Total Major Project summary
GOVERNMENT OF THE: VIRGIN ISLANDS OF THE UNITED STATES DEPARTMENT OF PLANNING AND NATURAL RESOURCES. DEVELOPMENT PERMIT APPLICATION FORM L&WD-4 . MAJOR PROJECT SUMMARY DATA Section I. Applicant 1. Name, address. and telephone number of applicant. TotalEnergies’ ‘Marketing PuertoRico Corp. ‘ Phone: 787-397-8560 PO Box 362916 Email: anthony sisco@totalenergies.com San Juan PR 00936-2916 Contact: Anthony J. Sisco 2. "Name, address and telephone number of owner of Property and of developer: Virgin islands:-Port Authority Phone: (340) 774-1629. PO Box 301707 St Thomas, USVI 00802 Section UH. Summary of Proposed Development 3. Describe the proposed devclopmént Please refer io document titled "Scape-of Works Summary for Repair and Maintenance of the Airport Fuel Terminal located-at thé CytilE. King Airport." Section HI. Description of Proposed Development 4, Name of-development TotalEnergies Fuel Terminal 5, Plat No., 70¥ Lindbergh Bay; Southside Quarter 4A. 6. Zoning: District: Public (P) 7, PWD Map No, 93-405-T86 8: Proposed use (residential, ctc. as. listed:in Zoning Law):. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpnr.vi.gov/wp-content/uploads/2025/11/Total-Major-Project-summary-.pdf
SHA-256 facedcce3cb3d5f6eaafe7fad067f8c847d67840836175864861d857be9133c7
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-facedcce3cb3
Document text
GOVERNMENT OF THE: VIRGIN ISLANDS OF THE UNITED STATES DEPARTMENT OF PLANNING AND NATURAL RESOURCES. DEVELOPMENT PERMIT APPLICATION FORM L&WD-4 . MAJOR PROJECT SUMMARY DATA Section I. Applicant 1. Name, address. and telephone number of applicant. TotalEnergies’ ‘Marketing PuertoRico Corp. ‘ Phone: 787-397-8560 PO Box 362916 Email: anthony sisco@totalenergies.com San Juan PR 00936-2916 Contact: Anthony J. Sisco 2. "Name, address and telephone number of owner of Property and of developer: Virgin islands:-Port Authority Phone: (340) 774-1629. PO Box 301707 St Thomas, USVI 00802 Section UH. Summary of Proposed Development 3. Describe the proposed devclopmént Please refer io document titled "Scape-of Works Summary for Repair and Maintenance of the Airport Fuel Terminal located-at thé CytilE. King Airport." Section HI. Description of Proposed Development 4, Name of-development TotalEnergies Fuel Terminal 5, Plat No., 70¥ Lindbergh Bay; Southside Quarter 4A. 6. Zoning: District: Public (P) 7, PWD Map No, 93-405-T86 8: Proposed use (residential, ctc. as. listed:in Zoning Law):. Airplane and Aircraft Services (fuel sales) 9. Accessory use ifany N/A FORM L& WD-4 MAJOR PROJECT SUMMARY DATA Cont'd ‘Section IV. Coniments 26. Proposed Potable Water Supply (method & quality estimate gal/day) Existing Facility, On Site Water Tanks 250 gls/day avg. 27. Proposed. Sewage Treatment (method & quality estimate gal/day) Existing sewer discharge, 350 gls/day avg 28. Proposed Solid Waste Disposal (method & quality estimate Ibs/day) Existing Facility, 80 Ibs/day avg. 29. Proposed Electrical Supply (method & demand estimate KWH for single & 3 phase) Existing Facility (3-phase, 190 kWh/day avg.) 30. Air Conditioning (method & demand-estimate (KWH) Inverter type split units 2 @ 36,000 btu each, 85. kWh 31. Othér Utilities None 32. Other N/A Section V. 33. Will the development extend onto or adjoin any beach tidelands, submerged daids or public trust lands? emen aS5SOCciateG WN ine Proje Are ated on ed ome rded lands, Both, repair and maintenance oF ihe }x ng Improve men and modifications of thé terminat'facility, will take place'on filled.sulbmerged lands. No proposed modifications ‘and only.contiriued use of any- existing improvements on submerged lands: 34. will the development maintain, enhance oF conflict with public access 10 the shoreline and along tlic coast? No modifications to existing improvements 35. Will the development protect or provide: modcrale income housing opportunities? Will it displace moderate income housing?: No. : : 36. How will the: development affect traffic on the coastal access.roads? WA fi — Mliowy, JEG 6/6/2025 Sipwature of owner or authorized agent ‘Date