARINA BUILDING ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 LEVEL 01 - MARINA 12' - 0" LEVEL 02 - MARINA 28' - 0" ROOF - MARINA 36' - 0" T.O. NEW BULKHEAD 7' - 0" T.O. DOCK 5' - 0" SEA LEVEL 0' - 0" STANDING SEAM METAL ROOF SYSTEM PRE-MANUFACTURED SHADE STRUCTURE PREFINISED GLASS RAILING SYSTEM MASONRY WALLS WITH PLASTER FINISH PLASTER REVEALS PLASTER BAND 8' - 0" 16' - 0" 24' - 0" LEVEL 01 - MARINA 12' - 0" LEVEL 02 - MARINA 28' - 0" ROOF - MARINA 36' - 0" T.O. NEW BULKHEAD 7' - 0" T.O. DOCK 5' - 0" STANDING SEAM METAL ROOF SYSTEM PRE-MANUFACTURED SHADE STRUCTURE PREFINISED GLASS RAILING SYSTEM MASONRY WALLS WITH PLASTER FINISH 24' - 0" 8' - 0" 16' - 0" LEVEL 01 - MARINA 12' - 0" LEVEL 02 - MARINA 28' - 0" ROOF - MARINA 36' - 0" STANDING SEAM METAL ROOF SYSTEM PRE-MANUFACTURED SHADE STRUCTURE PREFINISED GLASS RAILING SYSTEM MASONRY WALLS WITH PLASTER FINISH MASONRY WALLS WITH PLASTER FINISH STANDING SEAM METAL ROOF SYSTEM MASONRY WALLS WITH PLASTER FINISH 24' - 0" 8' - 0" 16' - 0" Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A201 05.03.2021 2021002 Checker MARINA BUILDING - ELEVATIONS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 SCALE: 1/16" = 1'-0" A-A201 1 ELEVATION - WEST - MARINA BUILDING SCALE: 1/16" = 1'-0" A-A201 2 ELEVATION - NORTH - MARINA BUILDING SCALE: 1/16" = 1'-0" A-A201 3 ELEVATION - EAST - MARINA BUILDING LEVEL 01 - MARINA 12' - 0" LEVEL 02 - MARINA 28' - 0" ROOF - MARINA 36' - 0" T.O. NEW BULKHEAD 7' - 0" T.O. DOCK 5' - 0" SEA LEVEL 0' - 0" 2472 SF CISTERN A-25 1035 SF KITCHEN A-210 1151 SF BOH/SUPPORT A-219 1262 SF RESTAURANT - COVERED OUTDOOR A-214 8' - 0" 16' - 0" 24' - 0" LEVEL 01 - MARINA 12' - 0" LEVEL 02 - MARINA 28' - 0" T.O. NEW BULKHEAD 7' - 0" T.O. DOCK 5' - 0" EXISTING BULKHEAD 3' - 0" SEA LEVEL 0' - 0" 16' - 0" LEVEL 01 - MARINA 12' - 0" LEVEL 02 - MARINA 28' - 0" T.O. NEW BULKHEAD 7' - 0" T.O. DOCK 5' - 0" EXISTING BULKHEAD 3' - 0" SEA LEVEL 0' - 0" 1428 SF CISTERN A-26 1691 SF RETAIL #1 A-209 16' - 0" 2' - 0" Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A202 05.03.2021 2021002 Checker MARINA BUILDING - SECTIONS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 SCALE: 1/8" = 1'-0" A-A202 1 SECTION - MARINA BUILIDNG - RESTAURANT SCALE: 1/8" = 1'-0" A-A202 2 SECTION - MARINA BUILDING - PORTE COCHERE SCALE: 1/8" = 1'-0" A-A202 3 SECTION - MARINA BUILDING - RETAIL Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A231 05.03.2021 2021002 Checker MARINA BUILDING - AXONOMETRIC VIEWS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: A-A231 1 MARINA BUILDING AXON NE SCALE: A-A231 2 MARINA BUILDING AXON NW ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A232 06/22/22 2021002 Checker OVERALL SITE AXON LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC ISSUANCES No. Drawing Issue Description Date 1 OVERALL SITE AXON Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com A-A233 09/15/22 2021002 Checker VIEW FROM APARTMENT NEXT DOOR LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC ISSUANCES No. Drawing Issue Description Date 4 CZM APPLICATION REVISION 12/15/2022 SCALE: A-A233 1 VIEW FROM SECOND LEVEL APARTMENT B-A121 1 B-A121 2 B-A121 3 B-A121 4 9289 SF WHAREHOUSE BAY B-10 134 SF RESTROOM B-11 131 SF RESTROOM B-12 PLAN LEGEND BACK OF HOUSE & SUPPORT MARINA STORAGE 30' - 0" 32' - 0" 32' - 0" 32' - 0" 148' - 0" 5 B-A121 68' - 0" 5 B-A121 1040 SF WAREHOUSE CISTERN B-01 1040 SF WAREHOUSE CISTERN B-02 EQ EQ 68' - 0" 34' - 0" Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com B-A101 05.03.2021 2021002 Checker WAREHOUSE - FLOOR PLANS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 3/32" = 1'-0" B-A101 1 FLOOR PLAN - WAREHOUSE SCALE: 3/32" = 1'-0" B-A101 2 FLOOR PLAN - WAREHOUSE - CISTERN LEVEL ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 B-A121 2 B-A121 4 5 B-A121 5 B-A121 Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com B-A102 05.03.2021 2021002 Checker WAREHOUSE - FOUNDATION PLANS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 3/32" = 1'-0" B-A102 1 CISTERN LEVEL FOUNDATION PLAN - WAREHOUSE BUILDING SCALE: 3/32" = 1'-0" B-A102 2 FOUNDATION PLAN - WAREHOUSE ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 B-A121 1 B-A121 2 B-A121 3 B-A121 4 SEAMLESS PREFINISHED GUTTER WITH INTEGRAL DOWN LEADER STANDING SEAM METAL ROOF SYSTEM SKYLIGHT WINDOW SYSTEM ROOF CAP FLASHING SKYLIGHT WINDOW SYSTEM SEAMLESS PREFINISHED GUTTER WITH INTEGRAL DOWN LEADER 5 B-A121 Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com B-A103 05.03.2021 2021002 Checker WAREHOUSE - ROOF PLAN LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 3/32" = 1'-0" B-A103 1 ROOF PLAN - WAREHOUSE ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 LEVEL 1 9' - 0" SKYLIGHT WINDOW SYSTEM OVERHEAD DOOR HOLLOW METAL DOOR MASONRY STRUCTURE WITH PLASTER FINISH SEAMLESS PREFINISHED GUTTER WITH INTEGRAL DOWN LEADER PLASTER BAND PLASTER REVEALS PLASTER BAND 14' - 0" STANDING SEAM METAL ROOF SYSTEM LEVEL 2 27' - 0" LEVEL 1 9' - 0" MASONRY STRUCTURE WITH PLASTER FINISH STANDING SEAM METAL ROOF LOUVERED VENT PLASTER REVEAL PLASTER BAND PLASTER BAND LEVEL 2 27' - 0" LEVEL 1 9' - 0" HOLLOW METAL DOOR SKYLIGHT WINDOW SYSTEM MASONRY STRUCTURE WITH PLASTER FINISH SEAMLESS PREFINISHED GUTTER WITH INTEGRAL DOWN LEADER PLASTER BAND PLASTER REVEALS PLASTER BAND STANDING SEAM METAL ROOF SYSTEM HOLLOW METAL DOOR LEVEL 2 27' - 0" LEVEL 1 9' - 0" MASONRY STRUCTURE WITH PLASTER FINISH STANDING SEAM METAL ROOF LOUVERED VENT PLASTER REVEAL PLASTER BAND PLASTER BAND LEVEL 2 27' - 0" LEVEL 1 9' - 0" CISTERN LEVEL 0' - 0" PRE-MANUFACTURED STEEL-FRAMED STRUCTURE CISTERN CHAMBER CISTERN CHAMBER LEVEL 2 27' - 0" 18' - 0" 29' - 8" Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com B-A121 05.03.2021 2021002 Checker WAREHOUSE - ELEVATIONS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: 3/32" = 1'-0" B-A121 1 WAREHOUSE BLDG - EAST ELEVATION SCALE: 3/32" = 1'-0" B-A121 2 WAREHOUSE BLDG - NORTH ELEVATION SCALE: 3/32" = 1'-0" B-A121 3 WAREHOUSE BLDG - WEST ELEVATION SCALE: 3/32" = 1'-0" B-A121 4 WAREHOUSE BLDG - SOUTH ELEVATION ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 SCALE: 3/32" = 1'-0" B-A121 5 WAREHOUSE BLDG - CROSS SECTION Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com B-A231 05.03.2021 2021002 Checker WAREHOUSE BUILDING - AXONOMETRIC VIEWS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC SCALE: B-A231 1 WAREHOUSE BUILDING AXON NW SCALE: B-A231 2 WAREHOUSE BUILDING AXON SE ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 4 CZM APPLICATION REVISION 12/15/2022 1 OF 2S1 PROPERTY Site Plan ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF PAUL FERRERAS, PE. THE CONCEPTS, IDEAS DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED , DEVELOPED AND PRESENTED FOR USE ON THE SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WITHOUT EXPRESS WRITTEN CONSENT OF PAUL FERRERAS, PE. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR REFERENCE PURPOSE ONLY. REVISIONS DESCRIPTION DATE No STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St.Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 VIRGIN ISLANDS LICENSE No 481E FLORIDA LICENSE No 56408 NEW JERSEY LICENSE GE 32849 NEW YORK LICENSE No 059450 DATE As Shown SCALE PAUL FERRERAS, PE Written dimensions have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the project. Paul Ferreras, PE must be notified immediately in writting of any variation from the dimensions and conditions shown on the plans. Field verify all conditions prior to laying out or fabricating work. Bring to the Engineer's attention any deviation from designed conditions and field conditions prior to preceeding with any work and cooperate with Engineer to modify such conditions at no additional cost to the owner, Engineer or consultants. Shop drawings must be submitted to the Engineer and reviewed by the Engineer prior to ordering materials, fabrication and delivery to the site, unless otherwise provided for under the specific contractural agreement between the Engineer and Client. Paul Ferreras, PE expressly reserves its common law copyright and other property rights in these documents. These documents are not to be repoduced, changed or copied in any form or manner whatsoever nor are they to be assigned to a third party without first obtaining the writen permission and/or written consent of Paul Ferreras, PE, in the event of unauthorized use of these documents by a third party, the third party shall hold Paul Ferreras, PE harmless and agrees to remunerate Paul Ferreras, PE for such use in an amount equal to the original fee fo the original documents, plus legal fees, court costs, collection fees and other costs. LATITUDE 18 MARINA 9B-A ESTATE NAZRETH ST.THOMAS, USVI paul@pfpe.pro April 26th 2021 SITE PLAN SCALE: 1" = 20' 1 S1 59' Boat Lift Bulkhead Return ± 10" 225.5' Main Bulkhead 20' Return Deadman Tie Back 20' 2 OF 2S2 PROPERTY Bulkhead Sections ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF PAUL FERRERAS, PE. THE CONCEPTS, IDEAS DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED , DEVELOPED AND PRESENTED FOR USE ON THE SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WITHOUT EXPRESS WRITTEN CONSENT OF PAUL FERRERAS, PE. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR REFERENCE PURPOSE ONLY. REVISIONS DESCRIPTION DATE No STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St.Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 VIRGIN ISLANDS LICENSE No 481E FLORIDA LICENSE No 56408 NEW JERSEY LICENSE GE 32849 NEW YORK LICENSE No 059450 DATE As Shown SCALE PAUL FERRERAS, PE Written dimensions have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the project. Paul Ferreras, PE must be notified immediately in writting of any variation from the dimensions and conditions shown on the plans. Field verify all conditions prior to laying out or fabricating work. Bring to the Engineer's attention any deviation from designed conditions and field conditions prior to preceeding with any work and cooperate with Engineer to modify such conditions at no additional cost to the owner, Engineer or consultants. Shop drawings must be submitted to the Engineer and reviewed by the Engineer prior to ordering materials, fabrication and delivery to the site, unless otherwise provided for under the specific contractural agreement between the Engineer and Client. Paul Ferreras, PE expressly reserves its common law copyright and other property rights in these documents. These documents are not to be repoduced, changed or copied in any form or manner whatsoever nor are they to be assigned to a third party without first obtaining the writen permission and/or written consent of Paul Ferreras, PE, in the event of unauthorized use of these documents by a third party, the third party shall hold Paul Ferreras, PE harmless and agrees to remunerate Paul Ferreras, PE for such use in an amount equal to the original fee fo the original documents, plus legal fees, court costs, collection fees and other costs. LATITUDE 18 MARINA 9B-A ESTATE NAZRETH ST.THOMAS, USVI paul@pfpe.pro April 26th 2021 BULKHEAD SECTION A SCALE: 1/2" = 1'-0" 1 S2 BULKHEAD SECTION B SCALE: 1/2" = 1'-0" 2 S2 ROCK EMBEDMENT BOARD WALK PILE CAP FINISHED GRADE TIE BACK TIE BACK EXIST SHEET PILE DEAD MAN RAMP (TIE BACK) EXIST GRADE ± DEAD MAN PILE CAP SHEET PILE DROP BULKHEAD FOR BOAT LIFT SLOPE MSL +5.0 5'-0" 5'-0"± JR-1 Boring, 118 pcf Sand ɸ=30°, 12'-0" 3'-0" 7'-0" 120'-0"± JR-1 Boring, 118 pcf Sand ɸ=30°, 12'-0" Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com M101 05.03.2021 2021002 Checker MARINA & MOORING EXHIBITS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com M102 05.03.2021 2021002 Checker MARINA & MOORING EXHIBITS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com M103 05.03.2021 2021002 CB MARINA & MOORING EXHIBITS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022 Project Architect Project No. Date Drawing No. NOT ISSUED FOR CONSTRUCTION A DESIGN DISTRICT, PLLC 2110 Company Street, Suite 15 Christiansted, VI, 00820 Tel: (340)-227-6265 Email: designdistrictvi.com Website: www.designdistrictvi.com No. 33 Dronigens Gade - Queen's Quarter Post Office Box 6218 St. Thomas, USVI, 00804 Tel: (340)-777-1600 Email: jaredian2@vipowernet.net PAUL FERRERAS, PE STRUCTURAL ENGINEER 9-1 Bellevue, POB 600122 St. Thomas, USVI 00801 Phone (340) 714-5435 Fax (340) 777-5779 paul@pfpe.pro 1200 Hillcrest Street, Suite 200 Orlando, FL, 32803 Phone: (407)-629-4777 Email: info@harriscivilengineers.com 2047 Vista Parkway, Suite 101 West Palm Beach, FL, 33411 Contact: Esteban Biondi Phone:561-472-2145 Email: ebiondi@appliedtm.com M104 05.03.2021 2021002 Checker MARINA & MOORING EXHIBITS LATITUDE 18 MARINA REM. CONSOLIDATED 9B-A NAZARETH ST. THOMAS, USVI ♦ JACK ROCK B-A C LLC ISSUANCES No. Drawing Issue Description Date 2 CZM APPLICATION 5/5/2021 3 CZM APPLICATION REVISION 1/15/2022