2006-2007 FACT BOOK
Facilities 2006-2007 FACT BOOK FACILITIES Facilities Maintenance* Volume of Deferred Maintenance 1999 - $27M 2001 - $17M 2004 - $ 7M 2006 - $ 10M 2007 - $ 11M Physical Condition of Facilities Classrooms 1999 – Poor 2004 – 2007 Very Good Physical Condition of Facilities Faculty Offices 1999 – Fair 2004 – 2007 Good Dormitories 1999 – Poor/Fair 2004 – 2007 Very Good Assembly Halls/Grounds 1999 – Fair 2004 – 2007 Very Good Faculty/Admin Residences 1999 – Fair 2004 – Good 2006 - 2007 Excellent *Based on 1999 Facilities Needs Assessment ** Adjusted for inflation Capital Projects Summary AY 2006-2007 Major systems upgrades and renovation Both Campuses Solar Safety and Security Site Project St. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://www.uvi.edu/files/documents/Institutional_Research_and_Planning/IDS06-07/Section9.pdf
SHA-256 ea85f446c1435767a10b0e0dc59c23fed36e66d9d9c4ab41e171348736355cdf
Re-using this document
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-ea85f446c143
Document text
Facilities 2006-2007 FACT BOOK FACILITIES Facilities Maintenance* Volume of Deferred Maintenance 1999 - $27M 2001 - $17M 2004 - $ 7M 2006 - $ 10M 2007 - $ 11M Physical Condition of Facilities Classrooms 1999 – Poor 2004 – 2007 Very Good Physical Condition of Facilities Faculty Offices 1999 – Fair 2004 – 2007 Good Dormitories 1999 – Poor/Fair 2004 – 2007 Very Good Assembly Halls/Grounds 1999 – Fair 2004 – 2007 Very Good Faculty/Admin Residences 1999 – Fair 2004 – Good 2006 - 2007 Excellent *Based on 1999 Facilities Needs Assessment ** Adjusted for inflation Capital Projects Summary AY 2006-2007 Major systems upgrades and renovation Both Campuses Solar Safety and Security Site Project St. Croix Completed North West Wing and North West Wing Annex Construction Exterior Repair and Repainting of the Evans Center Exterior Repair and Painting of Research and Extension Center Research and Extension Center Air Conditioning System and Ductwork Replacement In-Progress/Design Campus Electric Service Upgrade Evans Center Occupancy and AC Sensor Installation Student Activities Building Fitness Center St. Thomas Completed Occupancy Lighting and A/C sensor installation Upper Campus Buildings and S&F Center East Complex Parking Area Expansion Administration and Conference Center East Complex Conversion from Residential to Institutional North Dormitory Parking Area Expansion South Dormitory Bathroom Upgrades In-Progress Administration and Conference Center OFFICE OF INSTITUTIONAL RESEARCH AND PLANNING, UNIVERSITY OF THE VIRGIN ISLANDS 113